1. GENERAL
1.1 Scope
1.2 Clarifications and Questions
1.3 The Seller's Sub-contractors
1.4 Material supplied by the Buyer
1.5 Change of specifications
1.6 Warranties
1.7 Confidentiality
1.8 Validity of the Goods
2. PROPOSAL
2.1 Bid documents and information required at bidding stage
2.2 Submission of documents after award of contract
3. DESIGN CONDITIONS
3.1 Applicable codes and standards
3.2 Site climate conditions and utilities conditions
4. DOCUMENTS
4.1 Formats of documents
4.2 Language to be used in documents
4.3 Identification of Documents
4.4 Documents after award of contract for approval
4.5 As-Built Documents
7. PAINTING
6488M-MM10-HXZ-OF-70Z300L2 2
CONTENTS
6488M-MM10-HXZ-OF-70Z300L2 3
INDIVIDUAL PURCHASING SPECIFICATION
1 GENERAL
1.1 Scope
This specification covers the general requirements for the bid including basic design
conditions, issue and approval of documents, manufacturing, inspection, and transportation of
the Goods. The Appendix and Annexes attached hereto form an integral part of this
specification.
(5) Annexes 2, 3 and 7 are attached to this Individual Purchasing Specification at bidding stage,
but will be moved to be a part of the Special Terms and Conditions for Purchasing at Contract
stage either as they are or as revised based on the clarifications made before Contract. The
Contents page of the Special Terms and Conditions for Purchasing shows where Annexes 2, 3
and 7 will be positioned.
6488M-MM10-HXZ-OF-70Z300L2 4
1.2 Clarifications and Questions
The Seller shall comply with the requirements contained in the Instruction to Bidders paragraph
7.11 and the following requirements.
If there are any discrepancies, within or between this specification, the relevant specifications
or documents, the Seller shall notify the Buyer of such discrepancies in writing and shall not
commence manufacturing before receiving clarification from the Buyer. The Buyer will apply
the order of precedence as specified in Annex 2.
Unless otherwise questioned by the Seller, the contents of this specification and all the related
documents shall be considered entirely understood and complied by the Seller.
1.6 Warranties
Refer to THE GENERAL TERMS AND CONDITIONS FOR PURCHASING Clause 15.
1.7 Confidentiality
The Seller shall comply with requirements contained in THE GENERAL TERMS AND
CONDITIONS FOR PURCHASING Clause 25.
6488M-MM10-HXZ-OF-70Z300L2 5
2 PROPOSAL
3 DESIGN CONDITIONS
The Goods shall be designed to comply with the following general conditions.
4 DOCUMENTS
Project Name
The Owner’s Name
The Buyer’s Purchase Order Number: Indicated in the TECHNICAL SPECIFICATION
Material Name (Description) and Tag No.: Indicated in the TECHNICAL SPECIFICATION
6488M-MM10-HXZ-OF-70Z300L2 6
4.4 Documents after award of contract for approval
Documents issued for approval shall be submitted as specified in Annex 3.
(A) Proceed
(B) Proceed as noted, change as noted and resubmit as AS-BUILT
(C) Proceed as noted, change as noted and resubmit
(D) Do not proceed, change as noted and resubmit
(E) Received for Information Only
(Q) Rejected. Not suitable for review. Revise and re-submit for Comment/Review
(2) In case APPROVAL DOCUMENT is returned with comments with status (C), (D) or (Q), the
Seller shall submit revised approval documents within 7 days after their receipt of the
document returned. Revised parts shall be clearly marked.
(3) Notification to proceed does not constitute acceptance nor relieve Contractor/Seller of any
liability. Acceptance is only accomplished under the Terms of the Contract/Purchase Order.
(2) Minutes of Meetings (M.O.M.) shall be prepared by the Seller and submitted in 3 (three) copies
within 1(one) week after the meeting or by the date specified by the Buyer.
(3) The Buyer will review the M.O.M. If the M.O.M. are correct, then the attendee(s) at the meeting
shall sign one copy of the M.O.M. and return them to the Seller.
(4) If the Seller does not prepare the M.O.M. as described herein, then the Buyer’s understanding
of the discussed matters shall prevail.
(5) If so requested by the Buyer, the Seller shall attend a Kick-Off Meeting to be held at the Buyer’
s office soon after the award of the Contract.
6488M-MM10-HXZ-OF-70Z300L2 7
7 PAINTING
For details of painting, refer to "Engineering Specification for Painting" in Annex 2.
Painting finishing and color can be the Seller’s standard as far as it meets the above
requirements unless specified otherwise.
6488M-MM10-HXZ-OF-70Z300L2 8
10.1 Special Requirements
(4) Unit
All units of measurement shall be in accordance with "Basic Enginnering Design Data (BEDD)".
6488M-MM10-HXZ-OF-70Z300L2 9
10.1 Special Requirements
For multiple-unit installations, the requirements for quantities of special tools and fixtures shall be
mutually agreed upon prior to the contract. The same or similar special tools shall be used during
shop assembly and post-test disassembly of the equipment to verify their practical effectiveness. A
complete list of special tools shall be submitted in the proposal. Each special tool shall be stamped
or tagged to indicate its intended use according to Shipping Instructions listed in Annex 2.
The Seller shall clearly specify in "Special Tools List" for what purpose (for installation / for pre-
commissioning/commissioning / for commercial operation / for maintenance) each special tool will
be used.
Moreover levers and eyebolts for the removal of parts to be serviced shall be included in the
Seller's scope of supply. Certificate for any lifting tools shall be submitted with special tools.
6488M-MM10-HXZ-OF-70Z300L2 10
10.1 Special Requirements
The Seller shall provide pressure-reducing devices such as regulators or orifice plates, if it is
necessary to reduce pressure.
6488M-MM10-HXZ-OF-70Z300L2 11
10.1 Special Requirements
(16) Piping
Unless otherwise specified, the Seller should provide all piping works such as engineering, material
supply, fabrication and pre-fabrication at shop within Battery Limit.
