You are on page 1of 17

Name of work : Construction of Yudhiri Bridge

DDR 180 ft span and 3.277 mtrs Carriage way


Location : On Trashigang - Phongmey Gewog Center Road
Regional Office, Department of Roads, Trashigang

Summary of Cost

SN Type of work Total Cost (Nu)

1 Method of Measurement and Site Installation

2 Earthwork

3 PCC, RCC, Formworks and Other Involved Works

4 Bailey bridge superstructure

5 RCC wall along river bank

6 approach road, B/wall & Drain

Total Cost

Amount in Words: Ngultrums

Signature of the Bidder: ____________________________________

Name of Bidder: ________________________________________________

Page 1
BoQ for Construction of Yudhiri Bailey Bridge

Type of Work: 1000 - Method of Measurement and Site Installation


Rate Amount
SN Code Description of item Unit Quantity
Nu. Nu.
1 1001 Method of Measurement:
2 1001.1 Description:
The descriptions identify the work covered by
the respective items, but the exact nature and
extent of the work is to be ascertained from the
Drawings & Specifications.
3 1001.2 Quantities

The quantities shall be computed net using


dimensions from the drawing, unless directed
otherwise by the client's site engineer. No
allowance shall be made for bulking, shrinkage
or waste. No other type, terms or regulation for
computing the quantities will be used and
4
accepted. For any kind of work and item, the net
dimension will be used for computing the
quantities. Quantities may be rounded up or
down where appropriate. Fractional quantities
are not generally necessary and should not be
given to more than two places of decimals.

5 1001.3 Unit of measurement


The following units of measurement and
6
abbreviations shall be used.
Unit & Abbreviation:
Millimetre = mm
Metre = m
Square millimetre = mm²
Square metre = m²
Cubic metre = m³
7
Kilogramme = kg
Tonne = t
Sum = sum
Number = No.
Hour = hr.

Site Installation: (facilities, tools, plant,


8 1002
equipment etc)
For all items, the relevant enclosed drawings
are an integral part of this bill of quantities. The
9 1002.1 contractor shall prepare and submit site
installation plan for strict implementation at
site.

Site Installation Page: 1 of 4


BoQ for Construction of Yudhiri Bailey Bridge

Type of Work: 1000 - Method of Measurement and Site Installation


Rate Amount
SN Code Description of item Unit Quantity
Nu. Nu.
The contractor shall be deemed to have fully
acquainted himself with the full nature of work,
10 1002.2 the location and character of the site and means
of access to the site including any traffic
restrictions imposed.
All tools and plants described and mentioned in
the various chapters shall be included either in
11 1002.3
the site installation costs or in the item rates. No
additional costs will be paid.
Infrastructure at bridge site, access roads,
12 1002.4 contractor's yard, construction site, laborers camp
and so forth.
All necessary accommodations like stores,
workshops, etc. required for proper execution of
works shall be provided, built, maintained and
13 1002.5 removed by the contractor at his own cost and
within the working time period. The following
points are important to be fulfilled:
a) all necessary safety measures and efforts to
14 avoid accidents and damages to the property.
b) sufficient labour camp with properly
15 maintained sanitary facilities, drinking water and
supply of electricity (if available).

c) proper waste management at site and labour


16 camp.
d) construction materials to be deposited and
17 stored well under shed.
e) a temporary drainage system at the site. The
contractor shall build no infrastructure without
prior approval by the client. The client shall
18 inspect the contractor's site infrastructure and
give instructions. These instructions are binding
and shall be strictly implemented by the
contractor.
f) The contractor shall make his own connections
19 for water and electricity supply and energy, if
any, and pay for it.

g) The Contractor cannot use the facilities like


20 telephone, fax, photocopies, etc. of the Client.
The contractor has to set up his own equipments.

