You are on page 1of 10

ROW

ROW

ROW

ROW
ROW

ROW

ROW

ROW
ROW

ROW

10
ROW

ROW
0% -3.500% -2.500% -2.500% -3.500%

0.0
.00
-50

00
-2.500% -2.500%

%
-3.500% -3.500%

-50 -50
.00 .0
0% 00%
ROW

ROW

ROW

ROW
Level Datum =113.000
Level Datum =113.000
Design Levels(m)

-7.452 121.358

-6.000 122.084

-3.500 122.159

0.000 122.247

3.500 122.159

6.000 122.084

21.605 114.282
21.690 113.890
Design Levels(m)

124.316

121.639

121.714

121.801

121.714

121.639

19.516 115.066 19.180 115.049


Design Offsets(m)

-8.677

-6.000

-3.500

122.310 -0.000

3.500

6.000
Design Offsets(m)
-25.000 128.122

-21.793 126.791
-21.183 126.621

-12.720 123.028
-10.907 122.298
-10.762 122.252

121.209

119.250

118.395
118.369

116.268
115.906
115.810

11.853 115.691
12.647 115.145

15.487 115.228

17.861 114.963

22.098 113.747

24.359 113.356
25.000 113.276

-25.000 131.557

-15.041 125.850

-13.634 125.410

122.285
122.070
121.646

13.046 115.606
14.408 116.017

17.018 114.941

20.629 114.960
20.638 114.957

22.853 113.609

25.000 113.570
Existing Ground levels(m)
Existing Ground levels(m)
-6.900

0.000

2.086
2.707

8.306
9.105
9.669
Existing Ground Offsets(m)

0.000
0.536
0.772
1.742
Existing Ground Offsets(m)
-23.31

-23.711
21.69

21.312
Right of Way(m)
Right of Way(m)
Chainage =106100.000
Chainage =106140.000

ROW

ROW
ROW

ROW

ROW

ROW
ROW

ROW -2.500%

10
-3.500% -2.500% -3.500%
10

ROW

ROW
0.0
ROW

ROW
0.0

00
00

%
%

-3.500% -2.500% -2.500% -3.500%

-50
.0 00%
-50
.00
0%

ROW

ROW
ROW

ROW

Level Datum =114.000 Level Datum =112.000


Design Levels(m)

-6.473 122.279
-6.000 121.807

-3.500 121.882

120.110 -0.000 121.969

3.500 121.882

6.000 121.807

21.560 114.027
21.648 112.197
Design Levels(m)
125.819

122.472

122.547

122.634

122.547

122.472

115.524 19.861 115.541


-9.347

-6.000

-3.500

Design Offsets(m)
123.115 0.000

3.500

6.000

Design Offsets(m)

-25.000 128.490

-20.650 126.742
-20.646 126.740

120.130
119.978

13.738 112.385

18.968 112.314

25.000 112.051
-25.000 130.875

-21.753 129.724

-18.168 128.250

17.516 116.125

115.719
115.564
115.565

25.000 114.985

Existing Ground levels(m) Existing Ground levels(m)

0.000
0.358
0.747
19.244
19.665
20.122
20.237

Existing Ground Offsets(m)


0.000

Existing Ground Offsets(m)

-23.359

21.648
-23.565

21.439

Right of Way(m) Right of Way(m)


Chainage =106080.000 Chainage =106120.000

DRAWING TITLE:
AUTHORITY: AUTHORITY ENGINEER: PROOF CONSULTANT: SAFETY CONSULTANT: EPC CONTRACTOR: SUB CONTRACTOR: DESIGN CONSULTANT: CROSS SECTION
FROM CH.106/080 TO 106/140

R04 23.06.20 REVISED AS PER AUTHORITY ENGINEER'S COMMENTS OP & HS


DRAWN: DESIGN: CHECKED: APPROVED:
418,Saheed nagar
R03 06.05.20 Bhubaneswar, 751007 S. BISWAL S. BISWAL UK PANI
REVISED AS PER AUTHORITY ENGINEER'S COMMENTS
DATE: SCALE:
R02 10.04.20 REVISED AS PER PROOF CONSULTANTS COMMENTS
Construction of Two Lane Road on NH 23/06/2020 HORIZONTAL =100 VERTICAL =100
DESIGN AID Specification from Paletwa to
R01 23.03.20 REVISED AS PER DETAIL TOPO SURVEY Ministry of external Affairs Ircon infrastructure & Services Ltd. STUP Consultants Pvt. Ltd. Plot No. 54 (2nd Floor Front Side), Engineering Projects (India) RK-RPP (JV) India-Myanmar border (Zorinpui) from DRAWING NO: REV: SIZE:
Government of India C-4, District Centre, Saket, New Delhi 1112, Vishal Tower, District Centre, Masoodpur Dairy Farm. Km 0.000 to KM 109.200 in Chin State OP&HS/KMMP/CS/26
Limited R04 A3
REV. DATE DESCRIPTION New Delhi -110017 Janakpuri, New Delhi-110 058 Vasant Kunj, New Delhi-110070 Myanmar.
ROW

ROW

ROW
ROW
ROW

ROW

ROW
ROW
10
0.0
00
%
ROW

ROW

ROW
ROW
0%
.00
-3.500% -2.500% -2.500% -3.500%

0
10
ROW
10
0.0
00 %
%
00
0.0
10

ROW

ROW
ROW
Level Datum =122.000
-3.500% -2.500% -2.500% -3.500%
Level Datum =113.000 Design Levels(m)

-25.495 142.306 -25.495 142.306

122.911
122.028

122.103

122.190

122.103

122.028

13.996 130.023
Design Levels(m) -20.535 136.168

121.633

121.708

121.795

121.708

121.633
122.319

-6.100
-6.000

-3.500

136.450 0.000

3.500

6.000
Design Offsets(m)

-6.000

-3.500

128.500 0.000

3.500

6.000
6.686
Design Offsets(m)
Existing Ground levels(m)

-19.609 139.051

-18.073 138.526
138.460

136.289

134.787

132.998

11.505 131.343

13.071 130.511
130.418

18.569 128.045

23.145 125.826

25.000 124.753
Existing Ground levels(m)
-25.000 138.005

-18.521 135.339

128.423
127.725

120.158

12.567 117.791

17.111 116.242

23.070 114.144

25.000 113.956
113.757
Existing Ground Offsets(m)