6488M-MM10-HXZ-OF-70Z300L2 12
10.1 Special Requirements
(16-4) When the pipe flanges at tie-in points between the Seller and the Buyer cannot be applied to the
codes and standards specified in Annex 2B due to manufacturing reasons, the Seller shall provide
following spare parts for construction and commissioning;
- Mating flanges: 100%
- Bolts / nuts: 10%
- Gasket; 200%
The detailed dimensions of flanges more than 26" shall be drawn in the general arrangement
drawings.
(16-5) Interconnecting piping larger than 2 inchs and including shall be fabricated and/or pre-fabricated at
the Seller's shop before shipment. The piping below 1-1/2 inch can be shipped as bulk.
(16-6) Unless otherwise specified, the Seller shall provide any piping supports within battery limit. Piping
support should have enough stifness in order to avoid any abnormal vibration during operation.
(16-7) If the Seller supply the piping with NPT thread, minimum SCH-160 shall be applied to the piping to
preventt the damage from external stress such as vibration and so on.
(17) Nameplate
All equipment, instruments and valves shall be provided with nameplates indicating the item
number and service name shown in the equipment list. Nameplates shall be made of stainless
steel plate and placed at in an easily visible location befofe shipment. Nameplate shall have
enough information, which will be confirmed at engineering stage.
The Buyer's standard name plate form, if specified, shall be followed.
6488M-MM10-HXZ-OF-70Z300L2 13
10.1 Special Requirements
(22) If any export packing will be shipped with the drop impact indicator, the followings should be
considered.
- It should be shown clearly how to handle packing in the Instruction Manual, Packing List.
- Drop impact indicator shall be easily visible from outside of package.
- Visible warning labels shall be attached to each package.
- When the packing is handed over to the Buyer, the Seller shall submit records that there is no
sign of a drop impact indicator with the Buyer's confirmation and signature.
6488M-MM10-HXZ-OF-70Z300L2 14
10.1 Special Requirements
(23-1) Full responsibility for design integration, inspection and test, installation/start up supervision,
proper function, performance of equipment and auxiliaries.
(23-2) Engineering analysis of complete driven equipment / gear / driver including lateral / torsional
vibration, structural resonance vibration and train performance, if specified by the Buyer and/or
related codes and standards.
(23-3) Engineering coordination of the interface between driven equipment and driver including the lube /
seal / control oil system, the couplings and guards, control and protection system, connecting
piping, wiring, and solution of problems in those items, if any.
(23-4) Submitting of train drawings between driven equipment and driver such as general arrangement,
foundation, piping arrangement, electrical, instrumentation and so on.
Even if the drivers are provided by the Buyer, the Seller of driven equipment (such as pumps,
compressors, blowers/fans and etc.) shall submit the combined interface drawings such as general
arrangement, foundation drawings, piping arrangement drawings and so on incorporated with
information of drivers.
(23-5) Coordination of the Buyer's representative attendance at Seller's shop inspections and tests.
(23-6) Arranging and coordination of the meetings between the Buyer's representative and the Seller,
when requested.
(23-7) Administration of manufacturing schedule and progress report including sub-order equipment to
the Buyer/Owner .
(23-8) The Seller shall have JOINT RESPONSIBILITY with it's sub-vendors and directly get in touch with
each other to exchange information related to the followings, but not limited to;
6488M-MM10-HXZ-OF-70Z300L2 15
10.1 Special Requirements
6488M-MM10-HXZ-OF-70Z300L2 16
10.1 Special Requirements
(33) 3D Model
The Seller shall provide any information for the Buyer's 3D model plant design.
(1) 3D Model Data Format
Editable 3D model Data of SP3D, PDS or PDMS is preferred form.
(Prefer) SP3D: VUE or MDB2 or ZVF or XML / PDS : DGN or DRV / PDMS : RVM
(Alt Case) AutoCAD (3D) : DWG / Microstation : DGN
(2) 3D Model Data Submission Schedule
3D data shall be provided with General arrangement drawing by the Seller.
(34) In case electrical bonding is required for piping, the Seller shall provide the clips, wires, bolts, nuts
and washers.
(35) Packing lists submitted by the Seller shall indicate individually all items in the Seller's scope of
supply including loose-supply items like anchor bolts/nuts, insulation materials, field instruments to
be installed at the site.
The Buyer recognizes that the Seller fails to supply the items in case that they are required to be
supplied by the Seller but are not identified in the approved packing lists. In such a case, the Seller
shall arrange, at the Seller's expense, the shipment of these items to Buyer's designated place
according to the Buyer's instructions immediately.
(36) The Seller shall study locations for operator access during operation and maintenance such as
local gauge board, valve handles, instruments, couplings/belts, motors, grease nipples, terminal
boxes, etc. Minimum required space to access such locations shall be kept in skid.
(37) The Seller shall submit expected terms of field activity and number of required supervisor in the
proposal. The field engineering activity like unpacking, installation, precommissioning shall be listed
in the proposal in case the Seller's supervior presence is requseted to apply the warranty of the
equipment.
(38) Drainage
(Blank)
6488M-MM10-HXZ-OF-70Z300L2 17
10.1 Special Requirements
(41) In addition to chemicals required for pre-commissioning and initial operation, the Seller shall also
supply required amount of consumables, if they are expected to deteriorate, to maintain the
successful operation for 1 year after the commercial operation starts. They include, but not limited
to, resins for water treatment facilities, carbon for activated carbon filter, filter media for sand filters,
adsorbent and dessicant.
[Owner's Tech. Spec. 11.4.2]
(42) If the Buyer's individual data sheet specifies not to use Fluoroelastomer such as Viton for parts
contacting with the process fluid, durable material such as Fluoro-ethylene-propylene
(FEPM/AFLAS), Perfluoroelastomer (FFKM/Kalrez) or other material recommended by the Seller,
which shall have proven experiences to the same service, shall be used. The Seller's
recommended material shall be proposed with reasons and proven experience records, and is
subject to the Buyer's approval.
6488M-MM10-HXZ-OF-70Z300L2 18
10.2 Special Requirement for Rotating Machine
(3) Driver
(3-1) Coupling Half
The Seller of driven equipment shall provide the coupling hubs of drivers.
In case driver is delivered to the Seller's shop by the Buyer, the Seller shall machine internal bore
of coupling hubs with the final dimension to meet the driver's requirement and mount coupling hubs
on driver's shaft.
In case driver is not delivered to the Seller's shop, the Seller shall deliver coupling hubs with final
machining allowance to driver manufacturer's shop until the driver vendor's required date by the
Seller's expense.
(3-2) Delivered Condition of Driver
If the large size driver is supplied by the Buyer, driver will be disassembled at the driver
manufacturer's shop in order to comply with any transportation restrictions-.
After delivery to the Seller's shop, the driver shall be reassembled at the Seller's shop with the
driver manufacturer's supervisor(s).
In such a case, the Seller shall provide skillful workmanship and shop facilities like overhead
cranes.
(3-3) Shim
The Seller shall provide the shim plate for leveling of driver and driven equipment.
(4-2) The Seller shall inform the allowable vibration limit of the foundation in order to prevent any harmful
effects to the rotating machines. It shall be indicated in Foundation Drawing and/or General
Arrangement Drawing.
(4-3) If the driver / driven equipment train is in the resonance condition or any vibration problems occurs,
the Seller shall solve any problems in a timely manner.
6488M-MM10-HXZ-OF-70Z300L2 19
10.2 Special Requirement for Rotating Machine
(4-4) The Seller shall specify the allowable limit for the vibration level in the inspection procedure at
shop, even if the Buyer's specification and/or relative codes and standards do not specify the
allowable vibration limit. The Seller should demonstrate during running tests that the maximum
vibration of the machine does not exceed the permissible limits.
The Seller shall also specify the allowable limit for the vibration level at site in Instruction manual.
(4-5) Vibration and Noise limitation which are specified in the specifications shall be confirmed at the
initial shop test. Even if satisfied at shop, the Seller shall also be responsible for fulfilling the
requirement at the site.
(4-6) The Seller shall have full responsibility for vibration control of the driver / driven equipment train at
the site and the units satisfactory performance, even if the foundation and drivers are provided by
the Buyer.
6488M-MM10-HXZ-OF-70Z300L2 20
10.3 Specific Job Requirement
(1) Unless otherwise approval by Buyer, Equipment supplied by Seller shall be qualified by experience
to manufacture the units proposed. To qualify, Seller must have manufactured (at the proposed
point of manufacture) at least two units of comparable power, speed, output, and design(s) which
have been operating satisfactorily for at least 2 year each.
[Owner's Tech. Spec. 4.6.1.10]
(2) The produced film roll is used by the bag making machine that is installed next to blown film
machine. The film roll is cut and bottom sealed by the bag making machine, and the produced bag
is used as inner bag for fertilizer.
Outer bags to be provided by the Owner shall be of jute or woven polypropylene and inner bag is
inserted into an outer bag by operator.
(3) The produced film roll is carried by lifter(hand driving) from blown film extrusion machine to bag
making machine.
(4) The seller shall inform the utility information(amount, pressure, temperature).
(5) The seller shall select the machine size within the layout which including in Process Data Sheet.
(6) Closed water circuit with demineralized water(pre-treated water) or potable water shall be used as
cooling water. The seller shall confirm the availability of both water for machine.(We will choose
either of them later. )
6488M-MM10-HXZ-OF-70Z300L2 21
10.3 Specific Job Requirement
(7) If the seller has the requirements to cooling water, for example additives etc, the seller shall inform
the Buyer.
(8) The air cooled chiller and connection pipe between machine and chiller to cool down the cooling
water shall be proposed as OPTION.
(9) The seller shall inform the minimum length of bag bottom skirt.(Refer to Process Data Sheet.)
(10) If the seller has the requirements to film roll, the seller shall inform the Buyer.
(11) The seller shall inform the required time to consume one film roll.
6488M-MM10-HXZ-OF-70Z300L2 22
Appendix 1 SCOPE OF WORKS
10 PROJECT INFORMATION
11 Project name Ghorasal Polash Urea Fertilizer Project (GPUFP)
12 Plant name 1600 MTPD Ammonia, 2800 MTPD Granular Urea
13 The Owner Bangladesh Chemical Industries Corporation
14 Site address Polash, Narsingdi, Bangladesh
15
20 DELIVERY
Delivery Conditions Applicable
21 Time day/month/year
22 Place name of place Export Port
23 Trade terms FOB YES
24
Items partially delivered Trade terms Delivery time Delivery place
Partially
delivery
required
Notes
24 If partial delivery is required, the Buyer to inform the Seller of the items, time and destination of the delivery in due date after the
contract.
6488M-MM10-HXZ-OF-70Z300L2 23
Appendix 1 Equipment List for Bag making machine
Codes and
Equip. No. Service No. Req’d Remarks
Standards
6488M-MM10-HXZ-OF-70Z300L2 24
Appendix 1 Detailed Scope of Supply
1. Engineering
1.1 Design of equipment R
1.2 Review of Buyer's Piping/Configuration Design R
1.3 Review of Buyer's Instrument Design R
1.4 Review of Buyer's Electrical Design R
1.5 Review of Buyer's Civil Design R
1.6 Design of trip, alarm and interlock logic R
1.7 Design of Support Plan for Piping R
1.8 Design of Instrumentation R
1.9 Design of electrical R
1.10 Maintenance plan R
1.11 Operation & Maintenance stage plan R
2. Equipment
2.1 Bag making machine R
2.2 Air cooled chiller OP If required.
2.3 Cooling water pump OP If required.
3. Piping
3.1 All Piping & Piping Parts within skid R
3.2 All Piping Support within skid R
3.3 Interconnecting piping between machine and chiller OP If required.
3.4 Interconnecting piping support between machine and chiller OP If required.
4. Instrumentation
4.1 Wiring, tubing and terminal box within skid R
4.2 Locally mounted instruments within skid R
4.3 Wiring, tubing between skid and local panel R
(Material supply)
4.4 Loose supplied instruments and tubing & fitting etc. R
4.5 Local Gauge Board R
4.6 Local Control Panel R
4.7 Alarm Lamps, Push Buttons and Buzzers R
4.8 Interlock & Control Logic by R
( ) Relay ( ) Solid State
(R) PLC ( ) Sequencer
4.9.1 Local Panel Mounted Instruments R For Operation Control & Monitoring
6488M-MM10-HXZ-OF-70Z300L2 25
R: Scope of Supply by Seller, NR: Not Required, NA: Not Applicable,
OP: Option (Separate Quotation Required), BD: Breakdown
Seller's
NO. ITEMS REQ'D REMARKS Confirmation
rev.
4.9.2 PLC R ( ) Single PLC
Note: PLC shall be connected to DCS/ESDS for operation and (R) Redundant PLC
control (R) Redundant I/O Module
(R) Power Supply Module
(R) Serial Link Module
( ) TMR PLC
4.10 Terminal Boxes within Skid R Terminal Boxes to be divided/distiguished
as follows
・Terminal Box for ESD Signal
・Terminal Box for DCS Signal
・Terminal Box for Analog Signal
・Terminal Box for Digital Signal
・Terminal Box for Flame Proof (Ex-d)
・Terminal Box for Intrinsically Safe (Ex-i)
5. Electrical
5.1 Main equipment Motors R
5.2 Auxiliary equipment motors R
5.3 Earth Lug for all equipments R
5.4 Cable-gland for Terminal Box of Motor R
5.5 Local Control Station R
5.6 Local Power Circuit Braker R
5.7 Junction Box / Terminal Box R
5.8 Electrical Panel in Electrical Room NA
5.9 Cable with Conduit or Tray within skid R
5.10 Loose supply Cable with Conduit or Tray out of skid R
5.11 Lighting Equipment R
5.12 Distribution Panel R for Electrical Power Supply Distribution
inside Skid, where required
5.13 Control Cable and Power Cable within Skid R
5.14 Conduit, Duct, and Rack within Skid R
6. Civil NA
7. Mounting
7.1 Baseplate for all equipment R
7.2 Adjusting and Leveling jackscrew for Alignment R
7.3 Foundation Bolts (Setting Bolts or Anchor Bolts) & Double Nuts R
with Washers (Plane and Taper) for ALL equipment
7.4 Fixing bolt set for piping supports R
7.5 Alignment Shims R Stainless Steel
7.6 Sole Plate R
7.7 Template R If required
7.8 Embeded Materials R If required
7.9 Sub-structure materials NR
7.10 Vibration isolator R If required
8. Miscellaneous
8.1 Nameplate for all equipment and motor R Stainless Steel
Unless otherwise requested, language
specified shall be applied
8.2 Tag plate for all instrument R Stainless Steel
Unless otherwise requested, language
specified shall be applied
8.3 Coupling connection (V-belt, Chain etc. between driver and driven R
equipment)
6488M-MM10-HXZ-OF-70Z300L2 26
R: Scope of Supply by Seller, NR: Not Required, NA: Not Applicable,
OP: Option (Separate Quotation Required), BD: Breakdown
Seller's
NO. ITEMS REQ'D REMARKS Confirmation
rev.
8.4 Guard for Coupling, V-belt, Chain etc. between driver and driven R Non-spark Material
equipment
8.5 Acoustic enclosure or Noise mastic R If over 90dB at one m from source
8.6 Insulation (Hot / Cold / Personal Protection) R If required
8.7 Lifting Lug for motor and each equipments R
8.8 Spreader Beam for Installation R If required
8.9 Initial Charged Oil or Grease NR
9. Painting
9.1 Under Coats, Intermediate Coats, and Finish Coats R Per applicable painting specification
(R) Finish Coats for Equipment (Rotating, Static, Steel Structure)
(R) Under Coats for Steel Structure except Galvanized Steel
1. PLC programming tool shall be completed in all respects with required accessories. If a dedicated PC or programming
terminal is required for the system, it shall be provided.
2. User's manual, maintenance manual, programming manual, the programming tool, spare parts catalogue etc. for the
system shall be provided.
13. Packing
13.1 Domestic Packing NA Domestic country same as site country
13.2 Export Seaworthy Packing R
13.3 Rust Prevention for Long Term Storage R Min. 1 year
6488M-MM10-HXZ-OF-70Z300L2 27
R: Scope of Supply by Seller, NR: Not Required, NA: Not Applicable,
OP: Option (Separate Quotation Required), BD: Breakdown
Seller's
NO. ITEMS REQ'D REMARKS Confirmation
rev.
14. Supervisor
14.1 Supervisor for site installation work OP
14.2 Supervisor for commissioning and test operation at site OP
14.3 Training at Seller's shop OP
14.4 Training at Site OP
14.5 Rates for service engineers with visits outside the warranty period OP
6488M-MM10-HXZ-OF-70Z300L2 28
Annex 2 The specification and other contractual documen
CONTENTS
Annex 2A Relative Documents
Annex 2B Codes and Standards
Order of Precedence.
1. Purchase Order
2. CONTRACTUAL PREVAILING TECHNICAL REQUIREMENTS (Annex 2A-00)
3. The TECHNICAL SPECIFICATIONS (Annex 2A-10)
4. PROJECT SPECIFICATIONS (Annex 2A-20)
5. CODES AND STANDARDS (Annex 2A-30)
6. INSTRUCTIONS (Annex 2A-40)
7. The Seller's Proposal
6488M-MM10-HXZ-OF-70Z300L2 29
Annex 2A Relative Documents
10 TECHNICAL SPECIFICATIONS
Name of specifications Documents No. Rev. Remarks
11 Individual Purchasing Specification 6488M- MM10-HXZ-OF-70Z300L2 Rev.A Sent
13 Process Data Sheet for Polyethylene Bag Manufacturing Plant 6488M- B720-HXZ-OF-70Z300 Rev.A Sent
14 Engineering Standard for Machinery 6488M- M311-000-00-00100 Rev.A Sent
15
20 PROJECT SPECIFICATIONS
Name of specification Documents No. Rev. Remarks
200 Instructions to Bidders 6488M- J671-000-00-00100 Rev.A Sent
201 Order Procedure for 2 Year Spare Parts (for Vendor) 6488M- J116-000-00-00101 Rev.A Sent
202
210 General Specification for Inspection 6488M- A440-000-00-00100 Rev.0 Sent
211 Inspection Specification for Positive Material Identification (PMI) 6488M- A440-000-00-00200 Rev.0 Sent
212
220 Basic Engineering Design Data (BEDD) 6488M- B313-S00-00-00010 Rev.A Sent
221
230 Electrical Engineering Standard 6488M- E311-000-00-00100 Rev.A Sent
231 Specification for Motor 6488M- E520-E31-00-00100 Rev.A Sent
232 Specification for LV Variable Speed Drive System 6488M- E520-E33-00-10200 Rev.A Sent
240 Engineering Standard for Instrumentation 6488M- K311-000-00-00100 Rev.A Sent
241 Engineering Standard for Instrumentation for Package Unit 6488M- K340-000-00-00100 Rev.A Sent
242 Sample Drawings for Instrumentation for Package Unit 6488M- K340-000-00-00200 Rev.A Sent
243 Inspection Requirement for Instrumentation for Package Unit 6488M- K340-000-00-00300 Rev.A Sent
244 General Specification for Control System Cabinet 6488M- K580-K20-00-00010 Rev.A Sent
250 Specification for Seller's Documents and Drawings 6488M- M311-000-00-00200 Rev.A Sent
251 Standard Drawing for Instrument Installation 6488M- K710-000-00-00100 Rev.A Sent
260 Piping Engineering Specification 6488M- P311-000-00-00100 Rev.B Sent
261 Piping Material Specification 6488M- P320-000-00-00100 Rev.B Sent
262 Standard Drawing for Piping 6488M- P341-000-00-00100 Rev.A Sent
263 Identification Specification for Piping Material 6488M- P330-000-00-00100 Rev.0 Sent
270 Engineering Specification for Hot Insulation 6488M- S640-000-00-00100 Rev.C Sent
271 Engineering Specification for Cold Insulation 6488M- S640-000-00-00200 Rev.B Sent
272 Engineering Specification for Painting 6488M- S650-000-00-00100 Rev.B Sent
273 Rust Prevention Specification 6488M- S650-000-00-00200 Rev.A Sent
40 INSTRUCTIONS
Name of instructions Documents No. Rev. Remarks
41 Monthly Progress Report Procedure (from vendor) 6488M- J676-000-00-001 Rev.B Sent
42 General Shipping Instruction 6488M- T431-000-00-00100 Rev.B Sent
43 Special Shipping Instruction for FCA/FOB Terms 6488M- T434-000-00-00100 Rev.A Sent
44 Special Shipping Instruction for CFR/CPT/CIF/CIP Terms 6488M- Later
45 Special Shipping Instruction for DDU/DDP Terms 6488M- Later
46 Special Shipping Instruction for Air Shipment 6488M- Later
47 Special Shipping Instruction for Courier Shipment 6488M- Later
48 Special Shipping Instruction for Local Shipment 6488M- Later
49 Special Shipping Instruction for Document Preparation 6488M- T439-000-00-00100 Rev.B Sent
49 Special Shipping Instruction for Document Preparation 6488M- T439-000-00-00100 Rev.A Sent
6488M-MM10-HXZ-OF-70Z300L2 30
line Annex 2B Codes and Standards
6488M-MM10-HXZ-OF-70Z300L2 31
line Annex 2B Codes and Standards
6488M-MM10-HXZ-OF-70Z300L2 32
line Annex 2B Codes and Standards
6488M-MM10-HXZ-OF-70Z300L2 33
line Annex 2B Codes and Standards
6488M-MM10-HXZ-OF-70Z300L2 34
line Annex 2B Codes and Standards
6488M-MM10-HXZ-OF-70Z300L2 35
Annex 3 DOCUMENTS TO BE SUBMITTED TO BUYER
Required documents to be prepared and supplied by Seller in E: English, S: Spanish, F:French, C:Chinese, J: Japanese Seller's document Issuance limit after
Documents (X) to be submitted at proposal stage and number of proposals, hard copies(C) contract
As-Built
Documents (X) to be submitted after contract and number of hard copies (C) & electric file(E). Notes
(Indicative (Seller (Confirme (Liquidated Drawing
Documents (A) to be submitted as APPROVAL DOCUMENTS.
) promised ) d) Damages)
Documents (I) to be submitted as INFORMATION DOCUMENTS.
a b c d Document name e f g h i j
A-4 Electrical
4-1) E X 2C+1E Motor Data Sheet / Generator Data Sheet (Seller standard format can be used.)
A-6 Transportation
6-1) E X 2C+1E Bulk Cargo Drawing with Packing Dimension
6-2) E X 2C+1E Proforma Packing List
6488M-MM10-HXZ-OF-70Z300L2 36
Annex 3 DOCUMENTS TO BE SUBMITTED TO BUYER
Required documents to be prepared and supplied by Seller in E: English, S: Spanish, F:French, C:Chinese, J: Japanese Seller's document Issuance limit after
Documents (X) to be submitted at proposal stage and number of proposals, hard copies(C) contract
As-Built
Documents (X) to be submitted after contract and number of hard copies (C) & electric file(E). Notes
(Indicative (Seller (Confirme (Liquidated Drawing
Documents (A) to be submitted as APPROVAL DOCUMENTS.
) promised ) d) Damages)
Documents (I) to be submitted as INFORMATION DOCUMENTS.
a b c d Document name e f g h i j
B-7 Piping
7-1) E X 2C+1E A Piping Specification 8W X
7-2) E X 2C+1E A Piping Assembly Drawing 12W X
7-3) E X 2C+1E A Safety Valve, Relief Valve & Rupture Disc 24W X
7-4) E X 2C+1E A Piping ISOMETRIC Drawing 20W X
7-5) E X 2C+1E A Piping Support Drawing and Support List 20W X
B-8 Instrumentation
8-1) E X 2C+1E A Instrument Index & Set Point List 8W *3, 5 X
8-2) E X 2C+1E A Control System Configuration 6W X
8-3) E X 2C+1E A Logic Description / Flow Chart 16W X X
8-4) E X 2C+1E A Interlock / Sequence Logic Diagram 16W X X
8-5) E X 2C+1E A Complex Control Loop Diagram 16W X X
8-6) E X 2C+1E A Panel and Junction Box Detail Drawing including specification, arrangement, 20W X
internal terminal layout, wiring/piping/tubing & parts list
8-7) E X 2C+1E I Software Document (ladder, program code & parameter and communication 2W after X
I/O w/address etc) Final
Inspection
8-8) E X 2C+1E A Detail Instrument Specification, Drawing and Calculation 20W X
8-9) E X 2C+1E A Instrument Terminal & Wiring Drawing 20W X
8-10) E X 2C+1E A Hook-up Drawing (Electrical Signal, Pneumatic Signal and Pressure Lead Piping) 24W X
6488M-MM10-HXZ-OF-70Z300L2 37
Annex 3 DOCUMENTS TO BE SUBMITTED TO BUYER
Required documents to be prepared and supplied by Seller in E: English, S: Spanish, F:French, C:Chinese, J: Japanese Seller's document Issuance limit after
Documents (X) to be submitted at proposal stage and number of proposals, hard copies(C) contract
As-Built
Documents (X) to be submitted after contract and number of hard copies (C) & electric file(E). Notes
(Indicative (Seller (Confirme (Liquidated Drawing
Documents (A) to be submitted as APPROVAL DOCUMENTS.
) promised ) d) Damages)
Documents (I) to be submitted as INFORMATION DOCUMENTS.
a b c d Document name e f g h i j
B-9 Electrical
9-1) E X 2C+1E A Motor Data Sheet / Generator Data Sheet (Seller standard format can be used.) 10W X *3 X
9-2) E X 2C+1E A Detail Panel Drawing Inc. specification, arrangement, wiring & parts List 20W X
9-3) E X 2C+1E A Electrical Equipment / Motor Drawing including Junction box and terminal drawing 20W X X
B-11 Transportation
11-1) E X 2C+1E A Export Packing Specification 16W
11-2) E X 2C+1E A Bulk Cargo Drawing with Packing Dimension 8W
11-3) E X 2C+1E I Final Proforma Packing List (For firm booking) 30D ahead *3, 5 X
Shipment
11-4) E X 2C+1E A Packing List 60D ahead X *3
Shipment
11-5) E X 2C+1E I Declaration of Dangerous Goods & Material Safety Data Sheet 90D ahead
Shipment
11-6) E X 2C+1E I Certificate of Origin & Final Packing List with Summary sheet 5D ahead
Shipment
NOTES
b Copies and/or electronic file as marked as X shall be furnished with Bidder’s quotation.
c Copies and/or electronic files as marked as X shall be furnished after contract.
*4 The Manuals
Seller is requested to submit two (2) hard copy and one (1) electronic file for Buyer’s approval at first.
After following Buyer’s comments, ten (10) number of hard copies for the revised documents/drawings should be submitted.
*5 Electronic file
Seller is requested to submit the documents by electronic (Excel, Word or AUTO CAD) file, in addition to the required number of hard copies.
6488M-MM10-HXZ-OF-70Z300L2 38
Annex 3 DOCUMENTS TO BE SUBMITTED TO BUYER
Required documents to be prepared and supplied by Seller in E: English, S: Spanish, F:French, C:Chinese, J: Japanese Seller's document Issuance limit after
Documents (X) to be submitted at proposal stage and number of proposals, hard copies(C) contract
As-Built
Documents (X) to be submitted after contract and number of hard copies (C) & electric file(E). Notes
(Indicative (Seller (Confirme (Liquidated Drawing
Documents (A) to be submitted as APPROVAL DOCUMENTS.
) promised ) d) Damages)
Documents (I) to be submitted as INFORMATION DOCUMENTS.
a b c d Document name e f g h i j
j As-Built drawing with 1 copy and electronic file as marked as X shall be furnished within 2 weeks after shipment.
Electronic file shall be submitted by CD, which store the Excel, Word and/or Searchable PDF files depending upon the Buyer's document number.
A4, A3 & A2 : Acceptable and Preferable
A1 : Acceptable, but the reduced A2 size drawing shall be submitted if it is legible. Otherwise the A1 size shall not be applied.
A0 : Not Acceptable
1-1) The price list dividing into the items specified in Appendix 1 shall be submitted.
1-6) List of past supply for the same Owner, country, plant and same or similar model/type with specifications to be submitted.
1-7) Manufacturing place of equipment, service contents, service organization for Owner such as spare part supply after delivery to be submitted.
2-2) The schedule shall be submitted preferably before pre-award meeting, at the latest before the date of Contract.
* The other requirements for above "DOCUMENTS TO BE SUBMITTED TO BUYER" are indicated in "Specification for Seller's Documents and Drawings" shown in Annex 2A.
6488M-MM10-HXZ-OF-70Z300L2 39
Annex 7 Inspection and Test_Index
6488M-MM10-HXZ-OF-70Z300L2 40
Annex 7 INSPECTION AND TEST Bag making machine
Unless otherwise specified, inspection and tests listed below shall be performed in compliance with test procedure, purchase order description, specifications, and certified Seller's
specifications/drawings.
Inspection at the row to be Applied (X) Remarks Relevant
To be executed and Certificates/Records to be prepared by the Seller Code, MHI
Certificates/Records to be submitted to the Buyer Specifications
To be witnessed/reviewed (X) or observed (O) or reviewed (R) by the Buyer
To be witnessed/reviewed (X) by the Owner
To be witnessed for all items (A) or witnessed for one equipment among the same item (P)
a b c d e f g Inspection items h i
10 Inspection and Test Procedure
11 X X X PIM (Pre Inspection Meeting)
12 X X X R Welding Procedure / Welders Performance Qualification Test WPS/PQR and Welder's certificate review
13
20 Mechanical Inspection and Test
21 X X X X P As per Manufacturer's Standard
note *1
22 X X X R Material Certificates (MILL test reports) 1) Extruder screw, Die head and etc.
23 X X X R UT, MT or PT for Major Components Extruder screw, Die head and etc.
24 Wall Thickness Measurement for Pressure Containing Parts If applicable
25 X X X X P Overall Outside Visual and Dimensional Inspection
26 X X OR Visual Inspection of Welding and Major Repairs
1) Components tested to be finalized at PIM.
27 X X X R Hydrostatic test
28 Leak Test
29 Balancing Test of Rotor Assembly
30 Runout Check of Rotor Assembly
31 Residual Unbalance Test
32 X X X R PMI (Positive Material Identification) note *3
33 X X X R Assembly Inspection (Complete unit test) Clearance Record Review
34 X X X R Cleanliness Inspection before Assembly
1) Vibration, Sound level, Bearing temperature-
rise, Seal leakage, Oil flow to be measured.
35 X X X X X P Mechanical Running Test 2) Unless otherwise specified, running test for 2
hours or until oil temp. stabilization, whichever
longer, is performed.
36 X X X X X P Performance Test
37 Dismantling Inspection
38 Complete Unit Test including Auxiliary Equipment
39 Casing Marking (Serial No.)
41
50 Pressure Vessels & Heat Exchangers
51 X X X R Material Certificates (MILL test reports) note *1
52 X X X R Welding Procedure / Welders' Performance Qualification Test WPS/PQR and Welder's Certificate review
53 X X X R PMI (Positive Material Identification) note *3
54 X X X R Non Destructive Examination (MT/PT/RT) for Welded Portions to Pressure Retaining Parts note *2
55 X X X R Hydrostatic Test or Pneumatic Test Water Proof Test for Atmospheric Vessel
56 X X X R Air Leak Test Helium Leak Test, where required
57 X X X R Overall Outside Visual and Dimensional Inspection
58 X X X R Fit Up Check incl. Internals
59 X X X R Cleanliness Inspection after Assembly
60 X X X R Rust Prevention and Painting Inspection
61
70 Piping Material (Valves), Pre-Fabricated Piping
71 X X X R Material Certificates (MILL test reports) note *1
72 X X X R Welding Procedure / Welders' Performance Qualification Test WPS/PQR and Welder's Certificate review
73 X X X R PMI (Positive Material Identification) note *3
1) note *2
Non Destructive Examination (MT/PT/RT) for Welded Portions to Pressure Retaining 2) Minimum 10% of RT shall be examined for butt
74 X X X R
Parts welded piping of flammable/toxic gas and liquid.
6488M-MM10-HXZ-OF-70Z300L2 41
Annex 7 INSPECTION AND TEST Bag making machine
Unless otherwise specified, inspection and tests listed below shall be performed in compliance with test procedure, purchase order description, specifications, and certified Seller's
specifications/drawings.
Inspection at the row to be Applied (X) Remarks Relevant
To be executed and Certificates/Records to be prepared by the Seller Code, MHI
Certificates/Records to be submitted to the Buyer Specifications
To be witnessed/reviewed (X) or observed (O) or reviewed (R) by the Buyer
To be witnessed/reviewed (X) by the Owner
To be witnessed for all items (A) or witnessed for one equipment among the same item (P)
a b c d e f g Inspection items h i
90 Others
91 X X X R Function Check / Safety Device Check including PLC Panel and Local Panel
Including calibration certificates for all of the
92 X X X R Electrical and/or Instrument Inspection
individual instrument
By Piping flow diagram, layout, fabrication and
93 X X X R Line Check (Layout, Fabrication and Installation) of Packaged Unit
installation.
94 X X X R Name Plate Inspection
95
100 Shipping Inspection
101 X X X X P Rust Prevention and Painting Inspection **** S***-*****
102 X X X X P Quantity Inspection and Tags Check Including Name plate inspection
103 X Packing Inspection
104 X X X R Shipping Documents and Package number
105 X X X R X Pre-shipment Inspection note *5
106 X X X R Final Inspection Release
*2 If specified by relevant specifications and/or drawings, applicable inspection/ test shall be performed.
*3 Unless otherwise specified, in case alloy materials are used for casing, rotor, impellers, shafts, shaft sleeves, casing/impeller wearing ring, shell, tube, piping, and so
on, Positive Material Identification (PMI) shall be performed.
*4 Witnessed inspection by Buyer is required for high pressure piping of flammable/toxic gas and liquid.
*5 The Owner's and/or its third party's witness to pre-shipment inspection will be applied not limited to packages of nitrogen generation units but to all the packages in the
Seller's scope of supply.
6488M-MM10-HXZ-OF-70Z300L2 42
Annex 8 Spare Parts for Construction and Commissioning
6488M-MM10-HXZ-OF-70Z300L2 43
Annex 9 Insurance Spare Parts Not Applicable
Codes and
Equip. No. Service Insurance Spare Parts No. Req’d Remarks
Standards
a)
f)
b)
f)
c)
f)
d)
f)
e)
f)
i)
j)
l)
m)
n)
p)
Note 1: When insurance spare(s) are provided, they shall be packaged in separate, rugged boxes and marked "Spare parts for (tag/item
number)."
Note 2: Test and inspection for insurance spare parts shall be conducted as the same manner as working ones.
Note 3: Unless otherwise specified, cross clearance check and mechanical running test for spare rotor(s) shall be conducted at shop before
shipping .
Note 4: Vertical storage metallic container by steel with associated auxiliaries (N2 connections with valves, and gages) shall be provided with
each spare rotor.
Note 5: When spare rotor(s) are required, the Seller shall propose detail scope of the spare rotor(s) in the proposal. Spare rotor(s) drawing
and parts lists shall be submitted at engineering stage.
6488M-MM10-HXZ-OF-70Z300L2 44
Annex 10 Sub-Vendor List
Not applicable.
The Seller shall submit a list of potential sub-vendors list as a part of its technical proposal.
6488M-MM10-HXZ-OF-70Z300L2 45
Annex 11 Spare Parts for Two Years Operation
The list on the next pages shows Owner's minimum requirements to spare parts for two years operation.
If the listed parts don't exist in the Seller's scope of supply, the Seller shall propose spare parts with similar functions to those listed.
The Seller is requested to submit its quotation of spare parts for two years operation by filling in the list.
After receiving the Seller's proposal for spare parts for two years operation, the Buyer will consult the Owner and define which parts to be purchased.
6488M-MM10-HXZ-OF-70Z300L2 46
1.Spare Parts List Number: For Vendor GPUFP Spare Parts List for 2 Years Operation
Remark:
Project: GPUFP 5. Vendor Contact Information *1. Interchangeability: In case the parts is usable with other parts, input the ID Number.
2. Equipment No.: Company Name:
*2. Classification of Parts:
Country: "Regular" : Regular Consumption Spare Parts which is highly recommended to be replaced during periodical maintenance and 2 years operation.
3. Equipment Name: "Back-up" : Back-up Spare Parts which may be replaced if required as per the result of periodical inspection and/or operation conditions or damage.
Name (PIC):
4. Price Validity: E-mail: *3.: Installed Q'ty = Installed quantity per one (1) equipment
TEL: *4: Spare Q'ty = 2 years Spare parts quantity, Vendor to provide the price based on this quantity
20%
11.3.2.9-03 Shaft Sleeve Min. 1 set for each
type
20%
11.3.2.9-04 Impeller Wear Ring Min. 1 set for each
type
20%
11.3.2.9-05 Casing Wear Ring Min. 1 set for each
type
20%
11.3.2.9-06 Throat Bush Min. 1 set for each
type
100%
11.3.2.9-08 Bearing Min. 1 set
11.3.2.26 Chiller
Strainer
20%
11.3.2.34-
Screen Min. 1 set for each
10-01 size and material
6488M-MM10-HXZ-OF-70Z300L2 47
1.Spare Parts List Number: For Vendor GPUFP Spare Parts List for 2 Years Operation
Remark:
Project: GPUFP 5. Vendor Contact Information *1. Interchangeability: In case the parts is usable with other parts, input the ID Number.
2. Equipment No.: Company Name:
*2. Classification of Parts:
Country: "Regular" : Regular Consumption Spare Parts which is highly recommended to be replaced during periodical maintenance and 2 years operation.
3. Equipment Name: "Back-up" : Back-up Spare Parts which may be replaced if required as per the result of periodical inspection and/or operation conditions or damage.
Name (PIC):
4. Price Validity: E-mail: *3.: Installed Q'ty = Installed quantity per one (1) equipment
TEL: *4: Spare Q'ty = 2 years Spare parts quantity, Vendor to provide the price based on this quantity
Safety Valve
11.3.2.34-
Gasket 200%
14-01
20%
11.3.2.34-
Disc Holder Min. 1 set for each
14-02 type
20%
11.3.2.34-
Bellows Min. 1 set for each
14-03 type
11.3.2.34-
O-rings 100%
14-04
11.3.2.40 Instrument
2. PLC
11.3.2.40-2-
CPU Unit 50%
01
11.3.2.40-2-
Power Supply Card 50%
02
11.3.2.40-2-
Network Card 50%
03
11.3.2.40-2-
Communication Card 50%
04
11.3.2.40-2-
HMI 50%
05
11.3.2.40-2-
I/O Card 50%
06
11.3.2.40-2-
Fuse 100%
07
7. Instrument
Panel
11.3.2.40-7-
Relay 25%
01
6488M-MM10-HXZ-OF-70Z300L2 48
1.Spare Parts List Number: For Vendor GPUFP Spare Parts List for 2 Years Operation
Remark:
Project: GPUFP 5. Vendor Contact Information *1. Interchangeability: In case the parts is usable with other parts, input the ID Number.
2. Equipment No.: Company Name:
*2. Classification of Parts:
Country: "Regular" : Regular Consumption Spare Parts which is highly recommended to be replaced during periodical maintenance and 2 years operation.
3. Equipment Name: "Back-up" : Back-up Spare Parts which may be replaced if required as per the result of periodical inspection and/or operation conditions or damage.
Name (PIC):
4. Price Validity: E-mail: *3.: Installed Q'ty = Installed quantity per one (1) equipment
TEL: *4: Spare Q'ty = 2 years Spare parts quantity, Vendor to provide the price based on this quantity
11.3.2.40-7-
Fuse 100%
03
11.3.2.40-7-
Switch 25%
04
8. For
Packaged
Units
11.3.2.40-8- Recommended by
Any spares the Seller
01
6488M-MM10-HXZ-OF-70Z300L2 49
Annex 12
Alternative Proposal as Cost Saving Plan
Project: GPUFP
Seller: XXXX (Name to be filled by Seller)
Ref. of Seller Proposal: XXXX (Reference No. of Proposal to be filled by Seller.)
Reason/Benefit/Demerit of Proposed
Sr. No. Item Number Cost Saving Plan Expected Cost Saving
Cost Saving Plan
Price Currency
6488M-MM10-HXZ-OF-70Z300L2 50
Annex 13 "List of Deviations and Clarifications" Format
* Width of each column may be changed and adjusted by the Seller.
Project: GPUFP
Seller:
Req.(PO) No.:
6488M-MM10-HXZ-OF-70Z300L2 51