Site Installation Page: 2 of 4


BoQ for Construction of Yudhiri Bailey Bridge

Type of Work: 1000 - Method of Measurement and Site Installation


Rate Amount
SN Code Description of item Unit Quantity
Nu. Nu.

h) After completion of the works, the contractor


shall clear away and remove from the site all
tools and plants, surplus materials, rubbish,
garbage, temporary constructions, and temporary
work of every kind and leave the whole site clean
21 and to satisfaction of the client. The site area of
the camp, storage area, access road and so forth
shall be rebuilt and brought into the same shape,
state and condition as before starting the work.
The contractor is not allowed to dispose anything
into the river.

i) Clearance of the site shall be done as per the


instructions of the client. Clearings may have to
be done during construction period and at the end
22
of the phased construction tasks. The final
clearance shall be done within 2 (two) weeks,
after the certificate of completion is issued.

23 1003 Material & protection


The contractor shall build sufficient stores, so
that all materials can be stored without being
24 1003.1 exposed to rain and hot sun. All the construction
materials, particulalry cement and steel have to
be put under proper shed.

25 1004 Tools and plant


The contractor shall supply and provide all
materials, plants, equipment, spare parts and
26 1004.1 whatsoever to execute the works in accordance
with the contract.
The contractor shall provide sufficient spare
parts and equipment to execute work without
delay. The tools, materials and plants shall be in
good working condition to erect all temporary
27 1004.2 structures and scaffolding at site. The client
reserves the right to stop on-going work in case
tools and plants are not meeting the requirement
and /or are in unsafe condition.

The mixing of concrete shall be done in a


28 1004.3 concrete mixer and shall be compacted using
mechanical concrete vibrators.

Site Installation Page: 3 of 4


BoQ for Construction of Yudhiri Bailey Bridge

Type of Work: 1000 - Method of Measurement and Site Installation


Rate Amount
SN Code Description of item Unit Quantity
Nu. Nu.

The contractor shall be required to carryout tests


on the materials like agregate, sand etc. that are
to be used for the bridge constrcution. Mix
design and trial mixes will have to be carried out
and tested prior to laying the concrete. Concrete
samples in form of cubes shall be taken from
different batches during the pouring of the
concrete and the cubes have to be tested for
strength. The contractor can either choose to
have the testing facilities set up at the
construction site or get the tests done from a
reputable laboratory. The contractor has to bear
the expenses for all the tests that are required for
building the bridge to the specifications
stipulated in the drawings, BoQ, technical
specification and other documents of the
contract.
29 1005 Various
It is understood that all the above costs are
included in the site installation . By signing the
contract, the contractor confirms that all efforts
and costs to fulfill the tasks listed above as a part
of site installation are included in the rates. The
mode of payment for the site installation shall be
as follows:-

a 80% after the site installation is complete


20% after the site is restored to its initial shape
b and condition or as per the instruction of
Client/site engineer

Total costs for complete site installation LS 1.00

Site Installation Page: 4 of 4


BoQ for Construction of Yudhiri Bailey Bridge

Type of works: 2000 Earth work

Rate Amount
SN Code Description of item Unit Quantity
Nu. Nu.
Excavation work
The contractor shall be deemed to have made
himself fully acquainted with the full nature &
30 2001 complexity of the work, the location and
character of the site and means of access to the
site.

The rates and work descriptions have to include


all activities and all costs necessary to complete
the work. The erecting, use and dismantling of
necessary working platforms, scaffolding and
related structures have to be included in the
rates. Construction of coffer dams, guide bunds,
sheet piles etc. if required for diversion of the
river in order to get the working space or to
control seepage during excavation shall also be
31 2002
included in the rates. The relevant drawings are
an integral part of these tender documents. The
contractor has to study all drawings in detail. By
submitting the tender, the contractor is
declaring that he has understood the drawings
and all the works involved and is prepared to
complete all construction work in a competent
manner. Only the highest degree of accuracy
and quality will be accepted.