-18.238

12.747
0.000

1.534

5.412

8.835
24.709
0.000
1.167
2.009

8.555
Existing Ground Offsets(m)

-25.495
Right of Way(m)

19.505
-25.096

19.921
Right of Way(m)
Chainage =106220.000
Chainage =106180.000

ROW

ROW
ROW

ROW

ROW

ROW
ROW

ROW
10
0.0
00
%

ROW

ROW
ROW

ROW
0%
.00
-3.500% -2.500% -2.500% -3.500%100
10
0.0
00
%

00%
0.0
10

ROW

ROW
ROW

ROW
-3.500% -2.500% -2.500% -3.500%

Level Datum =114.000 Level Datum =119.000


Design Levels(m) Design Levels(m)

-25.391 141.185

121.794

121.869

121.957

121.869

121.794

10.144 125.938
-15.258 130.839

121.581

121.656

121.744

121.656

121.581
122.383

-6.000

132.228 -3.500
-6.000

125.786 -3.500

130.889 0.000

3.500

6.000
125.950 0.000

3.500

6.000
6.802

Design Offsets(m) Design Offsets(m)

-25.000 140.922

-18.430 138.241

-16.829 137.342

132.601

130.689
130.591

127.743

126.312

14.881 122.979
15.194 122.783
15.729 122.644

21.131 120.698

25.000 119.383
-24.366 -25.000 135.254

-19.431 132.855

-17.769 131.921

125.734

13.629 118.511
14.378 118.179

16.353 118.193
16.769 118.045
17.883 117.796

21.062 116.232
21.891 115.942

25.000 114.577

Existing Ground levels(m) Existing Ground levels(m)

-4.438
-3.850
-3.537

0.000

1.325
1.494

5.590

9.545
0.000

0.891

Existing Ground Offsets(m) Existing Ground Offsets(m)

-25.391

19.609
20.683

Right of Way(m) Right of Way(m)


Chainage =106160.000 Chainage =106200.000

DRAWING TITLE:
AUTHORITY: AUTHORITY ENGINEER: PROOF CONSULTANT: SAFETY CONSULTANT: EPC CONTRACTOR: SUB CONTRACTOR: DESIGN CONSULTANT: CROSS SECTION
FROM CH.106/160 TO 106/220

R04 23.06.20 REVISED AS PER AUTHORITY ENGINEER'S COMMENTS OP & HS


DRAWN: DESIGN: CHECKED: APPROVED:
418,Saheed nagar
R03 06.05.20 Bhubaneswar, 751007 S. BISWAL S. BISWAL UK PANI
REVISED AS PER AUTHORITY ENGINEER'S COMMENTS
DATE: SCALE:
R02 10.04.20 REVISED AS PER PROOF CONSULTANTS COMMENTS
Construction of Two Lane Road on NH 23/06/2020 HORIZONTAL =100 VERTICAL =100
DESIGN AID Specification from Paletwa to
R01 23.03.20 REVISED AS PER DETAIL TOPO SURVEY Ministry of external Affairs Ircon infrastructure & Services Ltd. STUP Consultants Pvt. Ltd. Plot No. 54 (2nd Floor Front Side), Engineering Projects (India) RK-RPP (JV) India-Myanmar border (Zorinpui) from DRAWING NO: REV: SIZE:
Government of India C-4, District Centre, Saket, New Delhi 1112, Vishal Tower, District Centre, Masoodpur Dairy Farm. Km 0.000 to KM 109.200 in Chin State OP&HS/KMMP/CS/27
Limited R04 A3
REV. DATE DESCRIPTION New Delhi -110017 Janakpuri, New Delhi-110 058 Vasant Kunj, New Delhi-110070 Myanmar.
ROW

ROW

ROW
ROW
ROW

ROW

ROW
ROW
ROW

10
0.0
00
%

10
0.0
00
%
ROW

ROW
ROW
ROW

%
00
0.0
10
%
-2.124%

00
-3.500% -2.500% -3.360%

ROW

ROW
0.0
10

ROW
ROW

-3.500% -2.500% -2.500% -3.500%


Level Datum =119.000
Level Datum =121.000
Design Levels(m)

-20.545 137.513

122.968

123.043

123.130

123.056

122.972

126.293
Design Levels(m)
-25.704 149.948

130.344
122.498

122.573

122.660

122.573

122.498

11.553 128.050

-6.000

132.814 -3.500

130.022 0.000

3.500

127.814 6.000

126.467 9.321
Design Offsets(m)

139.779 -6.100
139.436 -6.000

-3.500

133.412 0.000

3.500

6.000
Design Offsets(m)

-24.661 138.616

-14.263 135.829

-10.869 135.161
-10.062 134.809
135.165

134.332

130.300
130.143

128.795

10.872 125.457

14.542 124.628
14.926 124.589

19.802 122.625
20.137 122.528

25.000 119.962
133.469
-25.000 149.595

-15.260 144.717
-14.864 144.353

-10.435 142.015

133.446

131.050

9.710 129.237
10.600 128.765

14.687 125.699

18.617 123.265

23.083 122.047

25.000 121.864
Existing Ground levels(m)
Existing Ground levels(m)

-10.079

-8.131

-3.662

0.000

1.498
2.079

4.491
5.756

9.000
Existing Ground Offsets(m)

-6.199
-5.862

1.910
0.000

1.963

6.514
Existing Ground Offsets(m)

-25.912

19.089
-25.704

19.297
Right of Way(m)
Right of Way(m)
Chainage =106300.000
Chainage =106260.000
ROW

ROW
ROW

ROW

ROW

ROW
ROW

ROW
10
0.0
00
%

ROW

ROW
ROW

ROW

10
ROW

ROW
0.0
00
%
ROW

ROW

%
00
0.0

ROW

ROW
%
10

00
0.0
ROW

10
ROW

-3.500% -2.500% -2.500% -3.500%


-3.500% -2.500% -2.500% -3.500% Level Datum =122.000
Level Datum =121.000 Design Levels(m)

127.957
122.733

122.808

122.895

122.808

122.733

10.819 127.080 10.529 127.262


Design Levels(m)
138.475
122.263

122.338

122.425

122.338

122.263

13.570 129.833

-6.100
-6.000

-3.500

130.417 0.000

3.500

128.950 6.000
Design Offsets(m)
-6.100
-6.000

-3.500

136.756 0.000

3.500

135.074 6.000

Design Offsets(m)

