Department JSA No.

Civil Department 006


JSA Title
Existing Building (Demolition) Revision

Minimum PPE “Safety Helmet, Safety Shoes, Safety Glass (dark & clear
Personal Protective Equipment
glasses), Long sleeves shirt” , Ready to use working gloves, Full body
Required
safety harness double lanyard, dust mask(respiratory protection) and ear
plug.
TASNEE PROJECT
JOB SAFETY ANALYSIS Check One Revised JSA X Review Date
Revision #:
New JSA
BASIC JOB STEPS POTENTIAL HAZARDS RECOMMENDATIONS
1. Pre-Commencement Activities (Method Statement, 1.1Unsafe act and unsafe conditions due to failure 1.1.1 Fully planned with written step-by-step work activities
J.S.A. and STARRT Form) to implement the JSA & STARRT Card to include all safety requirements
1.1.2 Toolbox talks using the STARRT form and JSA
1.1.3 Restricted area (Barricade)
1.1.4 All required drawing (TEAL Building) must be pre-
arranged.

2. Disconnection of electrical, telephone connections 2.1 Electrocution, electrical shock, human reaction 2.1.1 Competent electrical engineer must be appointed to
(system) and all existing utility lines (water line, to TEAL and waste water from existing plant. lead the disconnection works.
drainage). 2.1.2 Electrical drawings for the building must be secured
& consultant with Tecnimont Representatives to be
initiated prior to disconnection. If necessary drainage
system to be flushed and plugged
2.1.3 Work permit must be raised prior to start of activity.
2.1.4 Procedure of lock out /tag out system will be used if
necessary
2.1.5 Visual inspection /check & ensure that all electrical
switches are in off position & isolated.

3. Erection of scaffold prior to removal of all over 3.1 Fall accident (personnel & material), 3.1.1 Pre inspection of the ladder and inspection of the
head existing lights, cable tray and cables. respiratory problems, skin, eyes, nose, & scaffold prior to use
throat irritation 3.1.2 Suitable Ladder will be provide (Inspected displaying
the current quarterly colour code and approved ladders)
Scaffolding will be used as the safe means of access
3.1.3 PPE will worninspected and approved full body
safety harness with double lanyard and shock absorber
(displaying the current quarterly colour code), leather
gloves for handling electrical wires / removing utility
connection & respiration mask (dust mask) as protection
from respiratory hazards.

General Instruction:
All electrical cables / wires must be treated as live by all
electrical personnel doing disconnection works.

4. Use of Man Basket for removal of side cladding for 4.1 Hazard to fall, Defective equipment, 4.1.1 Crane daily inspection shall be carried out by the
installation of life line Environmental and health hazard due to spill of operator
diesel, oil, fluids.
4.1.2 Any spills shall be reported
4.1.3 Crane to be set up on firm, stable ground, outriggers
extended and mats placed under the the outrigger feet

4.2 Defective man basket resulting in an accident General Instruction:


Defective Mobile cranes should not be in use

4.2. Certification (Third Party inspection) of Man basket will


be forwarded to Tecnimont HES Manager l.
4.2.2 Allowable weight / SWL of man basket is applicable
to load
4.2 3 All material, tools are to be secure.
4.2.4 Use two (2) tag lines to hold the stability of man
basket
4.2.5 Cold Work Permit to be raised before commencing
activities

General Instruction:
No third party inspection do not use.

5. Erection of scaffolding prior to Installation of Life 5.1 Fall accident (personnel & material) 5.1.1 Provide good access and egress by erection of
lines scaffolding
5.1.2 Scaffold must be inspected and approved.
5.1.3 Provide life lines (19 mm diameter) (green
tag/approval inspection), correctly installed
5.1.4 All materials and tools to be use at heights shall be
secured
5.1.5 Provide Full Body Safety Harness with double
lanyards and shock absorber (quarterly colour
coded/inspected)

General Instruction:
- Red tag scaffolddshall not be used
- Red tag life linedt shall not be used
6. Removal of cladding/ corrugated sheet and lay 6.1 Fall hazard Defective equipment, 6.1.1 Extra precaution in the correct handling of corrugated
down with crane Environmental and health hazard due to spill of sheets.
diesel, oil, or fluids. 6.1.2 Crane daily inspection shall be carried out by the
operator
6.1.3 Crane daily inspection shall be carried out by the
operator
6.1.4 Any spills shall be reported
6.1.5 Ensure 100% tie off

6.1.6 Rigger must be visible at all times


6.17 Communications between the crane operator and the
rigger
6.1.7 Use tag lines when handling the material

General Instruction:
Defective Mobile cranes should not be in use

7. Removal of roof beam/ structure use of oxy-acetylene 7.1 Fall Hazard , Defective equipment, 6.1.1 use of oxy-acetylene cutting equipment (flash back
*use man basket Environmental and health hazard due to spill of arrestors installed) allflammable material or equipment in
diesel, oil or fluids. the vicinity of the building to be removed prior to
*additional crane to hold the roof beam/ structure commencing any cutting activity
6.1.2 All beams/columns will be removed individually.
6.1.3 Any spills shall be reported
6.1.4 Rigger must be visible at all times, communication to
between the crane operator and rigger to be maintained, ,
use of an additional rigger if two (2) cranes are used.
6.1.5 Beams to be slung up and attached to the second
crane prior to the removal of bolts/nuts from the beams
6.1.6 Use tag line to handle the material and man basket
6.1.7 Check wind speed is acceptable for lifting conditions,
if wind speed increases, lifting operations shall be
suspended
6.1.8 Position the crane in order not to strike adjacent
buildings / equipment
6.1.9Safe working load of the crane to be observed at all
times
6.1.10 Use of colour coded & inspected lifting equipment
6.1.11 Work area to be barricaded and warning signs
“DANGER” Overhead work in progress installed

General Instruction:
Defective Mobile cranes should not be in use

8. Back hoe converted to Hydraulic hammer 8.1 Hand injury due to installation of hydraulic 8.1.1 Use of Working Gloves
8.1.2 Only trained / experienced person will do the job
8.2 Personal injuries due to usage of unfit 8.2.1 Re-inspection of backhoe and mounted hammer
equipment. 8.2.2 Operator Check-list for day-to-day work is necessary.

8.2.3 Unauthorized person is not allowed at the perimeter


work area. Barricade to be installed and watchman
positioned to prevent unauthorized personnel from
entering the area

8.3 Equipment may have a harmful effect on 8.3.1. All equipment shall be inspected prior to entrance to
environment. site by the company and TAL HSE Dept

8.4 Personal injury due to not being aware of the 8.4.1 TBT and STARRT to be conducted prior to
activities. commencing work
8.4.2. JSA’s Shall be discussed during the daily TBT
(STARRT)

9. Use of Back hoe equipped with Hydraulic hammer9.1 Crushing injuries due to falling objects and 9.1.1 Only qualified operator is allowed to operate
solid metals, respiratory problems equipment.
9.1.2 Dust control by spraying water at the location.
9.1.3 Use of required PPE’ and respiratory mask is
mandatory
9.1.4 Restricted access to the area (barricade and
signboards)
9.1.5 Banks-men or spotter is required for the area.
10. Cutting of Side Walls 10.1. Collapse of side walls 10.1.1 All personnel to be clear of the area while
demolishion of the walls are in progress
10.1.2 Barricades and warning signs to be erected to
keep all unauthorized personnel out of the area
10.1.3 Designated spotter, banks-man for the area is
necessary

11. Mobilize tools and equipment to worksite 11.1 Traffic and pedestrians 11.1.1. Audible reversing alarms shall be installed on
equipment/vehicles
11.1.2.
11.1.3. All traffic rules and signs should be followed (on site
speed limit is 25-km/h)
11.1.4. Only approved routes shall be used for access to
and egress from the site
11.1.5. The drivers shall be made aware of the approved
routes
11.1.6. Trained banks-men with high-visibility vests shall
accompany the work activities
11.2 Overturning of vehicle / Crash injuries 11.2.1. All drivers shall have valid driving licenses, all
operators shall have 3rd party certifications
11.2.2. The areas where heavy equipment are working
shall be clearly marked on site
11.2.3. Safe access shall be maintained at site for vehicles
and equipment
11.2.4. Use of seatbelts shall be mandatory at all times

12. Loading, transportation(use of Loader and Truck) 12.1. Material falling from trucks 12.1.1. All materials on the trucks should be effectively
secured during transportation
12.1.2. Operators and Supervisor shall ensure that the
vehicle is not overloaded
12.1.3. All trucks shall be equipped with covering canvas
with ropes for easy (un)covering
12.1.4 All demolished materials will be transported to
designated areas as per Local Authority requirements .

12.2. Speeding 12.2.1. Operators shall be made aware of traffic rules and
regulations; penalty system shall be implemented if
required

12.3. Operator struck by the bucket (loader) 12.3.1. Truck driver shall leave his vehicle and stand at a
safe distance during loading

13. Housekeeping 13.1 Falling Objects, tripping hazards, skin 13.1.1 Use mobile crane to lift heavy objects
irritation, environmental hazard, hand injuries, 13.1.2 Complete PPE’ will be supplied and strictly enforced
back injury during lifting of heavy objects especially heavy duty Hand gloves, respiratory mask. (dust
mask)
13.1.3 Safety watcher will be assigned to oversee
housekeeping
13.1.4 Open excavation due to removal of foundation will
be secured with physical barricades
13.1.5 Ladder /staiway will be provided for all open
excavated areas.
14. Demobilization 14.1. Work completion 14.1.1. Workforce shall be alerted about the work
completion
14.2. Clutter/Rubbish 14.2.1. Good housekeeping practice shall be implemented
throughout the day

Prepared by: Date: 1. John Levy Jueves


V.G.A.Guinza 31/7/2006 2. Halit Ilgar
Employees
Approved by: Date: participating in 3. Pius George
Kaan Alkan 31/7/2006 the 4.
Reviewed by: Date: 5.
development of
Hazan Yilmaz 31/7/2006 JSA