Company: Yuan Teck Sdn.Bhd.

Conducted By: Raymond Sign:


Site Safety Supervisor
Location: Farlim Square Reviewed By: Palanitharan Sign:
Safety Officer
Approved By: KUNG Sign: Date :From … March 2015 September 2016
WENG To
LIANG
Date: Remarks:

Page 1 of 12
Prepared by: PALANITHARAN 0134809027
Page 2 of 12
Prepared by: PALANITHARAN 0134809027
Page 3 of 12
Prepared by: PALANITHARAN 0134809027
Page 4 of 12
Prepared by: PALANITHARAN 0134809027
1. Tower Crane Dismantle Work
HAZARD IDENTIFICATION RISK ASSESSMENT RISK CONTROL

Work Hazard Which can Existing Risk Likelihood Severity Risk Recommended control PIC
Activity cause / effect Control measure ( Due Date /
(if any) Status )
Install/Disman Accidently Extensive body Full P.P.E Make crane having Safety Dept.
tling of tower knocking injury Compliance, 2 2 4 valid PMA / driver
crane. while hoisting Toolbox competent license
training valid /critical lift
inspection.
Install/Disman Falling from Extensive body Training Safety Harness issuing Safety Dept.
tling the height – injury / Fatal program 5 4 20 and hard barricade for
counter jib human floor opening.
ballast.
Bring the Falling object Extensive body Full P.P.E Working at heights safe Safety Dept.
trolley to the from high injury / Fatal Compliance, 4 3 12 operational procedure
jib foot and level Toolbox & training.
remove the training
front and rear
ropes.
Disconnect all Electrical Injury /Fatal or Fixed period Random checking on Safety Dept.
the electrical hazard death maintenance 1 4 4 hoisting cable at site
circuits and specially new crane in
remove /inspection check list
cables.
Dismantle the Low Quality/ Collapse during Inspection prior Inspection of the timber Site Supervisor.
main jib Damaged concrete usage 1 4 4 quality, and use PE
section as per specified timbers
manufacturers
manual
Un proper Fatal or death Training Monitor the method of Engineer, Site
suspend 2 4 8 suspending form work. Coordinator &
method Scaffolder.

Page 5 of 12
Prepared by: PALANITHARAN 0134809027
2. CONCRETING WORK
HAZARD IDENTIFICATION RISK ASSESSMENT RISK CONTROL

Work Hazard Which can Existing Risk Likelihood Severity Risk Recommended control PIC
Activity cause / effect Control measure ( Due Date /
(if any) Status )
Concreting Falling from Extensive body Full P.P.E Safety Harness issuing Safety Dept.
work height - injury / Fatal Compliance, 5 4 20 and hard barricade for
human tool box floor opening.
training
Falling object Extensive body Full P.P.E Working at heights safe Safety Dept.
from high injury / Fatal Compliance, 4 3 12 operational procedure
level tool box & training.
training
Hit by Body injury Full P.P.E Make crane having Safety Dept.
concrete Compliance, 2 2 4 valid PMA & driver
bucket tool box competent license valid
training / critical lift inspection.
Hoisting cable Fatal or death Fixed period Random checking on Safety Dept.
of the crane maintenance 1 4 4 hoisting cable at site
snap especially new crane
in / inspection check
list.

Page 6 of 12
Prepared by: PALANITHARAN 0134809027
3. BRICK WORK
HAZARD IDENTIFICATION RISK ASSESSMENT RISK CONTROL

Work Hazard Which can Existing Risk Likelihood Severity Risk Recommended control PIC
Activity cause / effect Control measure ( Due Date /
(if any) Status )
Brick work Falling object Extensive body Full P.P.E Carry out barricade at Site Supervisor.
(Future from high injury / Fatal Compliance, ground level wear work
activity) level tool box 3 2 6 on going and warning
training signage.

Accidentally Body injury Full P.P.E Make crane having Safety Dept.
knocking Compliance, valid PMA & driver
while loading tool box 2 2 4 competent license valid
brick training / critical lift inspection.

Pinch in Body injury Full P.P.E Working at heights safe Safety Dept.
between while Compliance, operational procedure
loading brick tool box 2 2 4 & training.
training

Falling from Extensive body Full P.P.E Safety Harness issuing Site Supervisor.
height – injury / death Compliance, and hard barricade for Safety Dept.
human tool box 5 4 20 floor opening.
training

Sharp edge Body injury / first Eliminate, Random inspection and Safety Dept.
object – aid type injury Full P.P.E worn proper P.P.E.
Pallet, Door or compliance. 3 1 3
Window
frame.