-25.000 147.244

-20.717 145.009

-19.171 144.339

-10.148 136.028
-9.839 135.903

133.905
133.736

132.243

130.412

129.150

10.148 127.500

14.861 125.254
16.031 124.935

20.178 124.388

22.224 124.200

25.000 123.303
Existing Ground levels(m)
-25.000 157.567

-19.203 153.622

-17.643 152.864

147.256
147.119

141.096

136.753
136.547

135.427
135.226

132.902

25.000 121.260

Existing Ground levels(m)

-5.127
-4.381

-1.267
0.000

2.153

5.333
5.675
Existing Ground Offsets(m)
-8.719
-8.460

-2.552

0.000

1.676
2.221

4.736
5.117
5.385

9.478

Existing Ground Offsets(m)


-25.808

19.193
Right of Way(m)
19.401
-25.6

Right of Way(m)
Chainage =106280.000

Chainage =106240.000
DRAWING TITLE:
AUTHORITY: AUTHORITY ENGINEER: PROOF CONSULTANT: SAFETY CONSULTANT: EPC CONTRACTOR: SUB CONTRACTOR: DESIGN CONSULTANT: CROSS SECTION
FROM CH.106/240 TO 106/300
R04 23.06.20 REVISED AS PER AUTHORITY ENGINEER'S COMMENTS OP & HS
DRAWN: DESIGN: CHECKED: APPROVED:
418,Saheed nagar
R03 06.05.20 REVISED AS PER AUTHORITY ENGINEER'S COMMENTS Bhubaneswar, 751007 S. BISWAL S. BISWAL UK PANI

DATE: SCALE:
R02 10.04.20 REVISED AS PER PROOF CONSULTANTS COMMENTS
Construction of Two Lane Road on NH 23/06/2020 HORIZONTAL =100 VERTICAL =100
R01 23.03.20
DESIGN AID Specification from Paletwa to
REVISED AS PER DETAIL TOPO SURVEY Ministry of external Affairs Ircon infrastructure & Services Ltd. STUP Consultants Pvt. Ltd. Plot No. 54 (2nd Floor Front Side), Engineering Projects (India) RK-RPP (JV) India-Myanmar border (Zorinpui) from DRAWING NO: REV: SIZE:
Government of India C-4, District Centre, Saket, New Delhi 1112, Vishal Tower, District Centre, Masoodpur Dairy Farm. Km 0.000 to KM 109.200 in Chin State OP&HS/KMMP/CS/28
Limited R04 A3
REV. DATE DESCRIPTION New Delhi -110017 Janakpuri, New Delhi-110 058 Vasant Kunj, New Delhi-110070 Myanmar.
ROW

ROW
ROW

ROW

ROW

ROW
ROW

ROW

ROW

ROW
ROW

ROW

10
0.0
00
%
10

%
0.0

00
00

0.0
%

10
-0.500%

ROW

ROW
-5.556% 5.556%
ROW

ROW
-5.556%
5.556% -0.500%
-5.556% -5.556% -50
.00
0%

Level Datum =121.000 Level Datum =120.000


Design Levels(m) Design Levels(m)

-16.351 133.025

123.274

123.413

123.641

123.835

123.823

125.406
-13.939 130.533

123.194

123.333

123.560

123.755

123.742

122.684

-6.600

129.231 -4.100

127.665 0.000

3.500

6.000

125.374 7.583
127.229 -6.600

-4.100

126.200 -0.000
Design Offsets(m)

3.500

6.000

122.505 8.117
Design Offsets(m)

-25.000 137.003

-21.448 134.923
-20.758 134.404

-18.330 133.841

-14.832 132.437
132.406

-12.759 131.774

130.843

129.248

125.013

25.000 120.602
-25.000 135.770
-24.035 135.499
-22.668 134.446

-12.676 129.966
-12.216 129.807

127.309

125.590
125.415

124.749
124.624

122.511

12.510 125.765
125.742

25.000 121.830
Existing Ground levels(m) Existing Ground levels(m)

-14.923

-9.680

-4.455
-4.343

0.000

7.676
8.897
12.278
-6.966
-6.569

-2.565
-2.150
Existing Ground Offsets(m)

0.000

1.200
1.526

7.772
7.876
Existing Ground Offsets(m)
-25.275

-18.73
19.886

27.61
Right of Way(m) Right of Way(m)

Chainage =106340.000 Chainage =106380.000


ROW

ROW

ROW

ROW
ROW

ROW

ROW

ROW
10
0.0
0
0%
ROW

ROW

ROW

ROW
%
00
0.0
10

-3.500% -2.446% 2.321% -1.705%

10
0.0
00
%
ROW

ROW

0%
0 .00

ROW

ROW
10
5.556% -0.500%
-5.556% -5.556%

Level Datum =117.000


Design Levels(m) Level Datum =121.000
-16.790 133.738

123.198

123.273

123.365

123.446

123.404

125.485

Design Levels(m)

-15.874 132.560

123.286

123.425

123.652

123.847

123.834

125.929
127.815 -6.251

-3.751

125.860 -0.000

126.222 3.500

6.000

8.081

Design Offsets(m)

-6.600

129.701 -4.100

127.081 0.000

3.500

6.000

125.859 8.095
Design Offsets(m)
-25.000 137.329

135.325
-18.891 135.215
135.073
-17.621 134.202

127.635

127.375

126.730

126.206
125.861
125.861

126.255

125.127

13.834 121.303
15.057 121.207

21.008 118.853

25.000 117.614

Existing Ground levels(m)

-25.000 138.789

-17.631 133.223
-16.977 132.933

-12.739 131.498
-12.392 131.336

130.501

129.691

128.415
128.281

127.084

126.829

125.918

25.000 121.130
Existing Ground levels(m)
-19.403
-19.126

-6.201

-4.366

-2.671

-1.076
0.000
1.062
2.325
2.419
3.663
4.163

9.904

Existing Ground Offsets(m)

-7.930

-3.584
-3.556

-1.120
-0.850
0.000

1.408

2.954

8.500
8.579
Existing Ground Offsets(m)
-25.978

19.022

Right of Way(m)

-22.893

22.875
Right of Way(m)
Chainage =106320.000
Chainage =106360.000

DRAWING TITLE:
AUTHORITY: AUTHORITY ENGINEER: PROOF CONSULTANT: SAFETY CONSULTANT: EPC CONTRACTOR: SUB CONTRACTOR: DESIGN CONSULTANT: CROSS SECTION
FROM CH.106/320 TO 106/380

