You are on page 1of 1

SI-17-3

COMMISSIONING TEST CERTIFICATE


TRANSFORMER PRIMARY RATIO & INSULATION TEST
Customer : PT .Pama Persada Nusantara Site : ABB
Equipment No. : TR-15KVA-400V Area : Main Substation 36 KV
Data of tested object :
Mfg : CENTRADO Control Power : N/A
Type : -------------- Serial No. : 1905005
Rated : 36 kV - 400 V ( 15 KVA) CT RATIO : N/A
Date of testing :
Test Equipments :
1. Fluke Digital Multimeter
2. Kyoritsu Phase Sequence Meter
3. Insulation test
Result or Affect
Measuring Point Current/Voltage/Freq. Remarks
Devices Description Reading

1. Transformer TAP 3
- Voltage Input Measurement ( Primary) - Voltage Output Measurement ( Secondary )
Voltage L1 - L2 = 388 Volt Voltage L1 - L2 = 3.8 Volt Ok.
Voltage L2 - L3 = 388 Volt Voltage L2 - L3 = 3,9 Volt Ok.
Voltage L3 - L1 = 388 Volt Voltage L3 - L1 = 3.8 Volt Ok.
Voltage L1 - N = 224 Volt Voltage L1 - N = 2,1 Volt Ok.
Voltage L2 - N = 224 Volt Voltage L2 - N = 2,1 Volt Ok.
Voltage L3 - N = 224 Volt Voltage L3 - N = 2,0 Volt Ok.
- Phase Rotation :Clockwise - Phase Rotation : N/A ( after energized Ok ) Ok.

2. Trafo Insullation Resistance Test

Primary - Secondary : U1 - u1 : 178 GΩ OK


( 5000 VDC )
Primary - Ground : U1 - G : 57,1 GΩ OK
( 5000 VDC )
Secondary - Ground : U1 - G : 201 GΩ OK
( 1000 VDC )

3. LV Cable Insullation Resistance Tes( 1000 VDC )

R - S : 771 MΩ OK
S - T : 578 MΩ OK
T - R : 687 MΩ OK

R - G : 549 MΩ OK
S - G : 511 MΩ OK
T - G : 625 MΩ OK

Remarks etc. :
Test Of Megger 1Minute

Acknowledge Withness test Tested by, Siemens


PT. Pama Persada Nusantara PT. Pama Persada Nusantara Siemens Technical Services
09/01/99

…………....… …………....… ..........................…


ATD-

Signature,date Signature,date Signature,date

Unrestricted 463432758.xlsx / 463432758.xlsx