GUIDE FOR
Copyright 2007
American Bureau of Shipping
ABS Plaza
16855 Northchase Drive
Houston, TX 77060 USA
Updates
Foreword
This Guide contains requirements obtained from IACS Unified Requirement, UR Z23 “Hull Survey for
New Construction”. For the convenience of the users, the various cross-references to the relevant ABS
Rules and Guides are provided in addition to those for IACS documents. These IACS documents, UR, UI
(Unified Interpretation) and Recommendation, are available from www.iacs.org.uk.
(1 July 2010) The July 2010 update to this Guide incorporates the latest requirements of IACS UI SC234,
UI LL76, and UI MPC96, regarding initial statutory surveys at new construction. Updates to IACS UR Z23
are also incorporated.
The effective date of this Guide is 1 January 2008 and it is applicable for vessels contracted for construction
on or after 1 January 2008.
ABS GUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION . 2007 iii
Table of Contents
GUIDE FOR
CONTENTS
1 Scope ................................................................................................................... 1
2 Definitions ........................................................................................................... 1
2.1 Hull Structure ...................................................................................................1
2.2 Documents ....................................................................................................... 1
2.3 Survey Methods ............................................................................................... 1
3 Applications ........................................................................................................ 2
3.1 Vessel Types....................................................................................................2
3.2 Statutory Items .................................................................................................2
3.3 Equipment, Fittings and Appendages .............................................................. 2
3.4 Installation and Testing .................................................................................... 2
3.5 Locations of Construction ................................................................................ 2
4 Qualification and Monitoring of Personnel ...................................................... 2
5 Survey of the Hull Structure .............................................................................. 3
5.1 Items to be Surveyed ....................................................................................... 3
5.2 Evidence of Survey of Materials and Equipment ............................................. 3
6 Review of the Construction Facility .................................................................. 3
7 Newbuilding Survey Planning ........................................................................... 4
7.1 Kick-off Meeting ............................................................................................... 4
7.2 Administration and Statutory Requirements .................................................... 4
7.3 Update of Meeting Record ............................................................................... 4
7.4 Shipbuilding Quality Standards ........................................................................ 4
7.5 Attendance by Other Parties ............................................................................ 4
7.6 Series Ship Production .................................................................................... 4
8 Examination and Test Plan for Newbuilding Activities ................................... 4
9 Proof of the Consistency of Surveys ................................................................ 5
9.1 Compliance with Newbuilding Survey Planning............................................... 5
9.2 Audit ................................................................................................................. 5
10 Ship Construction File ....................................................................................... 5
10.1 Responsibility ...................................................................................................5
10.2 Documents to be Included ............................................................................... 5
TABLE 1 ........................................................................................................................ 6
APPENDIX 1 Survey Tables for Initial Statutory Surveys at New Construction ... 25
1 Description ........................................................................................ 25
1 Scope
The scope of this Guide includes the following:
i) Examination of the parts of the vessel covered by the Rules and by applicable statutory regulations
for hull construction, to obtain appropriate evidence that they have been built in compliance with
the Rules and regulations, taking account of the relevant approved drawings.
ii) Appraisal of the manufacturing, construction, control and qualification procedures, including welding
consumables, weld procedures, weld connections and assemblies, with indication of relevant approval
tests.
iii) Witnessing inspections and tests as required in the Rules applicable for ship construction, including
materials, welding and assembling, specifying the items to be examined and/or tested and how
(e.g., by hydrostatic, hose or leak testing, nondestructive examination, verification of geometry)
and by whom.
Appraisal of materials and equipment used for ship construction and their inspection at works is not included in
this Guide. Details of requirements for hull and machinery steel forgings and castings and for normal and higher
strength hull structural steel are given in Section 2-1-6, Section 2-1-5 and Sections 2-1-2 and 2-1-3, respectively,
of the ABS Rules for Materials and Welding (Part 2). Acceptance of these items is verified through the survey
process carried out at the manufacturer’s works and the issuing of the appropriate certificates.
2 Definitions
2.2 Documents
Reference to documents also includes electronic transmission or storage.
3 Applications
9.2 Audit
For audit purposes, the information specified in 9.1 is to be made available.
10.1 Responsibility
The shipbuilder is to deliver documents for the Ship Construction File. In the event that items have been
provided by another party such as the Owner, and where separate arrangements have been made for document
delivery which excludes the shipbuilder, that party has the responsibility.
Inspection of
Hull Welds
[Recommend-
ation 20 and 47]
1.4 Welding – Substantially Visual Pub # 14: Shipbuilder’s Not required .1 Identify
Surface free from examination, Guide for and recognized workstations
Discontinuities significant surface detection Nondestructive standards and where NDE is
indications, techniques, Inspection of Rules as carried out, e.g.,
satisfactory review of Hull Welds applicable, panel line butt
profile and size documents and [Recommend- welding and welds, castings
patrol of operator ation 20 and 47] NDE plans, NDE into hull structure
reports, operator .2 Verify NDE
qualifications carried out in
accordance with
approved plans
where applicable
ABS GUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION . 2007
radiographs
carried out by
the Surveyor
.7 Verify equipment
calibration
satisfactory and in
accordance with
manufacturer’s
and recognized
standards
requirements
.8 Verify NDE is
carried out
according to
the acceptable
process
ABS GUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION . 2007
is satisfactory
.4 Verify that
adequate records
of the tank testing
have been
maintained
6 Structural Structural Witness testing Section 3-7-1 of Reg. II-1/14 of Approved tank Approved tank .1 Confirm that tank
Testing adequacy of the the Rules for SOLAS as testing plan, testing plan testing is carried
design Building and amended shipbuilders out in accordance
Classing Steel inspection with the approved
Vessels records plan
[UR S14] .2 Confirm that
correct test
pressures
maintained for
testing is
satisfactory
ABS GUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION . 2007
Vessels records
securing test
[UR S14]
8.2 Doors and Tightness and Witness Section 3-7-1 of Reg. II-1/18 of Approved tank Details required .1 Confirm leak test
Ramps Integral securing the Rules for SOLAS as testing plan, .2 Confirm
with the Shell Building and amended; Reg. shipbuilder’s operation and
and Bulkheads Classing Steel 12 and 21 of inspection securing test
Vessels ILLC '66 records
.3 Confirm safety
[UR S14] device operation
.4 Ensure correct
maintenance
logs/manuals
supplied with the
ship construction
file
ABS GUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION . 2007
Notes:
1 ABS referenced documents are available from the Rules and Guides Downloads page of www.eagle.org.
2 IACS referenced documents are available from www.iacs.org.uk.
3 IACS Recommendations are not mandatory requirements.
11 Initial Statutory Surveys at New Construction (1 July 2010)
11.1 Scope*
The scope of this section is to define the requirements for the initial statutory surveys at new construction
as detailed in IMO Resolution A.997(25), which are not addressed in UR Z23 for the following as applicable:
i) International Load Line Certificate (1966)
ii) Cargo Ship Safety Equipment Certificate
iii) International Oil Pollution Prevention Certificate
This section only covers the survey activities required and does not cover the technical interpretations of
the statutory requirements or approval of plans, designs and manuals required by the Regulations.