Earthwork Page: 1 of 4
BoQ for Construction of Yudhiri Bailey Bridge

Type of works: 2000 Earth work

Rate Amount
SN Code Description of item Unit Quantity
Nu. Nu.

The Contractor confirms also to be fully aware


of the soil condition. He agrees not to ask for
additional payments due to changed soil
conditions.The word "soil" in this context refers
to all types of soil, earth, rock, stone, sand,
boulders, gneiss, clay, gravels, mica schist and
so on. In other words, the rate quoted for the
soil excavation shall apply for all the excavation
materials; soil, earth, rock - hard and/or soft,
requiring or not requiring blasting. Irrespective
of the type of excavation material, the
contractor shall be paid at the same rate - the
32 2003
rate quoted by the contractor for 'soil'
excavation. Therefore, while submitting the
rates, the contractor has to estimate the
proportion of various materials (soil, ordinary
rock, hard rock) in the excavation depending on
the site condition and quote accordingly. The
fact that some of the excavation works will be at
the river side, in the river and below the water
level will also not justify any increase in the
costs. It is important that the contractor does
careful study of the site condition prior to
submitting the tender.

The excavation shall be paid as Solid Volume.


Solid volume is the volume of excavation
calculated directly from the foundation
dimensions of the structure without
allowance for bulking, shrinkage, wastage,
working space, slope cutting etc. But the
33 2004 contractor has to be aware of the fact that the
soil cannot be dug vertically and that additional
excavations would be required for getting the
working space around the foundations, slope
cutting etc. and the contractor has to account for
these additional quantities while setting rates
for the excavation works.

Earthwork Page: 2 of 4
BoQ for Construction of Yudhiri Bailey Bridge

Type of works: 2000 Earth work

Rate Amount
SN Code Description of item Unit Quantity
Nu. Nu.
Excavation in ordinary/hard rock for
foundations of abutments . Here excavation
means soil and rock cutting up to the level
shown in the drawing. Controlled balsting
would be permitted. The volume of soil
excavation is calculated as solid volume as
per drawings but the contractor has to
consider the fact that it maynot be possible to
34 2005 m³ 1720.00
excavate the foundation vertically for deeper
foundations and should therefore keep
provisions for slope cutting, working space
etc. in the rates including dewatering by
bailing out or pumping out water. The
loading, offloading and transportation has to be
included in the rate. The quantity is for both
banks.
Rock anchoring works: The work involves
drilling of minimum 34 mm diameter drill
holes, placing of the reinforcement (as per
design) in the hole and packing it with rich
cement motar 1:1. The reinforcement has to be
placed centrally in the hole so that the cement
35 2006 m 303.88
motar fill the gap uniformly around the
reinforcement bar. The depth of the drill holes
are shown in the drawing. The reinforement
shall be paid seperately. All other efforts and
expenses required for completing the task shall
be included in the rates.

Backfilling around and behind the foundations,


abutments & return walls. Handling, loading,
offloading, transportation, watering and all
necessary works shall be included in the rate.
The back filling shall be done as per the
instruction of site engineer and in layers not
36 2007 m³ 1120.00
more than 300mm thick and compacted well
with earth rammer or compactor. The
Client's site engineer will strictly supervise this
to make sure that full compaction is achieved.
The quantity of backfilling is only upto the end
of abutments at both the banks.

Earthwork Page: 3 of 4
BoQ for Construction of Yudhiri Bailey Bridge

Type of works: 2000 Earth work

Rate Amount
SN Code Description of item Unit Quantity
Nu. Nu.
Providing and laying coarse gravel (filter
layer) behind the Abutments as per drawing.
Thickness d=60 cm for left abutment & d=50
cm for right abutment. The filter material to
37 2008 m³ 32.46
be used have to be approved by the client.
Handling, loading, offloading, transportation
and all necessary work shall be included in the
rate.

Providing and laying coarse gravel (filter


layer) behind the RC retaining wall as per
drawing. Thickness d=40 cm is provided. The
filter material to be used have to be approved by
38 2009 m³ 16.80
the client. Handling, loading, offloading,
transportation and all necessary work shall be
included in the rate. The quantity is only for one
RC retaining wall.

