Proect: HMI Project in indonesia
i izing : Press, Body, Pant,
HEIN Work Instructions JAssembiy, Engine
boc no : wnat-w-ca-200227-002
Contract Name RC Works Date 27/02/2020
General Contrator FT, TAKENAKA INDONESIA Origin by Febrisel Asta (Quality)
Work instruction [Approval of Waterproofing Supplier & Material
No Detail Reference Ration | PricetiDR)
RSE Meeting Mine Or Te Fabroary TOD aboot STUCTT
System
and ie Design (File Attached), Regarding subject aumber one
(waterproot materia Pease follow up result ofthe meeting by oe
starting 2
peprval process for Waterproof supplier and material, The materia
be
comply to specification that decided in ast meeting
re attaches,
eemark= Attached DOC
1 Meeting Minute
2, Waterproof Specification
Reva
[Sub Contrator] Sub Contrator] Sub Contrator Incharge | senior Mgr | Planning PM
Received Approval
7 o 7 2 /12F l= lo DBessy
3] 2| & [Meeting Minute]
Subject Structural system and Pile Design ~
Location Date Time Writer
TAKENAKA office "18h FEB, 2020 15:00~17:00 Yoon
Attendee
PT HEIN, TAKENAKA,
Conference Agenda
1. Waterproof material
~ Waterproof materials are decided as attached.
2. Parameter wall plan is needed for rebar works (open part, closed part)
- All opening dimensions for external door are to be marked in the architectural plan
3. Top of steel level of the mezzanine floor of main shops is missing in the steel drawings.
= Itis to be applied in the next revision drawings
4. Syphonic drain details are being developed.
5. Architectural drawing schedule
~ All architectural drawings for 5-main bldgs, 3-Utility bldgs, R&D center including details are to be
submitted by the end of Feb. for approval
~ Doors and windows schedule for 3-utility bigds is to be submitted by 21% Feb.
- The other bldgs including details are to be submitted by the end of Mar. for approval
HMMI Project in IndonesiaCH Qj
COMPARASION of WATERPROOFING MATERIAL
ee 1 TESST | mene a
bee eecerieisen a ¥ | tenner
Sener [eae ‘Dest am ae 4 an
a oon ie “pmectir® | meroromee |: frs= [ee feet |
a [ —, ne : a
= Se :