This section does not cover the requirements for type approval or certification at vendor’s works and for
which evidence of acceptance is to be provided as indicated in the survey tables.
11.3 Application
This applies to all vessels for which the statutory certificates listed in 11.1 are to be issued at new construction
by ABS.
1 Description
COLUMN 1 A.997(25) Requirements
COLUMN 2 Survey Item A description of the survey item considered
COLUMN 3 Origin of the Requirement Applicable Statutory Regulation
Correspondence with Approved Indicates whether approved drawings/documentation is required
COLUMN 4
Drawings/Documentation
This verification may consist of an examination of the certificate,
a check of the marks or, for type approved products, to verify
COLUMN 5 Conformity Verification
conformity of the product with the approved prototype or
certification with National Requirements
Survey during construction or Indicates whether the witness by surveyor of fabrication and
COLUMN 6 installation installation on board is required
Indicates whether tightness testing is required to be witnessed by
COLUMN 7 Tightness Testing
the surveyor for survey item
Survey after construction or Indicates whether the survey item is examined by the Surveyor
COLUMN 8 installation after completion of its installation on board and/or
Indicates whether a system is to be subjected to a functioning
COLUMN 9 Function Test and/or performance test or trial in the presence of a Surveyor
after installation on board
Onboard Verification of Indicates whether the required documentation is to be verified on
COLUMN 10
documentation board by the surveyor
Appendix 1
Safety Equipment (1 July 2010)
Onboard Verification
Correspondence with
Approved Drawings/
Inspections During
of Documentation
Function Test
A.997(25) Requirement Survey Item
Verification
Requirement
Installation
Installation
Conformity
Examining the fire pumps and fire main and the disposition of the Fire Pumps X X X X
(SOLAS 74/00 reg.
hydrants, hoses and nozzles and the international shore connection Fire Mains X X
II-2/10.2 FSSC chs.2
(EI) and checking that each fire pump, including the emergency fire
Hydrants and 12) X X
1.1.3.1 pump, can be operated separately so that two jets of water are
Hoses and Nozzles (SOLAS 74/88 X X X
produced simultaneously from different hydrants at any part of
regs. II-2/4 and 19)
the ship whilst the required pressure is maintained in the fire main International Shore Connection X X
(SOLAS 74/00 reg.
(EI) II-2/10.3 FSSC ch.4)
Examining the provision and disposition of the fire extinguishers Fire Extinguishers X X X
1.1.3.2 (SOLAS 74/88 reg.
II-2/6)
(SOLAS 74/00 regs.
ABS GUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION . 2007
Appendix 1
TABLE 1 (continued)
Safety Equipment (1 July 2010)
Onboard Verification
Correspondence with
Approved Drawings/
Inspections During
of Documentation
Function Test
A.997(25) Requirement Survey Item
Verification
Requirement
Installation
Installation
Conformity
Remote means of opening and
Examining the fire-extinguishing and special arrangements in the X X
closing of Skylights
machinery spaces and confirming, as far as practicable and as
Fire Dampers and Funnel opening (SOLAS 74/00 regs. X X X
appropriate, the operation of the remote means of control provided
II-2/5.2, 8.3, 9.5
(EI) for the opening and closing of the skylights, the release of smoke, Closure of power operated and
and 10.5) X X X
1.1.3.6 the closure of the funnel and ventilation openings, the closure of other doors
(SOLAS 74/88 regs.
power operated and other doors, the stopping of ventilation and Remote stops for ventilation II-2/7 and 11) X X
boiler forced and induced draft fans and the stopping of oil fuel and boiler fans
and other pumps that discharge flammable liquids
Remote stops for FO pumps X X
(SOLAS 74/00 regs.
Fixed Fire Detection System II-2/7.2, 7.3, 7.4, X X X X
7.5.1, 7.5.5, 19.3.3
Examining any fire detection and alarm system and any automatic
(EI) and 20.4; FSSC
sprinkler, fire detection and fire alarm system and confirming Fire Alarm System X X X X
1.1.3.7 ch.9)
that installation tests have been satisfactorily completed
(SOLAS 74/88 regs.
Automatic Sprinkler II-2/11, 13, 14, 53 X X X X
and 54)
Spaces containing Paint and/or (SOLAS 74/00 regs.
Examining the fire-extinguishing system for spaces containing flammable liquids: Fire X X
II-2/10.6.3 and
paint and/or flammable liquids and deep-fat cooking equipment in Extinguishing System
(EI) 10.6.4; FSSC chs.4
accommodation and service spaces and confirming that installation
1.1.3.8 Deep-Fat Cooking Equipment to 7)
tests have been satisfactorily completed and that its means of
in Accommodation: Fire (SOLAS 74/88 reg. X X
operation are clearly marked
Extinguishing System II-2/18.7)
Remote Closing Valves for: Oil
Examining the arrangements for remote closing of valves for oil X X
Fuel (SOLAS 74/00 reg.
fuel, lubricating oil and other flammable oils and confirming, as
(EI) Remote Closing Valves for: II-2/4.2.2.3.4)
far as practicable and as appropriate, the operation of the remote X X
1.1.3.9 Lubricating Oil (SOLAS 74/88 reg.
means of closing the valves on the tanks that contain oil fuel,
Remote Closing Valves for: II-2/15.2.5)
lubricating oil and other flammable oils X X
Other Flammable Oils
27
TABLE 1 (continued)
28
Appendix 1
Safety Equipment (1 July 2010)
Onboard Verification
Correspondence with
Approved Drawings/
Inspections During
of Documentation
Function Test
A.997(25) Requirement Survey Item
Verification
Requirement
Installation
Installation
Conformity
Fire Detection and Alarm System X X X X
Fixed Fire Extinguishing System X X
(SOLAS 74/00 regs.