Total Cost 2: Earthwork

Earthwork Page: 4 of 4
BoQ for Construction of Yudhiri Bailey Bridge

Type of 3000. Reinforced Concrete, Plain Cement Concrete, Formworks and Other
works: Involved Works
Rate Amount
SN Code Description of item Unit Quantity
Nu. Nu.

The reinforced concrete works shall be carried


out strictly as per the stipulations in the
Technical Specification. The reinforced
concrete works may be under or above the
water level. The bidders have to study the site
condition and the design drawings carefully
and if necessary account for the dewatering
works using water pumps or any other means
including providing of temporary protection
39 3001
works such as coffer dam, sheet pile etc. to
divert the river and/or control seepage for
laying the concrete works under water. It is
understood that the bidders' price for the
concrete works include, besides others,
possible expenses for river diversion,
cofferdam/sheet pile/guide bunds, dewatering
works etc. The rates shall include all the
efforts required to fulfill the task.

Abutments

Providing & Laying of Lean Concrete 10 cm


thick in M10 underneath foundation slab as
shown in the drawing . The side of the lean
40 3002 concrete can be inclined upto 15 degress and m³ 4.90
therefore no formwork is necessary. The rate
has to include all works and materials to fulfill
the task including curing of the concrete.

Providing & Laying of Lean Concrete 10 cm


thick in M10 underneath foundation slab of
RC retaining wall, RRM wing wall and also
caping for RRM walls as shown in the
41 3003 drawing . The side of the lean concrete can be m³ 9.78
inclined upto 15 degress and therefore no
formwork is necessary. The rate has to
include all works and materials to fulfill the
task including curing of the concrete.

RC & other works Page: 1 of 4


BoQ for Construction of Yudhiri Bailey Bridge

Type of 3000. Reinforced Concrete, Plain Cement Concrete, Formworks and Other
works: Involved Works
Rate Amount
SN Code Description of item Unit Quantity
Nu. Nu.
Providing & laying of Reinforced Cement
Concrete M25, for foundation slab of the
abutments as per drawing and specification.
42 3004 All works and materials to complete the task m³ 41.40
including curing of the concrete has to be
included in the rate.Formwork and
reinforcement will be paid separately.

Providing & laying of Reinforced Cement


Concrete M25 for the abutment walls
(Stem) and dirt walls as per drawing and
specification. The surfaces may be vertical
43 3005 and/or inclined. All works and materials to m³ 74.94
complete the task including curing of the
concrete have to be included in the
rate.Formwork and reinforcement will be paid
separately.
Providing & laying of Reinforced Cement
Concrete M20, for foundation slab of the
RC retaining wall as per drawing and
specification. All works and materials to
44 3006 complete the task including curing of the m³ 13.30
concrete has to be included in the
rate.Formwork and reinforcement will be paid
separately. The quantity mentioned here is
only for one wall.
Providing & laying of Reinforced Cement
Concrete M20 for the vertical wall (stem) of
the RC retaining wall as per drawing and
specification. The surfaces may be vertical
and/or inclined. All works and materials to
45 3007 m³ 27.30
complete the task including curing of the
concrete have to be included in the
rate.Formwork and reinforcement will be paid
separately. The quantity mentioned here is
only for one wall.

RC & other works Page: 2 of 4


BoQ for Construction of Yudhiri Bailey Bridge

Type of 3000. Reinforced Concrete, Plain Cement Concrete, Formworks and Other
works: Involved Works
Rate Amount
SN Code Description of item Unit Quantity
Nu. Nu.

Proving and Fixing Formwork including all


temporary or permanent forms required for
forming the concrete of the shape, dimensions
and surface finish as shown in the drawings.
The rate shall include all props, staging,
centering, scaffolding and temporary
46 3008 construction required for their support to
provide the structure true to shape as shown on
the drawing and removal of the form work
after the time specified in the specifications or
as directed by the Engineer/Client. The
formwork shall impact a smooth and even
finish on the concrete surface.

Providing and fixing vertical formwork for the


47 3008.1 foundation slab of the abutments as shown in m² 35.40
the drawing.
Providing and fixing vertical form work for the
abutment wall (stem) up to the bearing level
48 3008.2 m² 169.08
of the bridge (all sides) and also all sides of
dirt walls.
Providing and fixing vertical formwork for the
foundation slab of the RC retaining wall as
49 3008.3 m² 10.80
shown in the drawing. The quantity is only for
one wall.
Providing and fixing vertical form work for the
vertical wall (stem) up to the bearing (all
50 3008.4 m² 91.85
sides) and all sides. The quantity is only for
one wall.

Reinforcement steel in accordance with


drawings, including cutting, bending, hooking
by machine/manual, tying in position
including GI binding wire, spacers, laps,
chairs, cover blocks, placing into formwok
and fixation, all complete. Reference will be
51 3009
made to the reinforcement list for calculating
the weight of the reinforcement for which the
contractor is eligible for payment. The
contractor will not be paid for any wastage.
The contractor has to consider and include
wastage into his pricing of the unit rates.

RC & other works Page: 3 of 4


BoQ for Construction of Yudhiri Bailey Bridge

Type of 3000. Reinforced Concrete, Plain Cement Concrete, Formworks and Other
works: Involved Works
Rate Amount
SN Code Description of item Unit Quantity
Nu. Nu.

Bend-up bars with hooks and any kind of


bends, Diameter 10 - 32 mm. All efforts and
52 3009.1 kg 10,744.93
costs to be included to fullfil the task. The
quantity is for Abutments & dirt walls.

Providing, laying & fixing of HDPE pipes for


weep holes as per drawings - diameter = 11cm,
53 3010 m 18.84
slope = 1 in 20. This quantity is for abutment
walls.

Providing and laying dry stone wall in G.I


wire mesh 4mm (8 SWG) - double knotted
mesh ….100mm, including supplying and
weaving of mesh complete. The gabion wall
has to to be built using flat and elongated
stones. River boulders are strictly not
54 3011 m³ 77.40
permitted to be used. The stones inside the
gabion wire mesh have to be built in form of
a dry wall so that the wall is stable on its
own even within the wire mesh. As
mentioned in the drawing, the quantity here
may change as per the requirment at the site.

Providing & laying of Random Rubble


Masonry (Including parapets) in CM 1:4 for
the wing walls. As mentioned in the drawing,
55 3012 the quantity of RRM wing wall may vary from m³ 305.65
what is given in this BoQ as per requirement at
the site. The rate should include the delivery of
boulders/stones.
Total cost 3: Plain & Reinforced Cement
Concrete, formworks and other works
involved

RC & other works Page: 4 of 4


BoQ for Construction of Yudhiri Bailey Bridge

Type of Works: 4000. Bailey Bridge and Other Involved Works


Rate Amount
SN Code Description of item Unit Quantity
(Nu) (Nu)

Transportation of Bailey bridge


superstructure (complete sets) from
56 4001 T 94.50
the Central Store, Regional Office,
DoR, Phuentsholing to the bridge site.

Launching of Bailey bridge with


57 4002 LS 1.00
following specification;
a Span: 180 feet
b Construction: DDR
c Deck type: Steel
Total Cost 4: Bailey Bridge & other involved works -

Bailey Bridge transportation Page: 1 of 1


BoQ for Construction of Yudhiri Bailey Bridge

Type of
5000.RCC wall along the river bank
works:
Rate Amount
SN Code Description of item Unit Quantity
Nu. Nu.
Excavation in foundation trenches for the
construction of RCC wall along the river bank,
including dressing and ramming, disposal of 3
58 5001 m 1800
surplus soil. The selected material for the
backfilling may stack along the bank- All
kinds of soil and rock.

