SGS MINERALS SERVICES – T3 SGS 176 04-2005

FLOWSHEET DEVELOPMENT
METALLURGICAL Developing and testing the most
effective processing flowsheet reduces
OPERATIONS the technical risk associated with metal
SGS’ experienced team of metallurgical recovery. SGS’ metallurgical groups’
professionals develops and demonstrates flowsheets are recognized by the global
bankable flowsheets and processes for financial community for their quality and
environmentally sustainable metal and the integrity of their recommendations.
mineral extraction processing. These For new projects, flowsheet development
flowsheets are confirmed on-site through precedes much more costly activities
bench and pilot plant testing programs such as feasibility-stage pilot plant
that are internationally recognized by testing. It provides the flexibility to assess
the mining, engineering and financial a wide variety of reagents, dosages,
communities. residence times etc to ensure optimal
With SGS, your metallurgical testing grade and recovery.
program will: Existing plants must, at times,
•• Result in a practical, cost effective, reevaluate their processing strategies.
environmentally sound flowsheet. Changes in ore-type, technology or
•• Provide data for capital and operating environmental regulations can mean
that existing flowsheets must be fine FLOWSHEET DEVELOPMENT IS THE BEST
cost estimates.
•• Generate higher value through tuned or even significantly revised. WAY TO:
improved recovery or cost savings. Compared to the cost of evaluating •• Develop a practical, cost effective
•• Provide bankable milestones to such operational parameters at the pilot environmentally sound flowsheet.
maximize financing options. stage or operational stage (after capital •• Quantify and minimize the effect of
acquisition), comprehensive testing at ore variability.
the conceptual or flowsheet development •• Generate higher value through energy
THE PROCESS stage can be exceedingly inexpensive. optimization improved recovery or
Flowsheet development is typically cost savings.
performed at the laboratory “bench”. TYPICAL TEST WORK ACTIVITIES •• Minimize risk associated with pilot
Based on the initial determination of THAT CAN BE UNDERTAKEN DURING testing or process changes.
specific ore parameters (e.g. grain size, FLOWSHEET DEVELOPMENT: •• Reduce environmental costs with
mineralogy), the various options that proper integrated design rather than
•• Conceptual or scoping studies. expensive end-of-pipe retrofit.
might be applicable are evaluated. A
•• Metallurgical mapping. •• Provide bankable milestones to
conceptual flowsheet is developed which
•• Evaluation of processing options. maximize financing options.
is further tested and optimized. Clearly, an
•• Determine optimal operational
independent facility with a wide range of
parameters.
expertise such as SGS is well suited for
•• Development of new processing
this type of work.
technologies when warranted.
•• Evaluation of processing options that
are environmentally sustainable and
meet legislated requirements in any
jurisdiction
SGS MINERALS SERVICES – T3 SGS 176 2

WHAT TO EXPECT HOW IS YOUR PROJECT MANAGED?