Examining the fire protection arrangements in cargo, vehicle Structural Fire Protection X X X
II-2/10.7, 20.2.1,
(EI) and ro-ro spaces and confirming, as far as practicable and as
Precaution against ignition of 20.3 and 20.6.2)
1.1.3.10 appropriate, the operation of the means for closing the various
flammable vapours in closed (SOLAS 74/88 reg.
openings
vehicle spaces, closed ro-ro II-2/53) X X X
spaces and special category
spaces
Water Supply X X
Sources of Ignition X X X
ABS GUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION . 2007
Appendix 1
TABLE 1 (continued)
Safety Equipment (1 July 2010)
Onboard Verification
Correspondence with
Approved Drawings/
Inspections During
of Documentation
Function Test
A.997(25) Requirement Survey Item
Verification
Requirement
Installation
Installation
Conformity
Survival Craft Design (SOLAS 74/88 reg. X X
(EI) III/31; LSAC
Examining each survival craft, including its equipment Survival Craft Engine X X
1.1.3.14 sections 2.5, 3.1 to
Survival Craft Equipment 3.3 and 4.1 to 4.9) X X
Examining the embarkation arrangements for each survival craft Survival Craft Launching and
and the testing of each launching appliance, including overload (SOLAS 74/00 regs. X X X
Recovery appliances
(EI) tests, tests to establish the lowering speed and the lowering of III/11, 12, 13, 16,
1.1.3.15 each survival craft to the water with the ship at its lightest sea- 31 and 33; LSAC
going draught, and, where applicable, launching underway at 5 Survival Craft Embarkation section 6.1) X X X
knots, checking the recovery of each lifeboat Arrangements
Examining the embarkation arrangements for each marine evacuation MES Launching and Recovery
device, where applicable, and the launching arrangements, including X X X X
appliances (SOLAS 74/00 reg.
(EI) inspection for lack of side shell opening between the embarkation
III/15; LSAC
1.1.3.16 station and waterline, review of distance to the propeller and other
MES Embarkation section 6.2)
life-saving appliances and ensuring that the stowed position is X X
protected from heavy weather damage, as much as practicable Arrangements
Appendix 1
Safety Equipment (1 July 2010)
Onboard Verification
Correspondence with
Approved Drawings/
Inspections During
of Documentation
Function Test
A.997(25) Requirement Survey Item
Verification
Requirement
Installation
Installation
Conformity
Examining the provision and stowage and checking the operation Two-way VHF radiotelephone
(EI) (SOLAS 74/88 regs. X X X
of portable on board communications equipment, if provided, and apparatus
1.1.3.21 II-2/12.2 and III/6)
two-way VHF radiotelephone apparatus and radar transponders Radar Transponders X X X
Distress Flares and Line-
Examining the provision and stowage of the distress flares and (SOLAS 74/00 regs. X X
Throwing Appliances
(EI) the line-throwing appliance, checking the provision and operation III/6 and 18; LSAC
On board Communications
1.1.3.22 of fixed on board communications equipment, if provided, and sections 3.1, 7.1 X X X
equipment
testing the means of operation of the general alarm system and 7.2)
General Alarm System X X X
Lifebuoys X X X
Lifebuoys fitted with self-igniting
ABS GUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION . 2007
X X X
lights
Examining the provision, disposition and stowage of the Lifebuoys fitted with self- (SOLAS 74/00 regs. X X X
(EI) lifebuoys, including those fitted with self-igniting lights, self- activating smoke signals III/7 and 32 to 37;
1.1.3.23 activating smoke signals and buoyant lines, lifejackets, and Lifebuoys fitted with buoyant LSAC sections 2.1,
X X X
immersion suits lines 2.5 and 3.3)
Lifejackets X X X
Immersion suits X X X
Anti-exposure suits X X X
ABS GUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION . 2007
Appendix 1
TABLE 1 (continued)
Safety Equipment (1 July 2010)
Onboard Verification
Correspondence with
Approved Drawings/
Inspections During
of Documentation
Function Test
A.997(25) Requirement Survey Item
Verification
Requirement
Installation
Installation
Conformity
Muster and Embarkation Station
X X
Lighting
Alleyways and Stairways
X X
Lighting
Exits giving Access to the Muster
and Embarkation Stations X X
Lighting
Checking the lighting of the muster and embarkation stations and
(EI) the alleyways, stairways and exits giving access to the muster Muster and Embarkation Station (SOLAS 74/88 regs.
1.1.3.24 and embarkation stations, including when supplied from the Lighting from Emergency II-1/43 and III/11) X X
emergency source of power Source of Power
Alleyways and Stairways
Lighting from Emergency X X
Source of Power
Exits giving Access to the Muster
and Embarkation Stations
X X
Lighting from Emergency
Source of Power
(International
Navigation Lights Regulations for X X X X
Examining the provision and positioning and checking the Preventing
(EI)
operation of, as appropriate, the navigation lights, shapes and Collisions at Sea
1.1.3.25
sound signalling equipment Shapes and Sounds signalling (COLREG) in force,
regs. 20 to 24, 27 X X X
equipment
to 30 and 33)
Checking that the minimum safe distances from the steering and
(EI) (SOLAS 74/00 regs.
standard magnetic compasses for all electrical equipment are Bridge X
1.1.3.26 V/17 and 19)
complied with
(EI) Checking the electromagnetic compatibility of electrical and (SOLAS 74/00 reg.
Bridge X X
1.1.3.27 electronic equipment on or in the vicinity of the bridge V/17)
31
TABLE 1 (continued)
32
Appendix 1
Safety Equipment (1 July 2010)
Onboard Verification
Correspondence with
Approved Drawings/
Inspections During
of Documentation
Function Test
A.997(25) Requirement Survey Item
Verification
Requirement
Installation
Installation
Conformity
(EI) Checking, as appropriate, the provision and operation of the
1.1.3.28 following ship borne navigational systems equipment
Navigation Equipment: Magnetic
(EI) X X
The magnetic compass, including examining the sighting, movement, Compass (SOLAS 74/00 reg.