The reinforced concrete works shall be carried


out strictly as per the stipulations in the
Technical Specification. The reinforced
concrete works may be under or above the
water level. The bidders have to study the site
condition and the design drawings carefully
and if necessary account for the dewatering
works using water pumps or any other means
including providing of temporary protection
59 5002
works such as coffer dam, sheet pile etc. to
divert the river and/or control seepage for
laying the concrete works under water. It is
understood that the bidders' price for the
concrete works include, besides others,
possible expenses for river diversion,
cofferdam/sheet pile/guide bunds, dewatering
works etc. The rates shall include all the
efforts required to fulfill the task.

Providing & Laying position the Plain


Cement concrete of M10 (1:3:6)-40mm
aggregate. The rate has to include all works
60 5003 m³ 45.00
and materials to fulfill the task including
curing of the concrete. The cost of centering
and shuttering will be paid separately

Providing & laying of Reinforced Cement


Concrete M25 (1:1:2 (1 cement : 1 sand : 2
graded crushed rock 20 mm nominal size))
as per drawing and specification. All works
61 5004 m³ 435.00
and materials to complete the task including
curing of the concrete has to be included in the
rate.Formwork and reinforcement will be paid
separately.

RCC Wall Page: 1 of 2


BoQ for Construction of Yudhiri Bailey Bridge

Type of
5000.RCC wall along the river bank
works:
Rate Amount
SN Code Description of item Unit Quantity
Nu. Nu.

Proving and Fixing Formwork including all


temporary or permanent forms required for
forming the concrete of the shape, dimensions
and surface finish as shown in the drawings.
The rate shall include all props, staging,
centering, scaffolding and temporary
62 5005 construction required for their support to
provide the structure true to shape as shown on
the drawing and removal of the form work
after the time specified in the specifications or
as directed by the Engineer/Client. The
formwork shall impact a smooth and even
finish on the concrete surface.

Providing & fixing centering and shuttering


(formwork) for PCC works as per the
63 5006 m² 15.80
specifications or as directed by the
Engineer/Client

Providing & fixing centering and shuttering


64 5007 (formwork) For RCC as per the specifications m² 986.80
or as directed by the Engineer/Client

Providing & fixing, Thermo Mechanically


Treated (TMT) bars for R.C.C work including
65 5008 kg 25,785.87
cutting, bending, binding and placing in
position complete

Providing,laying & fixing of HDPE pipes with


66 5009 m 45.61
weep holes-diameter 90mm, slope 1 in 20.

Providing and laying hand packed stone soling


67 5010 or filling with stones ( i.e filter materials m3 198.00
400mm)

Back filling in layers < 200 mm using selected


68 5011 m3 1,050.00
excavated earth, ramming etc-complete.

Total cost 5: RCC wall Along the River Bank

RCC Wall Page: 2 of 2


BoQ for Construction of Yudhiri Bailey Bridge

Type of
6000. Road, Gabion wall & Drain
works:
Rate Amount
SN Code Description of item Unit Quantity
Nu. Nu.
Excavation of road formation/trace/box
cutting, with excavator including separate
69 6001 m3 600
deposition of soil, rocks and stones within
50m: All types of soil
Excavation of road formation/trace/box
cutting, with excavator including separate
70 6002 m3 500.00
deposition of soil, rocks and stones within
50m: All types of rock

Construction of Gabion wall as per drawings,


including excavation of foundations in all
71 6003 types of soils, sides and backfilling, delivery m 30.00
of materials, providing of geo textile at the
back face etc. Complete: Height up to 3.0m

Construction of lined drain as per the standard


design drawing provided in the drawing
72 6004 section including excavation, leveling, m 100.00
formwork, curing, backfilling and disposal of
surplus excavated earth within 50 m lead.
Total cost 6 : Road, gabion & Drain

App. road Page: 1 of 1

You might also like