Page 7 of 12
Prepared by: PALANITHARAN 0134809027
4. EXTERNAL PLASTERING
HAZARD IDENTIFICATION RISK ASSESSMENT RISK CONTROL

Work Hazard Which can Existing Risk Likelihood Severity Risk Recommended control PIC
Activity cause / effect Control measure ( Due Date /
(if any) Status )
External Dust pollution Lung disease Housekeeping, Refer to MSDS and Safety Dept.
plastering (silicosis) / nose use disposal 3 1 3 keep a copy for site Site Supervisor.
(Future and throat mask, training personnel reference.
activity) irritation
Wallcrete Skin / eye illness Full P.P.E Refer to MSDS and Safety Dept
contact Compliance, 3 1 3 keep a copy for site Site Supervisor.
tool box personnel reference.
training
Falling object Extensive body Full P.P.E Working at heights safe Safety Dept
while injury / Fatal Compliance, 3 4 12 operational procedure Site Supervisor.
hoisting– tool box & training.
cement bags training
& sand
Cement Eye / skin illness Full PPE Refer to MSDS and Safety Dept
mortar splash or irritation Compliance, 3 1 3 keep a copy for site Site Supervisor.
tool box personnel reference.
training
Falling from Extensive body Full P.P.E Working at heights safe Safety Dept
height – injury / Fatal Compliance, 3 4 12 operational procedure Site Supervisor.
human tool box & training.
training

Page 8 of 12
Prepared by: PALANITHARAN 0134809027
5. SCAFFOLDING ERECTION AND DISMANTLING
HAZARD IDENTIFICATION RISK ASSESSMENT RISK CONTROL

Work Hazard Which can Existing Risk Likelihood Severity Risk Recommended control PIC
Activity cause / effect Control measure ( Due Date /
(if any) Status )
Scaffolding Falling from Extensive body Training Working at heights safe Safety Dept.
erection and height – injury / Fatal program 3 4 12 operational procedure
dismantling human & training.

Slippery – Body injury Full P.P.E Working at heights safe Safety Dept.
rainy season Compliance, 3 3 9 operational procedure
or un proper tool box & training.
P.P.E training
Falling object Body injury / Fatal Full PPE Working at heights safe Safety Dept.
from high Compliance, 4 4 16 operational procedure
level tool box & training.
training
Scaffolding Extensive body Weekly To carry out weekly Scaffolder.
collapse due injury / Fatal inspection 2 5 10 inspection by
to un proper competent scaffolder.
method
Platform Extensive body Weekly 1 5 5 To carry out weekly Scaffolder.
broken injury / Fatal inspection inspection by
competent scaffolder.

Page 9 of 12
Prepared by: PALANITHARAN 0134809027
6. EXTERNAL PAINTING WORK
HAZARD IDENTIFICATION RISK ASSESSMENT RISK CONTROL

Work Hazard Which can Existing Risk Likelihood Severity Risk Recommended control PIC
Activity cause / effect Control measure ( Due Date /
(if any) Status )
External Falling from Extensive body Full P.P.E Working at heights safe Safety Dept
Painting work height – injury / Fatal Compliance, 3 4 12 operational procedure
(Future human tool box & training.
activity) training
Falling object Extensive body Full PPE Working at heights safe Safety Dept
from high injury / Fatal Compliance, 4 4 16 operational procedure
level tool box & training.
training
Slippery – Body injury Housekeeping Working at heights safe Safety Dept
rainy season 3 3 9 operational procedure
or un proper & training.
PPE
Contact with Skin / eye illness Full P.P.E Refer to MSDS and Safety Dept
paint / or irritation Compliance, 5 1 5 keep a copy for site
kerosene tool box personnel reference.
training
Paint Skin / eye illness Full P.P.E Refer to MSDS and Safety Dept
splashing or irritation Compliance, 5 1 5 keep a copy for site
tool box personnel reference.
training

Page 10 of 12
Prepared by: PALANITHARAN 0134809027
7. ROOF TRUSS WORK
HAZARD IDENTIFICATION RISK ASSESSMENT RISK CONTROL

Work Hazard Which can Existing Risk Likelihood Severity Risk Recommended control PIC
Activity cause / effect Control measure ( Due Date /
(if any) Status )
Roof truss Falling from Extensive body Full P.P.E Working at heights safe Safety Dept
work height – injury / Fatal Compliance, 4 4 12 operational procedure
(Future human tool box & training.
activity) training
Sharp edges Body injury Eliminate Random inspection and Safety Dept
3 2 6 worn proper PPE.
Knocking by Body injury Full P.P.E Make crane having Safety Dept
swinging Compliance, 4 3 12 valid PMA & driver
object while tool box competent license valid
hoisting training / critical lift inspection.
Falling object Extensive body Full P.P.E Working at heights safe Safety Dept
from height injury / Fatal Compliance, 4 3 12 operational procedure
tool box & training.
training

Page 11 of 12
Prepared by: PALANITHARAN 0134809027
8. HOT WORK
HAZARD IDENTIFICATION RISK ASSESSMENT RISK CONTROL

Work Hazard Which can Existing Risk Likelihood Severity Risk Recommended control PIC
Activity cause / effect Control measure ( Due Date /
(if any) Status )
Hot work Spark / Fire - Burn injury to Remove Wear leather hand Site Supervisor
Contact with body and property flammable 2 4 8 gloves and goggles,
flammable damage material, wear place fire extinguisher
material goggles at work place

Page 12 of 12
Prepared by: PALANITHARAN 0134809027