You are on page 1of 2

4.

7 COSTING

The project have limited budget to vary the costs of materials, devices, testing, labor expenses
and other expenses. All the expenditures incurred are grouped and tabulated as shown in Table 4.7

DESCRIPTION QUANTITY UNIT UNIT PRICE AMOUNT


(PHP)
MATERIAL EXPENSES
Mechanical Components
Galvanized Iron Sheet 690
Steel Plate 10 kgs 20/kg 200
Cement 230
Pole 1222
Nuts and Bolts 16 pcs 15/pcs 296
Washers 10 pcs 1/pcs 10
Flat bar 278
Angle bar 322
Tools and Auxillaries
Welding rod 250
Electric tape 41
Electrical Components
Wire (6.1 mm) 20
Magnetic wires 3.5 grams 100.00/g 350
Male and Female wire 65
connector
USB hub 4 port 2 pcs 89/pcs 178
Battery indicator 175
Charge Controller 600
DC generator 1,200
Battery 6,000
Inverter 1,200
Aesthetic
Paint 380
Utility Brush 2 Pcs 35/pcs 70
Paint Thinner 35
LABOR EXPENSES
Fabrication
Repairs
OTHERS
Transportation
Printing
MAIN COMPONETS
Savonius vertical Wind
Turbine
30W Flexible Poly 1,280
crystalline Solar Panel
Treadle wheel 300
Treadle pad 75

TOTAL 14,846
GRAND TOTAL

You might also like