R04 23.06.20 REVISED AS PER AUTHORITY ENGINEER'S COMMENTS OP & HS


DRAWN: DESIGN: CHECKED: APPROVED:
418,Saheed nagar
R03 06.05.20 Bhubaneswar, 751007 S. BISWAL S. BISWAL UK PANI
REVISED AS PER AUTHORITY ENGINEER'S COMMENTS
DATE: SCALE:
R02 10.04.20 REVISED AS PER PROOF CONSULTANTS COMMENTS
Construction of Two Lane Road on NH 23/06/2020 HORIZONTAL =100 VERTICAL =100
DESIGN AID Specification from Paletwa to
R01 23.03.20 REVISED AS PER DETAIL TOPO SURVEY Ministry of external Affairs Ircon infrastructure & Services Ltd. STUP Consultants Pvt. Ltd. Plot No. 54 (2nd Floor Front Side), Engineering Projects (India) RK-RPP (JV) India-Myanmar border (Zorinpui) from DRAWING NO: REV: SIZE:
Government of India C-4, District Centre, Saket, New Delhi 1112, Vishal Tower, District Centre, Masoodpur Dairy Farm. Km 0.000 to KM 109.200 in Chin State OP&HS/KMMP/CS/29
Limited R04 A3
REV. DATE DESCRIPTION New Delhi -110017 Janakpuri, New Delhi-110 058 Vasant Kunj, New Delhi-110070 Myanmar.
ROW

ROW
ROW

ROW

10
0.0
ROW

ROW
00
%
ROW

ROW
10

ROW

ROW
0.00
0%

ROW

ROW

%
00
0.0
10
%
00

ROW

ROW
0.0
10
ROW

ROW
4.923% -0.736%
-5.130% -4.923%
-3.500% -2.500% -2.500% -3.500%
Level Datum =122.000
Level Datum =121.000 Design Levels(m)

-14.064 142.566

134.604
122.491

122.566

122.654

122.566

122.491

16.501 132.992
Design Levels(m)
-10.439 133.599

129.852
122.979

123.107

123.306

123.478

123.460

10.689 128.148

-6.100
-6.000

136.814 -3.500

135.210 0.000

3.500

6.000
Design Offsets(m)
-6.632
-6.532

-4.032

131.613 -0.000

3.500

6.000
Design Offsets(m)

-25.000 148.427

-15.180 142.875

-12.773 142.208

-10.286 140.796

137.618

135.122
135.106

135.214
135.200

22.054 131.432

25.000 130.286
Existing Ground levels(m)
-25.000 136.851
-24.294 136.533

-19.602 135.924

-16.526 135.302

-13.477 134.156
-12.304 134.009

133.384

132.795

130.863

15.055 126.711
15.237 126.689
15.644 126.562

25.000 121.624
Existing Ground levels(m)

-4.925

-3.451

0.000

4.692
4.858

8.454
8.637
Existing Ground Offsets(m)
-9.462

-5.883

0.000

2.444
Existing Ground Offsets(m)

-14.064

31.741
Right of Way(m)
-10.439

34.62
Right of Way(m) Chainage =106460.000
Chainage =106420.000
ROW

ROW

ROW

ROW
ROW

ROW

ROW

ROW
ROW

ROW
10
0.0

ROW

ROW
00
10 %
0.0
0 0%
0%

%
ROW

ROW
0

00
0.0

0.0
ROW

ROW
10

10
5.556% -0.500%
-5.556% -5.556%
-3.500% -2.507% 0.478% -2.391%
Level Datum =122.000
Level Datum =122.000
Design Levels(m)
-13.753 133.775

126.737
123.158

123.297

123.525

123.720

123.707

127.553

Design Levels(m)

-10.833 134.231

129.645
122.826

122.901

122.990

123.007

122.947

11.873 128.820
-6.700
-6.600

-4.100

132.110 -0.000

3.500

6.000

9.846

Design Offsets(m)

-6.152
-6.052

-3.552

132.795 -0.000

3.500

6.000
Design Offsets(m)
-25.000 138.357

-22.416 137.256

-19.285 135.995
-18.313 135.675

-13.753 -14.069 133.888

132.256

131.746

131.148

132.392
132.107

128.360

24.501 123.017
25.000 122.884

-24.675 137.574
137.433

-21.810 137.036

-18.220 136.400
-17.048 136.181

-13.111 134.809
-12.154 134.509

133.429

133.232

134.268

12.765 128.285

17.444 126.638

25.000 122.876
Existing Ground levels(m)
Existing Ground levels(m)
-9.519

-7.792

-3.535

0.000
0.761
2.135

7.239

-25.000
Existing Ground Offsets(m)

-7.013

-4.699

0.000

2.781
Existing Ground Offsets(m)
32.158

-10.833

34.348
Right of Way(m)
Right of Way(m)
Chainage =106400.000
Chainage =106440.000

DRAWING TITLE:
AUTHORITY: AUTHORITY ENGINEER: PROOF CONSULTANT: SAFETY CONSULTANT: EPC CONTRACTOR: SUB CONTRACTOR: DESIGN CONSULTANT: CROSS SECTION
FROM CH.106/400 TO 106/460

R04 23.06.20 REVISED AS PER AUTHORITY ENGINEER'S COMMENTS OP & HS


DRAWN: DESIGN: CHECKED: APPROVED:
418,Saheed nagar
R03 06.05.20 Bhubaneswar, 751007 S. BISWAL S. BISWAL UK PANI
REVISED AS PER AUTHORITY ENGINEER'S COMMENTS
DATE: SCALE:
R02 10.04.20 REVISED AS PER PROOF CONSULTANTS COMMENTS
Construction of Two Lane Road on NH 23/06/2020 HORIZONTAL =100 VERTICAL =100
DESIGN AID Specification from Paletwa to
R01 23.03.20 REVISED AS PER DETAIL TOPO SURVEY Ministry of external Affairs Ircon infrastructure & Services Ltd. STUP Consultants Pvt. Ltd. Plot No. 54 (2nd Floor Front Side), Engineering Projects (India) RK-RPP (JV) India-Myanmar border (Zorinpui) from DRAWING NO: REV: SIZE:
Government of India C-4, District Centre, Saket, New Delhi 1112, Vishal Tower, District Centre, Masoodpur Dairy Farm. Km 0.000 to KM 109.200 in Chin State OP&HS/KMMP/CS/30
Limited R04 A3
REV. DATE DESCRIPTION New Delhi -110017 Janakpuri, New Delhi-110 058 Vasant Kunj, New Delhi-110070 Myanmar.
ROW