1.1.3.28
illumination and a pylorus or compass bearing device Navigation Equipment: Pylorus V/19)
.1 X X
or Compass Bearing Device
Nautical charts and nautical publications necessary for the intended Navigation Equipment: ECDIS
(EI) X X
voyage are available and have been updated, and, where electronic including back-up arrangements (SOLAS 74/00 reg.
1.1.3.28
systems are used, the electronic charts have been updated and Nautical Charts and Nautical V/19)
.2 X
the required back-up system is provided and updated Publications
ABS GUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION . 2007
(EI)
Global navigation satellite system receiver or terrestrial radio Navigation Equipment: GNSS
1.1.3.28 X X
navigation system receiver
.3
(EI)
Navigation Equipment: Sound
1.1.3.28 Sound reception system, when bridge is totally enclosed X X
Reception System
.4
(EI) Navigation Equipment: Means
Means of communication to emergency steering position, where
1.1.3.28 of communication with X X X
provided
.5 Emergency Steering Position
(EI)
Navigation Equipment: Spare
1.1.3.28 Spare magnetic compass X X
Magnetic Compass
.6
(EI)
Navigation Equipment:
1.1.3.28 Daylight signalling lamp X X
Daylight Signalling Lamp
.7
(EI)
Navigation Equipment: Echo-
1.1.3.28 Echo sounding device X X
sounding Device
.8
ABS GUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION . 2007
Appendix 1
TABLE 1 (continued)
Safety Equipment (1 July 2010)
Onboard Verification
Correspondence with
Approved Drawings/
Inspections During
of Documentation
Function Test
A.997(25) Requirement Survey Item
Verification
Requirement
Installation
Installation
Conformity
(EI)
Navigation Equipment: Radar
1.1.3.28 Radar reflector X X
Reflector
.9
(EI) Radar(s), including examining the waveguide and cable runs for
Navigation Equipment: Radar
1.1.3.28 routeing and protection and the display unit confirming lighting, X X X
Installations
.10 correct operation of all controls, and functions
Navigation Equipment:
X X
(EI) Electronic Plotting Aid
Electronic plotting aid, automatic tracking aid or automatic radar
1.1.3.28 Navigation Equipment:
plotting aid as appropriate, using the appropriate test facilities
.11 Automatic Tracking aid(s) or X X
Automatic Radar Plotting Aid
(EI)
Speed and distance measuring devices "through the water" and Navigation Equipment: Speed
1.1.3.28 X X
"over the ground" and Distance measuring Device
.12
(EI) Transmitting heading device providing heading information to
Navigation Equipment:
1.1.3.28 radar, plotting aids and automatic identification system X X
Transmitting Heading Device
.13 equipment and voyage data recorder
(EI)
Navigation Equipment: AIS
1.1.3.28 Automatic identification system X X
Automatic Identification System
.14
Navigation Equipment: Gyro
(EI) X X
Gyrocompass, including examining the alignment of the master Compass
1.1.3.28
and all repeaters Navigation Equipment: Gyro
.15 X X
Compass Repeaters
(EI)
Navigation Equipment: Rudder
1.1.3.28 Rudder angle indicator X X
Angle Indicator
.16
33
TABLE 1 (continued)
34
Appendix 1
Safety Equipment (1 July 2010)
Onboard Verification
Correspondence with
Approved Drawings/
Inspections During
of Documentation
Function Test
A.997(25) Requirement Survey Item
Verification
Requirement
Installation
Installation
Conformity
(EI) Navigation Equipment:
1.1.3.28 Propeller rate of revolution indicator Propeller rate of Revolution X X
.17 Indicator
(EI) Navigation Equipment:
1.1.3.28 Propeller, operational mode, thrust, and pitch indicator Variable-Pitch propeller pitch X X
.18 and operational mode indicator
(EI)
Navigation Equipment: Rate of
1.1.3.28 Rate-of-turn indicator X X
Turn Indicator
.19
(EI) Navigation Equipment:
1.1.3.28 Heading or track control system Heading or Track Control X X
ABS GUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION . 2007
.20 System
(EI) (SOLAS 74/00 reg.
Checking for the provision and operation of the voyage data recorder VDR – Voyage Data Recorder X X
1.1.3.29 V/20)
(EI) (SOLAS 74/00 reg.
Checking navigation bridge visibility Navigation Bridge Visibility X
1.1.3.31 V/22)
(EI) Checking the provision and, as appropriate, the deployment or Pilot ladders and hoists/pilot (SOLAS 74/00 reg.
X X X X
1.1.3.32 operation of the pilot ladders and hoists/pilot transfer arrangements transfer arrangements V/23)
Deck Foam System: Foam Tanks X X
(SOLAS 74/00 reg.
Checking the deck foam system, including the supplies of foam Deck Foam System: Monitors X X X
II-2/10.8; FSSC
(EI) concentrate, and testing that the minimum number of jets of water
Deck Foam System: Applicators ch.15) X X X
1.1.4.1 at the required pressure in the fire main is obtained (see (EI) 1.1.3.1)
(SOLAS 74/88 reg.
when the system is in operation Deck Foam System: Foam
II-2/61) X
Concentrates
(SOLAS 74/00 reg.
II-2/4.5.5; FSSC
(EI)
Examining the inert gas system and in particular: Cargo Tank Protection: Venting ch.15) X X
1.1.4.2
(SOLAS 74/88 reg.