WHEN YOU BEGIN A Depending on the scope of work,
METALLURGICAL TESTING flowsheet development projects
are managed by a project or senior
PROGRAM metallurgist. Interim results are forwarded
Tips and rules of thumb for flowsheet in a timely manner. A written report will
development and pilot plant testing... be issued at the completion of the project
or at the end of each phase.
WHAT IS THE PROCESS? All project managers have access to SGS’
With you and your consultants, SGS technical experts. These world-class
professionals will custom design your leaders provide technical consultation in
project team, then develop a realistic their respective disciplines and are always WHERE CAN I GET SERVICES?
scope of work that suits your objectives. available to solve difficult problems.
SGS offers a global footprint to help
Processing options will be evaluated fairly For some projects, it makes sense to run meet your testing needs. For logistical
and objectively, without bias or special the project at one SGS site and build an and staffing reasons, we have nodes
interests to ensure the best technology integrated team consisting of SGS staff of expertise situated throughout our
is used. Many of our project managers from across our international offices. In operations. Depending on your needs, we
have had plant experience, so they favor this way, your project can benefit from the will work with you to meet your timing
practical solutions and reject unrealistic best expertise and equipment available. and project requirements.
options.
HOW MUCH SAMPLE IS NEEDED? SAMPLE OWNERSHIP
YOUR INPUT
While each case has to be evaluated You retain ownership of all samples and
At SGS, we think effective management individually, typical samples volumes rejects or test products sent to SGS for
of metallurgical projects is best achieved required are below. testing. This also means that you have the
by encouraging your participation (or ultimate responsibility for their return or
that of your representatives) from HOW LONG WILL IT TAKE? disposal.
flowsheet development to pilot plant
It is obviously difficult to say how long a The Project Manager will provide you
testing. This creates a continuous flow
project will take due to sample availability, with a list of all your materials (samples,
of information and ideas and insures that
ore complexity, etc, but minimum time assay and test rejects) that remain at the
your requirements are met in timely and
lines are below. end of the project. Please let us have your
satisfactory manner.
instructions for these samples within 30
During flowsheet development, it can
Early in the planning and proposal days. If we do not hear from you, we will
make sense to phase projects, creating
preparation stages, we encourage you to store the samples for 3 months and then
a series of milestones that are useful for
discuss your timing, anticipated project dispose of them for you.
financial purposes. If this seems right for
scope and financial requirements. This
your project, please let us know.
allows us to develop the best program
for you, be it a phased program with a
number of bankable milestones that will
help you maximize your financing options, FLOWSHEET DEVELOPMENT PILOT PLANT TESTING
or perhaps an intensive program that
quickly resolves bottleneck problems. 40-50 kg 200 kg – 2 tonnes

Discussion and consultation continues (composites preferred) (4-6 composites)


throughout the test program. During FLOWSHEET DEVELOPMENT PILOT PLANT TESTING
critical periods or intensive testing,
such as complex pilot plant campaigns, Typical Minimum 6 Weeks – 3 Months 3 Months
many of our clients elect to stay in the
Planning 2 Weeks
immediate vicinity and “work the shifts”
with our staff (see below, “logistics”). Set-up and Tear-down 1 – 2 Weeks
The project insights and expertise sharing
Piloting 3 – 5 Weeks
that arises can be very valuable at start-
up. In these circumstances, SGS can offer Reporting 4 – 8 Weeks
office and meeting spaces for your use.
SGS MINERALS SERVICES – T3 SGS 176 3

SAMPLE STORAGE In addition, we operate a variety of At SGS, waste is directed to a fully


operational activities such as employee permitted tailings pond. Our other
SGS has a variety of ways to store your
health monitoring programs (hearing, facilities have waste disposal systems
samples before, during and after your
blood lead, silica, others as needed), that comply fully with local regulations.
testing program:
designated substance monitoring On-site environmental conditions are
•• Ambient temperature storage (varies programs, dust collection systems, carefully monitored. Responsibilities are
from -20°C to 35°C with variable MSDS-based worker information data clearly outlined for management and
humidity) is suitable for most bases to ensure health and safety in employees. Participation is mandatory.
samples our workplace. These protocols will Standards and operating procedures are
•• Freezer storage is appropriate for operational during any anticipated documented and followed, so that our
sulphide rich samples that might operations. We appreciate any Policy is maintained. While we appreciate
oxidize readily involvement or contributions other parties any involvement or contributions that
•• Heated storage is needed for laterites might make in this area but we, SGS, other parties might make in this area, SGS
Sample storage is based on type of are committed to this, our corporate knows that this is our responsibility.
storage needed (frozen, ambient or responsibility.
heated), length of time stored and the
storage media (pails, drums etc). ON-SITE OPERATIONS: ENVIRONMENTAL
ASPECTS
ON-SITE OPERATIONS: HEALTH AND
SGS‘ internal environmental policy insists
SAFETY that sustainable environmental practices
Health and Safety is an important are given top priority. As well, SGS is
consideration for SGS. All visitors to a co-signee to the CIM Environmental
our site are bound by our health and Policy Statement, which promotes
safety policies, including clients or their environmentally sustainable operations in
representatives such as consultants the mining and exploration industries.
or engineering firms and suppliers and
contractors.
© 2005 SGS Société Générale de Surveillance SA – All rights reserved

CONTACT INFORMATION
Email us at minerals@sgs.com
www.sgs.com/mining