ROW

ROW

ROW
ROW

ROW
10
0.0
00

ROW

ROW
%
ROW

ROW
%
00
0.0
10

ROW

ROW
ROW

ROW

10
0.0
0
0%
-2.871% -0.509% -2.500% -3.500%

%
ROW

ROW
00
Level Datum =121.000

0.0
10
Design Levels(m)
-22.244 142.381

126.235
121.892

121.964

121.982

121.894

121.819

21.943 137.763
-0.906% 5.714% -5.714% -6.000%
Level Datum =120.000

-6.100
-6.000

138.982 -3.500

138.174 0.000

3.500

6.000
Design Offsets(m) Design Levels(m)

-14.281 129.768

121.487

121.510

121.310

121.068

120.918

11.671 125.854
-25.000 141.290
-24.110 141.159
142.070
-23.009 142.382

-13.601 142.375
-12.488 142.234
-11.478 142.102

138.836
138.198

138.261

136.816
136.693

10.824 136.758
11.459 137.198

15.086 138.282

18.422 138.334

25.000 137.287
137.250
Existing Ground levels(m)

-6.000

-3.500

125.592 -0.000

125.329 4.235

6.735
Design Offsets(m)
-24.434

24.871
-3.820
-3.241
-2.201

0.000
0.601

4.499
4.830
Existing Ground Offsets(m)

-25.000 135.244
-24.052 131.054
-22.758 130.551

-20.923 130.786

-18.158 130.384

128.613

127.820

126.450

125.613

124.793

10.313 125.754

14.819 126.085

17.676 125.852

20.207 126.063

22.869 124.397
23.992 123.895
25.000 123.754
Existing Ground levels(m)
-22.244

23.637
Right of Way(m)

-7.010

-5.123

-1.714

0.000
0.595

4.303
5.328
Existing Ground Offsets(m)
Chainage =106500.000

-27.642

17.6
Right of Way(m)

Chainage =106540.000
ROW
ROW

ROW

ROW
ROW
10
0.0
00
%
ROW

ROW

ROW
ROW
ROW

ROW

ROW
ROW
%
00

10
0.0

0 .00
10

0%

%
00
0.0
10
ROW

ROW

ROW
ROW
-1.889% 2.603% -2.603% -3.580%
-2.500% -2.500% -3.500% Level Datum =121.000
Level Datum =122.000 -3.500%

Design Levels(m) Design Levels(m)

-22.845 138.535

121.690

121.737

121.646

121.546

121.456

16.742 131.864
-18.189 148.123

136.034
122.155

122.230

122.318

122.230

122.155

22.809 138.964

-6.000

-3.500

131.136 -0.000
-6.100
-6.000

145.286 -3.500

3.835

6.335
144.744 0.000

3.500

143.462 6.000

Design Offsets(m) Design Offsets(m)

-25.000 139.446

-12.319 134.084

133.091

131.865
131.539

131.121

130.089

130.338

12.708 130.763

15.452 132.128

20.886 131.018

25.000 131.727
-25.000 149.480
-24.760 149.510
-23.302 148.775

-14.421 147.642

147.030

145.881

145.784
145.786

143.303
143.298

142.428
12.075 142.397
142.368

18.890 140.684
19.284 140.573
19.617 140.463

23.652 138.568
25.000 138.523

Existing Ground levels(m) Existing Ground levels(m)


11.678
11.926

-9.236

-5.138
-4.280
-9.381

-4.743
-3.677
-3.054
-3.050

0.000
1.027

5.234

9.046
5.151
5.188
6.161
0.000

Existing Ground Offsets(m) Existing Ground Offsets(m)


-18.189

20.038
27.764

-25.49
Right of Way(m) Right of Way(m)

Chainage =106480.000 Chainage =106520.000

DRAWING TITLE:
AUTHORITY: AUTHORITY ENGINEER: PROOF CONSULTANT: SAFETY CONSULTANT: EPC CONTRACTOR: SUB CONTRACTOR: DESIGN CONSULTANT: CROSS SECTION
FROM CH.106/480 TO 106/540

R04 23.06.20 REVISED AS PER AUTHORITY ENGINEER'S COMMENTS OP & HS


DRAWN: DESIGN: CHECKED: APPROVED:
418,Saheed nagar
R03 06.05.20 Bhubaneswar, 751007 S. BISWAL S. BISWAL UK PANI
REVISED AS PER AUTHORITY ENGINEER'S COMMENTS
DATE: SCALE:
R02 10.04.20 REVISED AS PER PROOF CONSULTANTS COMMENTS
Construction of Two Lane Road on NH 23/06/2020 HORIZONTAL =100 VERTICAL =100
DESIGN AID Specification from Paletwa to
R01 23.03.20 REVISED AS PER DETAIL TOPO SURVEY Ministry of external Affairs Ircon infrastructure & Services Ltd. STUP Consultants Pvt. Ltd. Plot No. 54 (2nd Floor Front Side), Engineering Projects (India) RK-RPP (JV) India-Myanmar border (Zorinpui) from DRAWING NO: REV: SIZE:
Government of India C-4, District Centre, Saket, New Delhi 1112, Vishal Tower, District Centre, Masoodpur Dairy Farm. Km 0.000 to KM 109.200 in Chin State OP&HS/KMMP/CS/31
Limited R04 A3
REV. DATE DESCRIPTION New Delhi -110017 Janakpuri, New Delhi-110 058 Vasant Kunj, New Delhi-110070 Myanmar.
ROW

ROW

ROW

ROW
ROW

ROW

ROW

ROW
-1.370% 4.244% -4.244% -4.857%
-3.335% -1.978% -2.500% -3.500%
.0 00% .00
0%
-50
ROW

ROW

ROW

ROW
-50
-50
.00
0%
-50
.00
0%
ROW

ROW

ROW

ROW
Level Datum =109.000 Level Datum =109.000
Design Levels(m) Design Levels(m)
-13.385 117.059

120.752

120.786

120.638

120.466

120.345

16.582 115.378
114.280

117.853

119.813

119.896

119.966

119.878

119.803

18.684 113.511
110.890
16.480

18.584
-6.000

-3.500

109.982 -0.000

-9.920

-6.000

-3.500
111.091 4.046

6.546

116.813 0.000

3.500

6.000
Design Offsets(m) Design Offsets(m)
-25.000 117.534

-15.667 116.705

-11.992 117.276

116.912

110.008

110.936

112.231

11.296 114.041

14.178 114.693

17.473 114.138

25.000 114.554

-25.000 121.437

-16.988 119.536

-13.169 118.627

117.611

117.323

116.725
116.712

115.648

114.303
114.107

10.422 113.702
11.495 113.255

13.692 112.436
14.266 112.175

109.842
109.744
109.676
109.038
109.008
Existing Ground levels(m) Existing Ground levels(m)