II-2/62)
ABS GUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION . 2007
Appendix 1
TABLE 1 (continued)
Safety Equipment (1 July 2010)
Onboard Verification
Correspondence with
Approved Drawings/
Inspections During
of Documentation
Function Test
A.997(25) Requirement Survey Item
Verification
Requirement
Installation
Installation
Conformity
(EI)
1.1.4.2. Examining externally for any sign of gas or effluent leakage Signs of Gas or Effluent Leakage X X
1
(EI)
1.1.4.2. Confirming the proper operation of both inert gas blowers Inert Gas Blowers X
2
(EI)
1.1.4.2. Observing the operation of the scrubber-room ventilation system Scrubber Room Ventilation X
3
(EI)
1.1.4.2. Checking the deck water seal for automatic filling and draining Deck Water Seal X X
4
(EI) Remote or Automatic Control
Examining the operation of all remotely operated or automatically X
1.1.4.2. Valves
controlled valves and, in particular, the flue gas isolating valves
5 Flue Gas Isolating Valve X X
(EI)
1.1.4.2. Observing a test of the interlocking feature of soot blowers Interlocking of soot Blowers X
6
(EI)
Observing that the gas pressure-regulating valve automatically
1.1.4.2. Gas Pressure-Regulating Valve X
closes when the inert gas blowers are secured
7
(EI) Checking, as far as practicable, the following alarms and safety
1.1.4.2. devices of the inert gas system using simulated conditions where X
8 necessary:
(EI)
Simulation Test for Alarms and
1.1.4.2. High oxygen content of gas in the inert gas main X
Safety Devices
8.1
35
TABLE 1 (continued)
36
Appendix 1
Safety Equipment (1 July 2010)
Onboard Verification
Correspondence with
Approved Drawings/
Inspections During
of Documentation
Function Test
A.997(25) Requirement Survey Item
Verification
Requirement
Installation
Installation
Conformity
(EI)
Simulation Test for Alarms and
1.1.4.2. Low gas pressure in the inert gas main X
Safety Devices
8.2
(EI)
Simulation Test for Alarms and
1.1.4.2. Low pressure in the supply to the deck water seal X
Safety Devices
8.3
(EI)
Simulation Test for Alarms and
1.1.4.2. High temperature of gas in the inert gas main X
Safety Devices
8.4
(EI)
Simulation Test for Alarms and
1.1.4.2. Low water pressure or low water-flow rate X
ABS GUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION . 2007
Safety Devices
8.5
(EI)
Accuracy of portable and fixed oxygen-measuring equipment by Simulation Test for Alarms and
1.1.4.2. X X
means of calibration gas Safety Devices
8.6
(EI)
Simulation Test for Alarms and
1.1.4.2. High water level in the scrubber X
Safety Devices
8.7
(EI)
Simulation Test for Alarms and
1.1.4.2. Failure of the inert gas blowers X
Safety Devices
8.8
Failure of the power supply to the automatic control system for
(EI)
the gas regulating valve and to the instrumentation for Simulation Test for Alarms and
1.1.4.2. X
continuous indication and permanent recording of pressure and Safety Devices
8.9
oxygen content in the inert gas main
(EI)
Simulation Test for Alarms and
1.1.4.2. High pressure of gas in the inert gas main X
Safety Devices
8.10
ABS GUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION . 2007
Appendix 1
TABLE 1 (continued)
Safety Equipment (1 July 2010)
Onboard Verification
Correspondence with
Approved Drawings/
Inspections During
of Documentation
Function Test
A.997(25) Requirement Survey Item
Verification
Requirement
Installation
Installation
Conformity
(EI)
Checking the proper operation of the inert gas system on
1.1.4.2. IGS Operating Procedure X
completion of the checks listed above
9
Examining the fixed fire-fighting system for the cargo pump room, Cargo Pump Room Fire
(SOLAS 74/00 reg. X X
confirming that the installation tests have been satisfactorily Extinguishing
(EI) II-2/10.9; FSSC
completed and that its means of operation are clearly marked
1.1.4.3 Cargo Pump Room Means of chs.5, 6, 7 and 8, as
and, when appropriate, checking the operation of the remote X X
Closing Various Opening applicable)
means for closing the various openings
Temperature sensing devices X X X
Interlock between lighting and (SOLAS 74/00 reg.
(EI) Examining the protection of the cargo pump-rooms and confirming II-2/4.5.10) X
ventilation
1.1.4.4 that the installation tests have been satisfactorily completed (SOLAS 74/88 regs.
Monitoring of hydrocarbon gas II-2/55 to 58) X X
Bilge monitoring X
Confirming that the fire control plans are permanently exhibited or, (SOLAS 74/00 reg.
(EI) alternatively, emergency booklets have been provided and that a II-2/15.2.4)
Required Documentations X
1.1.5.1 duplicate of the plans or the emergency booklet are available in (SOLAS 74/88 reg.
a prominently marked enclosure external to the ship's deckhouse II-2/20)
(EI) (SOLAS 74/00 regs.
Confirming that maintenance plans have been provided Required Documentations X
1.1.5.2 II-2/14.2.2 and 14.4)
(SOLAS 74/00 regs.
(EI) Confirming that the training manuals and the fire safety operational
Required Documentations II-2/15.2.3, 16.2 X
1.1.5.3 booklets have been provided
and 16.3)
(SOLAS 74/00 reg.
Confirming, where appropriate, that the ship is provided with a
(EI) II-2/19.4)
document indicating compliance with the special requirement Required Documentations X
1.1.5.4 (SOLAS 74/88 reg.
for carrying dangerous goods
II-2/54(3))
37
TABLE 1 (continued)
38
Appendix 1
Safety Equipment (1 July 2010)
Onboard Verification
Correspondence with
Approved Drawings/
Inspections During
of Documentation
Function Test
A.997(25) Requirement Survey Item
Verification
Requirement
Installation
Installation
Conformity
Confirming that emergency instructions are available for each
(EI) person on board, that the muster list is posted in conspicuous (SOLAS 74/00 regs.
Required Documentations X
1.1.5.5 places and they are in a language understood by the persons on III/8 and 37)
board
(EI) Confirming that the training manual and training aids for the (SOLAS 74/00 reg.
Required Documentations X
1.1.5.6 lifesaving appliances have been provided III/35)
(EI) Confirming that the instructions for on board maintenance of the (SOLAS 74/88 reg.
Required Documentations X
1.1.5.7 life-saving appliances have been provided III/36)
Confirming that a table or curve of residual deviations for the
(EI) (SOLAS 74/00 reg.
magnetic compass has been provided, and that a diagram of the Required Documentations X
1.1.5.8 V/19)
radar installations shadow sectors is displayed
ABS GUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION . 2007
(EI) Checking that operational and, where appropriate, maintenance (SOLAS 74/00 reg.
Required Documentations X
1.1.5.9 manuals for all navigational equipment are provided V/16)
(EI) Checking that the charts and nautical publications necessary for (SOLAS 74/88 reg.
