A. CONTRACTOR DATA
Company :
Address :
CP :
B. WORK DETAIL
Project : Long House & Infrastructural Estate
Work : CIVIL & STRUCTURE
Location : Industrial Esatate MNA
C. QUOTATION DETAIL
No Description
A. PRELIMINERIES
1 Mobilization and Demobilization
2 Documentation, Administration, Shop Drawing & Asbuilt Drawing
3 Setting Out , Preparation Area & Surveying
4 Health, Safety & Environment
5 Security & Cleaning
6 Health Ansurance
7 Water & Electrical Temporary c/w STPM
8 Site Temporary Office & Warehouse
9 Scaffolding
B.2 ARCHITECTURAL
1 Red Brick Wall
2 Plestering Wall + Finishing (Aci)
3 Wall Painting (Primer, Alkali & Finish)
4 Ceramic Tile 40x40
5 Plafond Gypsum thk 9 mm
6 Waterpoofing Membrane for Roof
7 Glass Window 1850 x 1000 mm thk 8 mm c/w Powder Coating Frame
9 Glass Louver Toilet Ventilation 750 x 350 mm c/w Powder Coating Frame
10 Glass Double Door 3000 x 2700 mm c/w Powder Coating Frame
11 Glass Door 2100 x 1000 mm c/w Powder Coating Frame
12 Plywood Door HPL inside 2100 x 1000 mm
13 Steel Door 2100 x 1000 mm
14 PVC Door 2000 x 800 mm
15 Steel Shaft Door for Plumbing 650 x 375
16 Sit Closet c/w Bidet
18 PVC Pipe 4" for Plumbing c/w Elbow & Accessory
19 PVC Pipe 3" for Plumbing c/w Elbow & Accessory
20 PVC Pipe 1" for Plumbing c/w Elbow & Accessory
21 PVC Pipe 1/2" for Plumbing c/w Elbow & Accessory
22 Shower & Valve c/w Accessory
23 Down Pipe PVC 4" c/w Elbow & Accessory
24 Carbon Pipe Handrail
25 Sandblasting & Painting
26 Bio Septick Tank Capacity 25 people
27 Water Torrent 5000 L
C.3 ARCHITECTURAL
1 Red Brick Wall
2 Plestering Wall + Finishing (Aci)
3 Wall Painting (Primer, Alkali & Finish)
4 Ceramic Tile 40x40
5 Plafond Gypsum thk 9 mm - c/w finish & paint
6 Waterpoofing Membrane for Roof
7 Glass Window 1850 x 1000 mm thk 8 mm c/w Powder Coating Frame
8 Glass Louver Toilet Ventilation 750 x 350 mm c/w Powder Coating Frame
9 Glass Double Door 3000 x 2700 mm c/w Powder Coating Frame
10 Glass Door 2100 x 1000 mm c/w Powder Coating Frame
11 Plywood Door HPL inside 2100 x 1000 mm
12 Steel Door 2100 x 1000 mm
13 PVC Door 2000 x 800 mm
14 Steel Shaft Door for Plumbing 650 x 375
15 Sit Closet c/w Bidet
17 PVC Pipe 4" for Plumbing c/w Elbow & Accessory
18 PVC Pipe 3" for Plumbing c/w Elbow & Accessory
19 PVC Pipe 1" for Plumbing c/w Elbow & Accessory
20 PVC Pipe 1/2" for Plumbing c/w Elbow & Accessory
21 Shower & Valve c/w Accessory
22 Down Pipe PVC 4" c/w Elbow & Accessory
23 Carbon Pipe Handrail
24 Sandblasting & Painting
25 Bio Septick Tank Capacity 30 people
26 Water Torrent 5000 L
D LONGHOUSE INFRASTRUCTURE
1 Soil Excavation
2 Soil Disposal
3 Concrete Plastic
4 Lean Concrete (Rabat) thk 5 cm
5 Brick Wall Drainage
6 Plestering Wall + Finishing (Aci)
E ELECTRICAL WORK
E.1 LONG HOUSE TYPE 1 - 3 UNIT
E.1.1 Long House G3 Bangunan 3 Lantai 1
A Instalasi listrik dalam ruang (Lampu, stop kontak dan saklar) c/w material cable, scun, pipa PVC, T-doos dan
1 MCB Box Schneider c/w PVC Clipsal and cable NYYHY 3x2.5mm to connecting from JB
2 Instalasi Stop Kontak Philips kabel 3x2.5mm NYYHY supreme, PVC clipsal 20mm, T-doos dll
3 Instalasi Lighting philips 18w c/w fitting, kabel 3x2.5mm NYYHY supreme, PVC clipsal 20mm, T-doos dl
4 Instalasi Saklar single Philips c/w kabel 3x2.5mm NYYHY supreme, PVC clipsal 20mm, T-doos dll
B Instalasi grup power distribusi lantai 1 (Lampu, stop kontak dan saklar) c/w material cable, scun, pipa PVC,
1 Junction Box HENSEL JUNCTION BOX KF-8250 DIM.200l c/w kabel NYYHY 3x6mm, gland dan aksesoris (
2 PVC Ducting 200x100mm
3 Instalasi Stop Kontak Philips kabel 3x2.5mm NYYHY supreme, PVC clipsal 20mm, T-doos dll
4 Instalasi Lighting philips 18w c/w fitting, kabel 3x2.5mm NYYHY supreme, PVC clipsal 20mm, T-doos dl
5 Instalasi Saklar Double Philips c/w kabel 3x2.5mm NYYHY supreme, PVC clipsal 20mm, T-doos dll
B Instalasi grup power distribusi lantai 1 (Lampu, stop kontak dan saklar) c/w material cable, scun, pipa PVC,
1 Junction Box HENSEL JUNCTION BOX KF-8250 DIM.200l c/w kabel NYYHY 3x6mm, gland dan aksesoris (
2 PVC Ducting 200x100mm
3 Instalasi Stop Kontak Philips kabel 3x2.5mm NYYHY supreme, PVC clipsal 20mm, T-doos dll
4 Instalasi Lighting philips 18w c/w fitting, kabel 3x2.5mm NYYHY supreme, PVC clipsal 20mm, T-doos dl
5 Instalasi Saklar Double Philips c/w kabel 3x2.5mm NYYHY supreme, PVC clipsal 20mm, T-doos dll
B Instalasi grup power distribusi lantai 1 (Lampu, stop kontak dan saklar) c/w material cable, scun, pipa PVC,
1 Junction Box HENSEL JUNCTION BOX KF-8250 DIM.200l c/w kabel NYYHY 3x6mm, gland dan aksesoris (
2 PVC Ducting 200x100mm
3 Instalasi Stop Kontak Philips kabel 3x2.5mm NYYHY supreme, PVC clipsal 20mm, T-doos dll
4 Instalasi Lighting philips 18w c/w fitting, kabel 3x2.5mm NYYHY supreme, PVC clipsal 20mm, T-doos dl
5 Instalasi Saklar Double Philips c/w kabel 3x2.5mm NYYHY supreme, PVC clipsal 20mm, T-doos dll
B Instalasi grup power distribusi lantai 1 (Lampu, stop kontak dan saklar) c/w material cable, scun, pipa PVC,
1 Junction Box HENSEL JUNCTION BOX KF-8250 DIM.200l c/w kabel NYYHY 3x6mm, gland dan aksesoris (
2 PVC Ducting 200x100mm
3 Instalasi Stop Kontak Philips kabel 3x2.5mm NYYHY supreme, PVC clipsal 20mm, T-doos dll
4 Instalasi Lighting philips 18w c/w fitting, kabel 3x2.5mm NYYHY supreme, PVC clipsal 20mm, T-doos dl
5 Instalasi Saklar Double Philips c/w kabel 3x2.5mm NYYHY supreme, PVC clipsal 20mm, T-doos dll
F. CLINIC
F.1 GROUND WORK
1 Soil Excavation
2 Soil Refill compacted
3 Mini Pile Square 200 mm
4 Sand Compacted thk 10 cm
5 Lean concrete thk 5 cm
6 BJTD 13 Reinforced Bar for Foot Foundation
7 BJTD 16 Reinforced Bar for Sloof
8 BJTP 8 for Begel Sloof
9 Wiremesh M8 Single Layer for Groundfloor
10 Polywood Formwork
11 Concrete K-300 (Material By Wilmar)
G. FIRE STATION
G.1 GROUNDWORK
1 Soil Cutting
2 Soil Refill compacted with CBR 4%
3 Mini Pile Square 200 mm
4 Sand Compacted thk 10 cm
5 Lean concrete thk 5 cm (1:3:5)
6 BJTD 13 Reinforced Bar for Foot Foundation PC1
7 BJTD 13 Reinforced Bar for Foot Foundation PC2
8 BJTD 16 Reinforced Bar for Sloof SL 1
9 BJTD 16 Reinforced Bar for Sloof SL 2
10 BJTP 8 for Begel Sloof SL 1
11 BJTP 8 for Begel Sloof SL 2
12 Wiremesh M8 Single Layer for Groundfloor
13 Wiremesh M8 Double Layer for Garage
14 Polywood Formwork
15 Concrete K-300 (Material By Wilmar)
I. FOOD COURT
I.1 Groundwork
2 Soil excavtaion
3 Soil Refill compacted
4 Mini Pile Square 200 mm
5 Sand Compacted thk 10 cm
6 Lean concrete thk 5 cm (1:3:5)
7 BJTD 13 Reinforced Bar for Foot Foundation
8 BJTD 16 Reinforced Bar for Sloof
9 BJTP 8 for Begel Sloof
10 Wiremesh M8 Single Layer for Groundfloor
11 Polywood Formwork
12 Concrete K-300 (material By Wilmar)
TRACTOR DATA
TATION DETAIL
Description
RELIMINERIES
Mobilization and Demobilization
Documentation, Administration, Shop Drawing & Asbuilt Drawing
Setting Out , Preparation Area & Surveying
Health, Safety & Environment
Security & Cleaning
Health Ansurance
Water & Electrical Temporary c/w STPM
Site Temporary Office & Warehouse
Scaffolding
RCHITECTURAL
Red Brick Wall
Plestering Wall + Finishing (Aci)
Wall Painting (Primer, Alkali & Finish)
Ceramic Tile 40x40
Plafond Gypsum thk 9 mm
Waterpoofing Membrane for Roof
Glass Window 1850 x 1000 mm thk 8 mm c/w Powder Coating Frame
Glass Louver Toilet Ventilation 750 x 350 mm c/w Powder Coating Frame
Glass Double Door 3000 x 2700 mm c/w Powder Coating Frame
Glass Door 2100 x 1000 mm c/w Powder Coating Frame
Plywood Door HPL inside 2100 x 1000 mm
Steel Door 2100 x 1000 mm
PVC Door 2000 x 800 mm
Steel Shaft Door for Plumbing 650 x 375
Sit Closet c/w Bidet
PVC Pipe 4" for Plumbing c/w Elbow & Accessory
PVC Pipe 3" for Plumbing c/w Elbow & Accessory
PVC Pipe 1" for Plumbing c/w Elbow & Accessory
PVC Pipe 1/2" for Plumbing c/w Elbow & Accessory
Shower & Valve c/w Accessory
Down Pipe PVC 4" c/w Elbow & Accessory
Carbon Pipe Handrail
Sandblasting & Painting
Bio Septick Tank Capacity 25 people
Water Torrent 5000 L
RCHITECTURAL
Red Brick Wall
Plestering Wall + Finishing (Aci)
Wall Painting (Primer, Alkali & Finish)
Ceramic Tile 40x40
Plafond Gypsum thk 9 mm - c/w finish & paint
Waterpoofing Membrane for Roof
Glass Window 1850 x 1000 mm thk 8 mm c/w Powder Coating Frame
Glass Louver Toilet Ventilation 750 x 350 mm c/w Powder Coating Frame
Glass Double Door 3000 x 2700 mm c/w Powder Coating Frame
Glass Door 2100 x 1000 mm c/w Powder Coating Frame
Plywood Door HPL inside 2100 x 1000 mm
Steel Door 2100 x 1000 mm
PVC Door 2000 x 800 mm
Steel Shaft Door for Plumbing 650 x 375
Sit Closet c/w Bidet
PVC Pipe 4" for Plumbing c/w Elbow & Accessory
PVC Pipe 3" for Plumbing c/w Elbow & Accessory
PVC Pipe 1" for Plumbing c/w Elbow & Accessory
PVC Pipe 1/2" for Plumbing c/w Elbow & Accessory
Shower & Valve c/w Accessory
Down Pipe PVC 4" c/w Elbow & Accessory
Carbon Pipe Handrail
Sandblasting & Painting
Bio Septick Tank Capacity 30 people
Water Torrent 5000 L
ONGHOUSE INFRASTRUCTURE
Soil Excavation
Soil Disposal
Concrete Plastic
Lean Concrete (Rabat) thk 5 cm
Brick Wall Drainage
Plestering Wall + Finishing (Aci)
LECTRICAL WORK
ONG HOUSE TYPE 1 - 3 UNIT
ong House G3 Bangunan 3 Lantai 1
stalasi listrik dalam ruang (Lampu, stop kontak dan saklar) c/w material cable, scun, pipa PVC, T-doos dan aksesoris (16 Set x 3)
MCB Box Schneider c/w PVC Clipsal and cable NYYHY 3x2.5mm to connecting from JB
Instalasi Stop Kontak Philips kabel 3x2.5mm NYYHY supreme, PVC clipsal 20mm, T-doos dll
Instalasi Lighting philips 18w c/w fitting, kabel 3x2.5mm NYYHY supreme, PVC clipsal 20mm, T-doos dll (Lamp By Wilmar)
Instalasi Saklar single Philips c/w kabel 3x2.5mm NYYHY supreme, PVC clipsal 20mm, T-doos dll
stalasi grup power distribusi lantai 1 (Lampu, stop kontak dan saklar) c/w material cable, scun, pipa PVC, T-doos dan aksesoris ( 1 Set x
Junction Box HENSEL JUNCTION BOX KF-8250 DIM.200l c/w kabel NYYHY 3x6mm, gland dan aksesoris (junction Box By wilmar)
PVC Ducting 200x100mm
Instalasi Stop Kontak Philips kabel 3x2.5mm NYYHY supreme, PVC clipsal 20mm, T-doos dll
Instalasi Lighting philips 18w c/w fitting, kabel 3x2.5mm NYYHY supreme, PVC clipsal 20mm, T-doos dll (Lamp By Wilmar)
Instalasi Saklar Double Philips c/w kabel 3x2.5mm NYYHY supreme, PVC clipsal 20mm, T-doos dll
stalasi grup power distribusi lantai 1 (Lampu, stop kontak dan saklar) c/w material cable, scun, pipa PVC, T-doos dan aksesoris ( 1 Set x
Junction Box HENSEL JUNCTION BOX KF-8250 DIM.200l c/w kabel NYYHY 3x6mm, gland dan aksesoris (junction Box By wilmar)
PVC Ducting 200x100mm
Instalasi Stop Kontak Philips kabel 3x2.5mm NYYHY supreme, PVC clipsal 20mm, T-doos dll
Instalasi Lighting philips 18w c/w fitting, kabel 3x2.5mm NYYHY supreme, PVC clipsal 20mm, T-doos dll (Lamp By Wilmar)
Instalasi Saklar Double Philips c/w kabel 3x2.5mm NYYHY supreme, PVC clipsal 20mm, T-doos dll
stalasi grup power distribusi lantai 1 (Lampu, stop kontak dan saklar) c/w material cable, scun, pipa PVC, T-doos dan aksesoris ( 1 Set x
Junction Box HENSEL JUNCTION BOX KF-8250 DIM.200l c/w kabel NYYHY 3x6mm, gland dan aksesoris (junction Box By wilmar)
PVC Ducting 200x100mm
Instalasi Stop Kontak Philips kabel 3x2.5mm NYYHY supreme, PVC clipsal 20mm, T-doos dll
Instalasi Lighting philips 18w c/w fitting, kabel 3x2.5mm NYYHY supreme, PVC clipsal 20mm, T-doos dll (Lamp By Wilmar)
Instalasi Saklar Double Philips c/w kabel 3x2.5mm NYYHY supreme, PVC clipsal 20mm, T-doos dll
stalasi grup power distribusi lantai 1 (Lampu, stop kontak dan saklar) c/w material cable, scun, pipa PVC, T-doos dan aksesoris ( 1 Set x
Junction Box HENSEL JUNCTION BOX KF-8250 DIM.200l c/w kabel NYYHY 3x6mm, gland dan aksesoris (junction Box By wilmar)
PVC Ducting 200x100mm
Instalasi Stop Kontak Philips kabel 3x2.5mm NYYHY supreme, PVC clipsal 20mm, T-doos dll
Instalasi Lighting philips 18w c/w fitting, kabel 3x2.5mm NYYHY supreme, PVC clipsal 20mm, T-doos dll (Lamp By Wilmar)
Instalasi Saklar Double Philips c/w kabel 3x2.5mm NYYHY supreme, PVC clipsal 20mm, T-doos dll
ROUND WORK
Soil Excavation
Soil Refill compacted
Mini Pile Square 200 mm
Sand Compacted thk 10 cm
Lean concrete thk 5 cm
BJTD 13 Reinforced Bar for Foot Foundation
BJTD 16 Reinforced Bar for Sloof
BJTP 8 for Begel Sloof
Wiremesh M8 Single Layer for Groundfloor
Polywood Formwork
Concrete K-300 (Material By Wilmar)
IRE STATION
ROUNDWORK
Soil Cutting
Soil Refill compacted with CBR 4%
Mini Pile Square 200 mm
Sand Compacted thk 10 cm
Lean concrete thk 5 cm (1:3:5)
BJTD 13 Reinforced Bar for Foot Foundation PC1
BJTD 13 Reinforced Bar for Foot Foundation PC2
BJTD 16 Reinforced Bar for Sloof SL 1
BJTD 16 Reinforced Bar for Sloof SL 2
BJTP 8 for Begel Sloof SL 1
BJTP 8 for Begel Sloof SL 2
Wiremesh M8 Single Layer for Groundfloor
Wiremesh M8 Double Layer for Garage
Polywood Formwork
Concrete K-300 (Material By Wilmar)
OOD COURT
roundwork
Soil excavtaion
Soil Refill compacted
Mini Pile Square 200 mm
Sand Compacted thk 10 cm
Lean concrete thk 5 cm (1:3:5)
BJTD 13 Reinforced Bar for Foot Foundation
BJTD 16 Reinforced Bar for Sloof
BJTP 8 for Begel Sloof
Wiremesh M8 Single Layer for Groundfloor
Polywood Formwork
Concrete K-300 (material By Wilmar)
GRAND TOTAL
% (include/non-include *)
PT. MNA SERANG
Unit Volume
Material Labor Total
ls 1.00
ls 1.00
ls 1.00
ls 1.00
ls 1.00
ls 1.00
ls 1.00
ls 1.00
ls 1.00
m3 202.86
m3 149.04
m3 53.82
m3 52.22
m3 26.11
nos 138.00
m2 6.77
m2 1,403.04
kg 38,962.87
m3 424.45
m2 2,268.00
kg 167,734.72
m2 10,173.89
m3 1,424.11
m2 10,014.78
m2 20,029.56
m2 21,771.96
m2 7,152.00
m2 5,400.00
m2 2,268.00
unit 288.00
unit 144.00
unit 3.00
unit 18.00
unit 144.00
unit 1.00
unit 144.00
unit 96.00
unit 144.00
m' 2,299.20
m' 259.20
m' 2,011.20
m' 259.20
unit 144.00
m' 366.00
kg 5,372.66
m2 230.16
unit 12.00
unit 6.00
m3 67.62
m3 49.68
m3 17.94
m3 16.40
m3 8.20
nos 46.00
m2 2.26
m2 435.36
kg 12,284.06
m3 129.25
m2 653.60
kg 41,950.11
m2 2,363.58
m3 347.02
m2 1,779.22
m2 3,558.44
m2 3,961.64
m2 1,384.00
m2 1,008.00
m2 720.00
unit 40.00
unit 32.00
unit 1.00
unit 4.00
unit 32.00
unit 1.00
unit 32.00
unit 32.00
unit 32.00
m' 468.00
m' 64.80
m' 396.00
m' 64.80
unit 32.00
m' 120.00
kg 1,294.57
m2 55.46
unit 1.00
unit 1.00
m3 57.60
m3 57.60
m2 76.80
m3 3.84
m2 192.00
m2 192.00
Set 48.00
Set 144.00
Set 192.00
Set 192.00
Set 6.00
Set 54.00
Set 6.00
Set 60.00
Set 12.00
Set 48.00
Set 144.00
Set 192.00
Set 192.00
Set 6.00
Set 54.00
Set 6.00
Set 60.00
Set 12.00
Set 48.00
Set 144.00
Set 192.00
Set 192.00
Set 6.00
Set 54.00
Set 6.00
Set 60.00
Set 12.00
Set
Set 3.00
Set 3.00
Set 3.00
Set 3.00
Set 3.00
Set 16.00
Set 48.00
Set 64.00
Set 64.00
Set 2.00
Set 11.00
Set 2.00
Set 20.00
Set 4.00
Set 16.00
Set 48.00
Set 64.00
Set 64.00
Set 2.00
Set 11.00
Set 2.00
Set 20.00
Set 4.00
Set
Set 1.00
Set 1.00
Set 1.00
Set 1.00
m3 15.30
m3 14.18
m' 102.00
m3 13.70
m3 13.70
kg 286.95
kg 575.15
kg 165.41
m2 99.00
m2 57.90
m3 10.70
kg 584.53
kg 128.79
kg 575.15
kg 124.06
m2 113.61
m3 5.00
m2 204.75
m2 409.50
m2 409.50
m2 78.50
m2 7.00
m2 10.20
m2 6.00
m2 12.00
m2 94.70
m2 27.00
m2 8.50
set 1.00
set 1.00
set 3.00
set 2.00
set 2.00
set 1.00
set 1.00
set 1.00
set 2.00
set 1.00
set 1.00
set 1.00
set 2.00
m2 143.47
m2 143.47
m' 47.20
m3 15.30
m3 14.18
nos 26.00
m3 45.45
m3 25.44
kg 303.83
kg 300.08
kg 1,085.90
kg 473.50
kg 334.61
kg 77.97
m2 279.00
m2 105.00
m2 131.90
m3 55.00
kg 1,093.42
kg 986.93
kg 191.93
kg 211.50
kg 5,959.80
kg 755.15
m2 544.40
m3 20.76
m2 972.70
m2 1,945.40
m2 1,945.40
m2 255.00
m2 18.10
m2 21.77
m2 24.00
m2 56.00
m2 105.00
m2 279.00
set 1.00
set 3.00
set 10.00
set 8.00
set 3.00
set 1.00
set 3.00
set 3.00
set 1.00
m3 0.09
kg 8.26
m2 0.90
set 2.00
set 2.00
set 3.00
m2 384.00
m2 384.00
m3 7.20
m3 3.05
kg 209.21
m3 139.92
m3 65.28
m3 74.64
m2 994.56
nos 24.00
m3 117.30
m3 58.65
kg 910.25
kg 4,250.77
kg 1,537.30
kg 454.56
kg 186.44
m2 960.00
m2 381.19
m2 984.00
m3 129.01
nos 144.00
kg 871.16
kg 6,937.92
kg 7,910.48
m2 2,397.00
m2 448.96
m2 677.60
m2 1,355.20
m2 1,355.20
m2 163.80
m2 163.80
m2 118.00
m2 30.00
m2 74.40
set 11.00
set 8.00
set 6.00
set 3.00
set 4.00
m3 0.24
kg 10.93
m2 2.40
set 6.00
set 6.00
m2 1,140.00
kg 1,330.00
m2 307.20
m2 38.40
m3 12.60
m3 9.45
nos 14.00
m3 6.30
m3 3.15
kg 236.31
kg 438.15
kg 147.42
m2 54.00
m2 45.85
m3 7.06
kg 481.38
kg 106.06
kg 438.15
kg 110.56
m2 83.86
m3 25.05
m2 177.45
m2 354.90
m2 354.90
m2 42.40
m2 4.80
m2 5.60
m2 4.80
m2 25.60
m2 54.00
m2 23.00
m2 3.85
set 1.00
set 1.00
set 2.00
set 2.00
set 1.00
set 2.00
set 2.00
set 1.00
pcs 1.00
pcs 1.00
pcs 1.00
pcs 1.00
pcs 2.00
m2 87.75
m2 87.75
m3 0.36
kg 53.27
m' 36.00