PRELIMINARY ANALYSIS OF CHANGING OF ALIGNMENT FOR SAMAI TO VARANG AXIS
Alignments Advantages Disadvantages
1. Zorinpui-Samai- Short Route Only 3 villages covered DoJaung-Kaletwa till Dojaung. Heavy Earthwork will be required due to steep/hilly terrain Work can be commenced from one side only(i.e Zorinpui) Problem in water & logistics supply Survey work will be more time taking. 2. Zorinpui-Varang- More villages can be Three small villages Dojaung-Kaltewa covered till Dojaung ( neglected, however Nos of Beneficiary will be the alignment goes more) , The close to these villages. reconnaissance survey is The number of in progress. structures / length Alignment will be of the structures followed by the natural maybe differed from alignment of Singlui the agreement. River The length of stretch Comparatively less may be increase of earthworks will be about 3.2-3.8 Km required. Hence design speed will be enhanced Due to smooth gradient of the alignment, the wear and tear cost of the vehicle and the carriageway will be less. Work can be commenced from 3 sides and water from construction purpose will be available. Hence progress of work can be faster. Zorinpui-Varang Varang Down till 5 km From Down (10km) towards varang-5 km Water Available from River Singlui for construction purpose Logistics facilitated by movement on boats over River Singlui Myanmar army posts enroute provides security Generally hard soil / soft rock will be found at river side stretches which may reduce the length of breast wall & retaining wall. Easy survey from river bank side