Required Documentations X
1.1.5.10 the intended voyage are available and have been updated V/27)
Checking that the International Code of Signals and a copy of
(EI) (SOLAS 74/00/02,
Volume III of the International Aeronautical and Maritime Required Document X
1.1.5.11 reg. V/21)
Search and Rescue (IAMSAR) Manual have been provided
(EI) Checking that arrangements are provided to maintain records of (SOLAS 74/00/03,
Required Documents X
1.1.5.12 navigational activities and daily reporting reg. V/28)
(EI) Checking that the life-saving signals to be used by ships, aircraft (SOLAS 74/00,
Required Documents X
1.1.5.13 or persons in distress are available reg. V/29)
(EI) (SOLAS 74/02,
Confirming that continuous synopsis record is provided Required Documents X
1.1.5.14 reg. XI-1/5)
(FSSC ch.15
(EI) Confirming, when appropriate, that the instruction manuals for paragraph 2.4.4)
Required Documents X
1.1.6.1 the inert gas system have been provided (SOLAS 74/88,
reg. II-2/62.21)
ABS GUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION . 2007
Appendix 1
TABLE 2
Load Line (1 July 2010)
Conformity Verification
On Board Verification
Correspondence with
Approved Drawings/
of Documentation
Construction or
Documentation
Survey During
Origin of the
Tightness Test
Function Test
A.997(25) Requirement Survey Item
Survey After
Requirement
Installation
Installation
(LI) For the load line the survey during construction and after
1.1.2 installation should consist of:
(LI) Confirming that the deck line and load line mark are properly Positioning of Deck Line and (LLC 66/88 regs. 4
X X
1.1.2.2 positioned Load Line Mark to 9)
(LI) (LLC 66/88/03 reg.
Witnessing the inclining experiment or lightweight survey Inclining Experiment X X
1.1.2.3 10)
(LI) Examining the superstructure end bulkheads and the openings Superstructure End Bulkheads (LLC 66/88 regs.
1.1.2.4 therein Superstructure Openings 11 and 12) X X X X
Freeboard Deck – Means of
Securing the weather tightness X X X X
of Cargo Hatchways
Freeboard Deck – Means of
Securing the weather tightness X X X
of Other Hatchways
Freeboard Deck – Means of
Securing the weather tightness X X X
Examining the means of securing the weather tightness of cargo of Other Openings
(LI) (LLC 66/88 regs.
hatchways, other hatchways and other openings on the freeboard
1.1.2.5 Superstructure Deck – Means 13 to 18)
and superstructure decks
of Securing the weather X X X X
tightness of Cargo Hatchways
Superstructure Deck – Means
of Securing the weather X X X
tightness of Other Hatchways
Superstructure Deck – Means
of Securing the weather X X X
tightness of Other Openings
39
TABLE 2 (continued)
40
Appendix 1
Load Line (1 July 2010)
Conformity Verification
On Board Verification
Correspondence with
Approved Drawings/
of Documentation
Construction or
Documentation
Survey During
Origin of the
Tightness Test
Function Test
A.997(25) Requirement Survey Item
Survey After
Requirement
Installation
Installation
Ventilators and air pipes
(LI) Examining the ventilators and air pipes, including their (LLC 66/88 regs.
including their coamings and X X X
1.1.2.6 coamings and closing appliances 19 and 20)
closing appliances
Closures to any openings in the
(LI) Examining the watertight integrity of the closures to any
ship's side below the freeboard (LLC 66/88 reg. 21) X X X X X
1.1.2.7 openings in the ship's side below the freeboard deck
deck
(LI)
Examining the scuppers, inlets and discharges Scuppers, Inlets and Discharger (LLC 66/88 reg. 22) X X X
1.1.2.8
(LI) (LLC 66/88/03,
Examining the garbage chutes Garbage chute X X X
1.1.2.9 reg. 22-1)
ABS GUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION . 2007
Appendix 1
TABLE 2 (continued)
Load Line (1 July 2010)
Conformity Verification
On Board Verification
Correspondence with
Approved Drawings/
of Documentation
Construction or
Documentation
Survey During
Origin of the
Tightness Test
Function Test
A.997(25) Requirement Survey Item
Survey After
Requirement
Installation
Installation
Uprights X X
(LI) Checking, when applicable, of the fittings and appliances for Lashings (LLC 66/88 regs. X X
1.1.2.15 timber deck cargoes Stability 42 to 45) X X
Protection of Crew X X
(LI) Checking that the loading and ballasting information has been
Loading and Stability Manual (LLC 66/88 reg. 10) X X
1.1.3.1 supplied to the master
41
TABLE 3
42
Appendix 1
MARPOL Annex 1 (1 July 2010)
Conformity Verification
Onboard Verification
Correspondence with
Approved Drawings/
of Documentation
Construction or
Documentation
Survey During
Origin of the
Function Test
A.997(25) Requirement Survey Item
Survey After
Requirement
Installation
Installation
Requirements for All Ships
Confirming the satisfactory installation and operation of, as
appropriate, oil filtering equipment and when appropriate the oil filtering equipment MARPOL 90/04
(OI)
operation of the automatic means provided to stop the discharge Automatic Stopping Device Annex I regs. 14 X X X X
1.1.3.1
of effluent and the satisfactory operation of the alarm - or other Alarm and 15
installation
Confirming, when applicable, that the oil content meter and its Oil Content Meter MARPOL 90/04 X X X
(OI)
recording device are operable and that there is a sufficient Recording Device Annex I regs. 14 X X X
1.1.3.2
supply of consumables for the recording device on board Consumables and 15 X
(OI) testing, where fitted, the automatic stopping device required for MARPOL 90/04
ABS GUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION . 2007
Stopping Device X
1.1.3.3 discharges in Special Areas Annex I reg. 15
(OI) confirming the segregation of the oil fuel and water ballast Segregation of WB and Oil MARPOL 90/04
X X
1.1.3.4 system and the non-carriage of oil in forepeak tanks Carriage of Oil in FP Tank Annex I reg. 16
Confirming that the oily residue (sludge) tank and its discharge Oily residue (sludge) tank X X
arrangements are satisfactory and, when the size of the sludge Discharge Arrangement X X
(OI) MARPOL 90/04
tank is approved on the basis of such installations, confirming
1.1.3.5 Approved Sludge Tank's Size Annex I reg. 12 X X
the satisfactory operation of homogenizers, sludge incinerators
or other recognised means for the control of sludge Incinerators/Homogenisers X X X X
(OI) MARPOL 90/04
Confirming the provision of the standard discharge connection Standard Discharge Connection X
1.1.3.6 Annex I reg. 13
(OI) MARPOL 90/04
Confirming oil fuel tank protection arrangements Tank Arrangements X X
1.1.3.7 Annex I reg. 12A