23.720
24.080
24.302
24.938
25.000
-8.605

-8.906

-1.186
0.000

2.451

4.362
5.586

9.760

0.000
0.790
1.103

4.193

7.956
9.003
Existing Ground Offsets(m) Existing Ground Offsets(m)
-28.419

16.582

18.684
-26.41
Right of Way(m) Right of Way(m)

Chainage =106580.000 Chainage =106620.000

ROW

ROW
ROW

ROW
-2.353% 1.133% -2.497% -3.500%

.0 00%
-50
-50
.00
0%

ROW

ROW
ROW

ROW

0%
.00 -0.500% 7.000%
-50 -7.000% -7.000%

ROW

ROW
ROW

ROW

-50
.00
0%

Level Datum =106.000


Level Datum =116.000 Design Levels(m)

-14.073 116.246

120.282

120.341

120.302

120.211

120.136

17.434 114.547
108.448
Design Levels(m)
120.787
121.206

121.219

120.974

120.666

120.491

118.954

17.324
-6.000

-3.500

113.484 -0.000

3.646

6.146
Design Offsets(m)
-6.839
-6.000

-3.500

119.511 -0.000

4.400

6.900

9.973

Design Offsets(m)

-25.000 118.379

-20.802 117.656

-15.604 116.410

115.749

116.161

115.450

114.780

113.485
113.347

112.522
112.365

112.419
112.313

12.280 110.018
12.588 109.955
13.750 109.540

20.979 107.397
21.364 107.349
21.703 107.269

25.000 106.335
-25.000 130.243
-23.748 130.054

-11.089 121.517

119.532
119.531
119.487

20.137 118.347
21.078 118.217
21.579 118.245

25.000 116.975

Existing Ground levels(m)


Existing Ground levels(m)

-9.437

-7.177

-4.240

-2.290

0.000
0.566
1.086

4.041
5.090

8.356
8.760
Existing Ground Offsets(m)
0.000
0.468
0.526
1.056

Existing Ground Offsets(m)

-27.621

17.434
-28.559

16.508

Right of Way(m)
Right of Way(m)
Chainage =106600.000
Chainage =106560.000

DRAWING TITLE:
AUTHORITY: AUTHORITY ENGINEER: PROOF CONSULTANT: SAFETY CONSULTANT: EPC CONTRACTOR: SUB CONTRACTOR: DESIGN CONSULTANT: CROSS SECTION
FROM CH.106/560 TO 106/620

R04 23.06.20 REVISED AS PER AUTHORITY ENGINEER'S COMMENTS OP & HS


DRAWN: DESIGN: CHECKED: APPROVED:
418,Saheed nagar
R03 06.05.20 Bhubaneswar, 751007 S. BISWAL S. BISWAL UK PANI
REVISED AS PER AUTHORITY ENGINEER'S COMMENTS
DATE: SCALE:
R02 10.04.20 REVISED AS PER PROOF CONSULTANTS COMMENTS
Construction of Two Lane Road on NH 23/06/2020 HORIZONTAL =100 VERTICAL =100
DESIGN AID Specification from Paletwa to
R01 23.03.20 REVISED AS PER DETAIL TOPO SURVEY Ministry of external Affairs Ircon infrastructure & Services Ltd. STUP Consultants Pvt. Ltd. Plot No. 54 (2nd Floor Front Side), Engineering Projects (India) RK-RPP (JV) India-Myanmar border (Zorinpui) from DRAWING NO: REV: SIZE:
Government of India C-4, District Centre, Saket, New Delhi 1112, Vishal Tower, District Centre, Masoodpur Dairy Farm. Km 0.000 to KM 109.200 in Chin State OP&HS/KMMP/CS/32
Limited R04 A3
REV. DATE DESCRIPTION New Delhi -110017 Janakpuri, New Delhi-110 058 Vasant Kunj, New Delhi-110070 Myanmar.
ROW

ROW

10
0.0
00
94

%
.9

ROW

ROW
19
%

ROW

ROW
ROW

ROW

ROW

ROW
ROW

ROW
%
00
0.0

ROW

ROW
10

ROW

ROW
%
00

ROW

ROW
0.0
10
ROW

ROW
5.607% -0.809%
-5.837% -5.607%

Level Datum =97.000


6.536% -0.500%
-6.536% -6.536% Design Levels(m)

-11.819 127.760

122.555

22.684 115.136
97.905

98.051

98.276

98.472

98.452
Level Datum =96.000
125.538

123.545

14.252 105.740
Design Levels(m)
96.841

97.004

97.272

97.501

97.488

-6.615
-6.515

-4.015

121.287 -0.000

3.500

6.000
Design Offsets(m)
-8.799

-6.700
-6.600

-4.100

119.078 0.000

3.500

6.000

-25.000 118.043

-14.520 129.062
-14.079 128.992
-14.008 128.983

123.075
123.060

121.414
121.192

122.658

122.144

122.037

10.565 122.088

13.007 121.548

16.235 119.988

20.721 118.734

25.000 110.891
Design Offsets(m)
Existing Ground levels(m)
-21.104 134.548

13.391 106.317

16.332 104.346

99.474

98.316
Existing Ground levels(m)

-3.434
-3.239

-0.351
0.000
0.340

4.794

6.401

8.338
Existing Ground Offsets(m)

21.109

25.000
0.000

-11.819
Existing Ground Offsets(m)

33.263
Right of Way(m)

36.287
-8.799

Chainage =108540.000
Right of Way(m)
Chainage =108500.000

ROW
10
0.0
00
%
ROW

ROW
ROW
ROW

ROW
96
.96
9%

ROW
ROW
ROW

ROW

ROW
ROW
ROW

ROW

%
00
0.0
10
%
00
0.0
10

ROW
ROW
ROW

ROW

6.536% -0.500%
-6.536% -6.536%
6.536% -0.500% Level Datum =97.000
-6.536% -6.536%
Level Datum =96.000 Design Levels(m)

-10.219 128.323

124.804

19.250 110.969 19.090 111.080


97.343

97.506

97.774

98.003

97.990
Design Levels(m)
117.607
116.407

15.138 106.124
96.339

96.502

96.770

96.999

96.986

-6.700
-6.600

121.812 -4.100

117.634 0.000

3.500

6.000
Design Offsets(m)
-7.938
-6.700
115.781 -6.600

-4.100

109.098 -0.000

3.500

6.000

Design Offsets(m)

-12.430 130.636

12.637 115.804
14.047 114.569

19.962 110.400
20.910 109.981

107.187
107.176
107.054
107.031
Existing Ground levels(m)
-20.842 129.585

107.167
106.665
10.059 106.734
10.288 106.618

12.486 106.576

16.404 105.908
16.998 105.608
17.179 105.502

25.000 100.676

Existing Ground levels(m)

24.323
24.344
24.867
25.000
-3.995

0.000
Existing Ground Offsets(m)
-5.970

0.000

7.911
8.662

Existing Ground Offsets(m)

-10.219

34.917
Right of Way(m)
-7.938

37.11

Right of Way(m)

Chainage =108520.000
Chainage =108480.000
DRAWING TITLE:
AUTHORITY: AUTHORITY ENGINEER: PROOF CONSULTANT: SAFETY CONSULTANT: EPC CONTRACTOR: SUB CONTRACTOR: DESIGN CONSULTANT: CROSS SECTION
FROM CH.108/480 TO 108/540

R04 23.06.20 REVISED AS PER AUTHORITY ENGINEER'S COMMENTS OP & HS


DRAWN: DESIGN: CHECKED: APPROVED:
418,Saheed nagar
R03 06.05.20 Bhubaneswar, 751007 S. BISWAL S. BISWAL UK PANI
REVISED AS PER AUTHORITY ENGINEER'S COMMENTS

DATE: SCALE:
R02 10.04.20 REVISED AS PER PROOF CONSULTANTS COMMENTS
Construction of Two Lane Road on NH 23/06/2020 HORIZONTAL =100 VERTICAL =100
R01 23.03.20
DESIGN AID Specification from Paletwa to
REVISED AS PER DETAIL TOPO SURVEY Ircon infrastructure & Services Ltd.
Ministry of external Affairs STUP Consultants Pvt. Ltd. Plot No. 54 (2nd Floor Front Side), RK-RPP (JV) India-Myanmar border (Zorinpui) from DRAWING NO: REV: SIZE:
Engineering Projects (India)
Government of India C-4, District Centre, Saket, New Delhi 1112, Vishal Tower, District Centre, Masoodpur Dairy Farm. Km 0.000 to KM 109.200 in Chin State OP&HS/KMMP/CS/55
REV. DATE DESCRIPTION Limited R04 A3
New Delhi -110017 Janakpuri, New Delhi-110 058 Vasant Kunj, New Delhi-110070 Myanmar.
ROW

ROW

ROW

ROW
ROW

ROW

ROW

ROW
-3.500% -2.500% -2.500% -3.500%

.0 00%
-50

ROW

ROW

ROW

ROW
10
0.0
00 -3.500% -2.500% -2.500% -3.500%
-50 %
.00
0%

-50
.000%

ROW

ROW

ROW

ROW
Level Datum =87.000 Level Datum =91.000
Design Levels(m)

-12.764 91.630
95.624

99.117

99.192

99.279

99.192

99.117

90.681
Design Levels(m)

101.087
99.746

99.821

99.908

99.821

99.746

93.454
-12.864

22.872
-6.000

-3.500

-0.000

3.500

6.000

18.583
-7.341
-6.000

-3.500

-0.000
Design Offsets(m)

3.500

6.000
Design Offsets(m)
-25.000 101.886

91.071
-21.805 97.182
-21.397 97.046

-14.071 91.617

91.615

91.154

90.127

89.117

87.660
87.585
87.527

91.824

-17.235 104.331

-13.190 102.686

101.272

100.362
100.324

95.921
95.846

91.727
97.476
Existing Ground levels(m) Existing Ground levels(m)

15.740
16.019
16.998

25.000
-9.112

-2.868

0.000

3.870

9.440

25.000
-7.996

-4.776
-4.697
Existing Ground Offsets(m)

0.000

9.459
9.701
Existing Ground Offsets(m)
-12.864

32.141

-13.438

31.566
Right of Way(m) Right of Way(m)

Chainage =108580.000 Chainage =108620.000


ROW

ROW

ROW

ROW
ROW

ROW

ROW

ROW
-3.500% -2.500% -2.500% -3.500%

0%
.00
-50
ROW

ROW
-50
.000%

ROW

ROW
10
0.0

%
00

00
%
ROW

ROW
0.0
10

ROW

ROW
-3.500% -2.504% 1.249% -2.255%
Level Datum =98.000
Design Levels(m)
-12.571 106.290

12.055 104.820
99.934
98.612

98.687

98.778

98.822

98.765

Level Datum =85.000


Design Levels(m)

-13.151 95.087
95.943

99.519

99.594

99.681

99.594

99.519
-6.215
-6.115

-3.615

107.427 -0.000

3.500

106.224 6.000

Design Offsets(m)

-6.000

-3.500

-0.000

3.500

6.000
-25.000 106.425

-18.154 113.360

-14.974 107.008

-10.683 105.725

106.290

105.672

9.899 105.121
10.231 104.993

104.400
104.377
104.300
103.824

25.000 100.513

Design Offsets(m)
Existing Ground levels(m)

-25.000 99.048

-12.765 94.958
-12.550 94.881

92.164
92.119

89.480
89.447

87.655

85.926

85.345
90.555
Existing Ground levels(m)
16.485
16.933
17.172
17.423
-3.092

0.000

2.658

5.888

Existing Ground Offsets(m)

16.660

25.000
-4.470
-4.393

0.000

3.286
3.495

9.791
Existing Ground Offsets(m)
-12.571

32.436

Right of Way(m)

-13.151

31.853
Right of Way(m)
Chainage =108560.000

Chainage =108600.000

DRAWING TITLE:
AUTHORITY: AUTHORITY ENGINEER: PROOF CONSULTANT: SAFETY CONSULTANT: EPC CONTRACTOR: SUB CONTRACTOR: DESIGN CONSULTANT: CROSS SECTION
FROM CH.108/560 TO 108/620

R04 23.06.20 REVISED AS PER AUTHORITY ENGINEER'S COMMENTS OP & HS


DRAWN: DESIGN: CHECKED: APPROVED:
418,Saheed nagar
R03 06.05.20 Bhubaneswar, 751007 S. BISWAL S. BISWAL UK PANI
REVISED AS PER AUTHORITY ENGINEER'S COMMENTS
DATE: SCALE:
R02 10.04.20 REVISED AS PER PROOF CONSULTANTS COMMENTS
Construction of Two Lane Road on NH 23/06/2020 HORIZONTAL =100 VERTICAL =100
DESIGN AID Specification from Paletwa to
R01 23.03.20 REVISED AS PER DETAIL TOPO SURVEY Ministry of external Affairs Ircon infrastructure & Services Ltd. STUP Consultants Pvt. Ltd. Plot No. 54 (2nd Floor Front Side), Engineering Projects (India) RK-RPP (JV) India-Myanmar border (Zorinpui) from DRAWING NO: REV: SIZE:
Government of India C-4, District Centre, Saket, New Delhi 1112, Vishal Tower, District Centre, Masoodpur Dairy Farm. Km 0.000 to KM 109.200 in Chin State OP&HS/KMMP/CS/56
REV. DATE DESCRIPTION Limited R04 A3
New Delhi -110017 Janakpuri, New Delhi-110 058 Vasant Kunj, New Delhi-110070 Myanmar.
ROW
ROW

ROW

99
.99
9%
ROW

ROW
10
0.0
0%0
ROW

ROW

ROW

ROW
ROW

ROW
%
00
0.0
10
%
-3.500% -2.500% -2.500% -3.500% 00
0.0

ROW
10

ROW
-3.500% -2.500% -2.500% -3.500%

ROW

ROW

ROW

ROW
Level Datum =93.000
Design Levels(m)
-14.013 114.046

106.133

102.481
99.678

99.753

99.840

99.753

99.678
Level Datum =91.000

-6.100
110.409 -6.000

108.985 -3.500

106.994 -0.000

3.500

6.000

8.803
Design Offsets(m) Design Levels(m)

-14.588 120.271

111.783

10.513 103.425
98.912

98.987

99.074

98.987

98.912
Existing Ground levels(m)
-25.000 115.841

113.257
113.146
113.132
112.687

106.463

103.781

103.202

101.085
100.933
100.439
100.323

94.157

93.483

-6.100
-6.000

-3.500

111.100 -0.000

108.369 3.500

6.000
Existing Ground Offsets(m) Design Offsets(m)

12.034
12.320
13.107
13.807

23.359

25.000
-9.185
-8.306
-8.277
-7.841

-5.575

-3.551

0.000
0.908

5.553

7.132

-25.000 123.957

-18.081 119.921

-10.961 120.635

115.930
114.827

112.549

105.570

104.467

12.189 102.680

98.003

91.931
Existing Ground levels(m)
-14.013

Right of Way(m)

30.991

18.466

25.000
-4.016
-2.993

-0.972
0.000

3.561

6.703

8.169
Existing Ground Offsets(m)
Chainage =108660.000

30.417
-14.588
Right of Way(m)

Chainage =108700.000

ROW

10
0.0
01
%
ROW
ROW

ROW

ROW
ROW
ROW

ROW

ROW
10
0.0
00
%

ROW
ROW

ROW

ROW
0%
%
00

0
0.0
-3.500% -2.500% -2.500% -3.500% 0.0
10

10
-3.500% -2.500% -2.500% -3.500%

ROW
ROW

ROW

ROW
Level Datum =92.000 Level Datum =93.000
Design Levels(m) Design Levels(m)
-13.726 111.181

103.555

-14.301 126.848

118.647

103.181
99.799

99.874

99.961

99.874

99.799
99.948

99.382

99.457

99.544

99.457

99.382
107.202 -6.100
-6.000

105.637 -3.500

101.245 -0.000

3.500

6.000
6.149

-6.100
-6.000

-3.500

111.813 -0.000

109.547 3.500

107.606 6.000

9.799
Design Offsets(m) Design Offsets(m)
-25.000 116.012

-17.947 112.737
112.675

-11.056 110.236

108.716

107.212

105.626

-16.399 129.067

121.349

109.014

106.179
105.258
99.678
99.594

98.329
97.829

92.688

97.488
97.290

96.873

94.089

93.613
Existing Ground levels(m) Existing Ground levels(m)
-18.097

11.706
12.482

25.000
-8.913

-6.815
-6.804

-3.553
-3.536

13.874
14.277

17.694

22.126

25.000
0.000

7.398
7.628

-9.102

0.000

3.310
4.331

5.944
7.233
8.313
Existing Ground Offsets(m) Existing Ground Offsets(m)
-13.726

-14.301
31.278

30.704
Right of Way(m) Right of Way(m)
Chainage =108640.000
Chainage =108680.000

DRAWING TITLE:
AUTHORITY: AUTHORITY ENGINEER: PROOF CONSULTANT: SAFETY CONSULTANT: EPC CONTRACTOR: SUB CONTRACTOR: DESIGN CONSULTANT: CROSS SECTION
FROM CH.108/640 TO 108/700
R04 23.06.20 REVISED AS PER AUTHORITY ENGINEER'S COMMENTS OP & HS
DRAWN: DESIGN: CHECKED: APPROVED:
418,Saheed nagar
R03 06.05.20 REVISED AS PER AUTHORITY ENGINEER'S COMMENTS Bhubaneswar, 751007 S. BISWAL S. BISWAL UK PANI

DATE: SCALE:
R02 10.04.20 REVISED AS PER PROOF CONSULTANTS COMMENTS
Construction of Two Lane Road on NH 23/06/2020 HORIZONTAL =100 VERTICAL =100
R01 23.03.20
DESIGN AID Specification from Paletwa to
REVISED AS PER DETAIL TOPO SURVEY Ircon infrastructure & Services Ltd.
Ministry of external Affairs STUP Consultants Pvt. Ltd. Plot No. 54 (2nd Floor Front Side), RK-RPP (JV) India-Myanmar border (Zorinpui) from DRAWING NO: REV: SIZE:
Engineering Projects (India)
Government of India C-4, District Centre, Saket, New Delhi 1112, Vishal Tower, District Centre, Masoodpur Dairy Farm. Km 0.000 to KM 109.200 in Chin State OP&HS/KMMP/CS/57
REV. DATE DESCRIPTION Limited R04 A3
New Delhi -110017 Janakpuri, New Delhi-110 058 Vasant Kunj, New Delhi-110070 Myanmar.

You might also like