ABS GUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION . 2007
Appendix 1
TABLE 3 (continued)
MARPOL Annex 1 (1 July 2010)
Conformity Verification
Onboard Verification
Correspondence with
Approved Drawings/
of Documentation
Construction or
Documentation
Survey During
Origin of the
Function Test
A.997(25) Requirement Survey Item
Survey After
Requirement
Installation
Installation
Additional Requirements for Oil Tankers
Confirming that the arrangements of slop tanks or cargo tanks Slop Tanks MARPOL 90/04 X X
(OI)
designated as slop tanks and associated piping systems are Cargo Tanks designated as slop Annex I regs. 29
1.1.4.1 X X
satisfactory tanks and 34
Discharge Monitoring and
X X X X
Confirming the satisfactory installation and operation of the oil Control System
discharge monitoring and control system, including any audible Audible and Visual Alarms X X
MARPOL 90/04
(OI) or visual alarms, the automatic and manual means to stop the
Automatic and manual means Annex I regs. 31
1.1.4.2 discharge of effluent, the starting interlock and the accuracy of X X
to stop discharge of Effluent and 34
the flow meter and the applicable resolution’s requirements for
installation survey Starting Interlock X X
Accuracy Flow Meter X X
Confirming that the oil content meter and its recording device MARPOL 90/04
(OI) Oil Content meter and
are operable and that there is a sufficient supply of consumables Annex I regs. 31 X X X
1.1.4.3 recording device
for the recording device on board and 34
(OI) Confirming that the approved oil/water interface detectors are MARPOL 90/04
Oil/water interface detectors X X
1.1.4.4 on board and are operational Annex I reg. 32
Confirming that the arrangements of pumps, pipes and valves
(OI) are in accordance with the requirements for segregated ballast Segregated Ballast Tanks: MARPOL 90/04
X X
1.1.4.5 systems and that there are no cross-connections between the Pumps, Piping and Valves Annex I reg. 18
cargo and segregated ballast systems
Where a portable spool piece is provided for the emergency
discharge of segregated ballast by connecting the segregated
(OI) ballast system to a cargo pump, confirming that non-return Segregated Ballast Tanks: MARPOL 90/04
X X
1.1.4.6 valves are fitted on the segregated ballast connections and that Emergency Discharge Annex I reg. 18
the spool piece is mounted in a conspicuous position in the
pump room with a permanent notice restricting its use
43
TABLE 3 (continued)
44
Appendix 1
MARPOL Annex 1 (1 July 2010)
Conformity Verification
Onboard Verification
Correspondence with
Approved Drawings/
of Documentation
Construction or
Documentation
Survey During
Origin of the
Function Test
A.997(25) Requirement Survey Item
Survey After
Requirement
Installation
Installation
Testing ballast pipelines that pass through cargo tanks and those
(OI) MARPOL 90/04
cargo pipelines that pass through ballast tanks to ensure there is Pipelines X X
1.1.4.7 Annex I reg. 18
no cross contamination
MARPOL 90/04
(OI) Confirming that the crude oil washing system is installed in
Annex I regs. 18 & X
1.1.4.8 accordance with the approved plans and, in particular:
33
Examining crude oil washing piping, pumps, valves and deck
(OI)
mounted washing machines for signs of leakage and to check Piping, Pumps Valves &
1.1.4.8. X
that all anchoring devices for crude oil washing piping are intact Anchoring Devices
1
and secure;
(OI)
ABS GUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION . 2007
Appendix 1
TABLE 3 (continued)
MARPOL Annex 1 (1 July 2010)
Conformity Verification
Onboard Verification
Correspondence with
Approved Drawings/
of Documentation
Construction or
Documentation
Survey During
Origin of the
Function Test
A.997(25) Requirement Survey Item
Survey After
Requirement
Installation
Installation
(OI) Verifying the effectiveness of the crude oil washing system and, COW-Crude Oil Washing: MARPOL 90/04
1.1.4.9 in particular: Effectiveness Annex I reg. 33
Checking that the crude oil washing machines are operable and
(OI)
to observe the proper operation of the washing machines by
1.1.4.9. X X
means of the movement indicators and/or sound patterns or
1
other approved methods;
(OI) Checking the effectiveness of the stripping system in appropriate
1.1.4.9. cargo tanks by observing the monitoring equipment and by X
2 hand-dipping or other approved means;
(OI) Verifying by internal tank inspection after crude oil washing
1.1.4.9. that the installation and operational procedures laid down in the X
3 Operations and Equipment Manual are satisfactory;
Confirming that, where there is a crude oil washing system, an
(OI) inert gas system has been installed and tested in accordance with COW-Crude Oil Washing:
X X X
1.1.4.10 the requirements of SOLAS 74/88/2000 (see (EI) 1.1.4.2 in General
Annex 1);
Confirming, as appropriate, that the arrangements for the prevention MARPOL 90/04
(OI) Pollution due to Collision or
of oil pollution in the event of collision or stranding are in accordance Annex I regs. 19 to X X
1.1.4.11 Stranding
with the approved plans 22
(OI) Confirming that the piping systems associated with the discharge MARPOL 90/04
Pumping, Piping and Discharge X X
1.1.4.12 of dirty ballast water or oil-contaminated water are satisfactory Annex I reg. 30
Confirming that the observation and discharge control positions
(OI) for visually observing the discharge of oil-contaminated water, Observation and Discharge MARPOL 90/04
X X
1.1.4.13 including the testing of the communication system between the Control Annex I reg. 30
two positions are satisfactory
45
TABLE 3 (continued)
46
Appendix 1
MARPOL Annex 1 (1 July 2010)
Conformity Verification
Onboard Verification
Correspondence with
Approved Drawings/
of Documentation
Construction or
Documentation
Survey During
Origin of the
Function Test
A.997(25) Requirement Survey Item
Survey After
Requirement
Installation
Installation
Confirming that the means of draining cargo pumps and cargo Means of Draining and Stripping X X
(OI) lines, including the provision of a stripping device and the MARPOL 90/04
1.1.4.14 connections for pumping to the slop or cargo tanks or ashore are Means for pumping ashore/slop/ Annex I reg. 30 X X
satisfactory cargo tanks
MARPOL 90/04
(OI) Confirming that closing devices installed in the cargo transfer
Closing arrangements Annex I regs. 23 & X
1.1.4.16 system and cargo piping, as appropriate, are satisfactory
26
Confirming that the subdivision and stability arrangements, in MARPOL 90/04
(OI) Stability Manual
addition to the provision of (OI) 1.1.4.16, to prevent progressive Annex I regs. 23 & X X X
1.1.4.17 Tank Arrangement
flooding are satisfactory 26
(OI) Confirming the arrangements for cargo pump-room bottom MARPOL 90/04
ABS GUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION . 2007
Tank Arrangements X X
1.1.4.18 protection (double bottom where required) Annex I reg. 22
Requirements for All Ships
(OI) Confirming that certificates for type approval for the oil filtering MARPOL 90/04
Type Approval Certificates X X
1.1.5.1 equipment and oil content meters are available Annex I reg. 14
(OI) MARPOL 90/04
Confirming that the Oil Record Book (Part I) has been provided Oil Record Book X
1.1.5.2 Annex I reg. 17
Confirming that the shipboard oil pollution emergency plan or,
(OI) MARPOL 90/04
in the case of a chemical/product tanker, a shipboard marine SOPEP/SMPEP X X
1.1.5.3 Annex I reg. 37
pollution emergency plan has been provided
Confirming, as appropriate, that the Operating and Maintenance
(OI)
manuals for the 15 ppm bilge separator and 15 ppm bilge alarm Operations Manual X
1.1.5.4
are available
Additional Requirements for Oil Tankers
COW-Crude Oil Washing:
(OI) confirming that, if applicable, a Crude Oil Washing Operations MARPOL 90/04
Operations & Equipment X X
1.1.6.2 and Equipment Manual has been provided Annex I reg. 35
Manual
ABS GUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION . 2007
Appendix 1
TABLE 3 (continued)
MARPOL Annex 1 (1 July 2010)
Conformity Verification
Onboard Verification
Correspondence with
Approved Drawings/
of Documentation
Construction or
Documentation
Survey During
Origin of the
Function Test
A.997(25) Requirement Survey Item
Survey After
Requirement
Installation
Installation
Confirming that an operations manual for the oil discharge
(OI) MARPOL 90/04
monitoring and control system has been provided together with ODM Operation Manual X X
1.1.6.3 Annex I reg. 31
any other documentation requested by the applicable resolution
Confirming that certificates for type approval for the oil content MARPOL 90/04
(OI)
meters, oil discharge monitoring and control system and Type Approval Certificates Annex I regs. 31 X
1.1.6.4
oil/water interface detectors are available and 32
(OI) MARPOL 90/04
Confirming that an Oil Record Book (Part II) has been provided Oil Record Book X
1.1.6.5 Annex I reg. 36
(OI) Confirming that the information and data concerning the loading Loading and Damage Stability MARPOL 90/04
X X
1.1.6.7 and damage stability has been provided Data Annex I reg. 28
Confirming that the shipboard oil pollution emergency plan or
(OI) MARPOL 90/04
in the case of a chemical/product tanker a shipboard marine SOPEP/SMPEP X X
1.1.6.8 Annex I reg. 37
pollution emergency plan has been provided
Confirming, for oil tankers of 5,000 deadweight and above
(OI) MARPOL 90/04
delivered on/after 1 February 2002, that the intact stability has Stability Information X X
1.1.6.9 Annex I reg. 27
been approved
Confirming, for oil tankers of 5,000 deadweight and above, that
(OI) arrangements are in place to provide prompt access to shore- Shore based emergency MARPOL 90/04
X
1.1.6.10 based damage stability and residual structural strength support arrangements Annex I reg. 37.4
computerized calculation programmes
47
Appendix 2: Shipyard Review Record
2 Construction Facilities
(Documents such as a brochure of shipyard can be attached in lieu of completing this section.)
(4) Fillet welding machine ( Gravity, Automatic ) Percentage of automatization, except gravity: about _____ %
- Line welder ( No, Yes: submerged arc × _____ heads, CO2 × _____ heads )
- Small automatic fillet welding machine ( No, Yes: Name: _______________ × _____ )
- Welding robot ( No, Yes: Portal × _____, Rectangular × _____, Articulated × _____ )
(6) Vertical automatic welding machine ( No, Yes: EG × _____, SEG × _____, ES × _____ )
EG: Electrogas SEG: Simplified Electrogas ES: Electroslag
Confirm system in
Shipyard workers
place
Confirm system in
Subcontracted workers
place
(4) Final dock ( No, Yes: In-house, Other place of the same company, Use other company )
Note: Above-mentioned (3) and (4) include the acceptance inspection of subcontracted items.
Note:
(3) NDE subcontractor company’s name and official technical Name _______________
qualifications (approved by) ________
Name _______________
(approved by) ________
Note: Even if all works are subcontracted, it is recommendable to attach the qualified person(s) who can verify the works.
(2) Are means for checking the material grade in hand prescribed for
high-grade steels?
(3) Are regulations prescribed for checking the material grade for
high-tensile steel and steel for low-temperature applications?
Are there regulations for inscribing “high-tensile steel” on the
surface of the high tensile steel and special indication for steel
for low temperature applications?
(4) Are there procedures for re-using of remaining cut-off mild steel?
(6) In the case of (4) and (5) above, can a collation be made with the mill
sheet?
(7) Section of controlling the lists of remaining cut-off steel Name of section:
____________________
Notes:
- In the case of high-tensile steel, are there means for identifying different grades?
- In the case of (3) and (4) above, are the materials approved by other classes controlled similarly?
Note:
- The standard is to include the description related traceability after shot blasting and primer coating.
- Reference is to be made to IMO Performance Standard for Protective Coatings (PSPC) and its relevant ABS Guide for
Classification Notations Coating Performance Standards (CPS)
(5) In the case of NC, are the disks, tapes, etc., maintained in good
condition?
(6) What are the measures adopted and guidance given to make the worker
fully conversant with cutting work standards for maintaining
accuracy?
Notes:
- In the case of (2) and (3) above, check items are to include confirmation of edge preparations free from piercing hole.
- NC for section bars is also to be in accordance with the above.
(2) Existence of regulations for plate thickness and bending radius for
flange processing
(3) What are the measures adopted and guidance given to make the
worker fully conversant with maintaining quality and accuracy
during the bending process?
Note:
Note:
(3) Was the extent of tests extended considering the results of the test?
Note:
(3) Are local air injection tests during sub-assembly works applied to?
(4) If (2) or (3) above is applied to, are the test procedures approved by
ABS?
Note: