Professional Documents
Culture Documents
NOVEMBER DECEMBER
Week 2 Week 3 Week 4 Week 1 Week 2
Day 10-16 Day 17-23 Day 24-30 Day 1-7 Day 8-14
SEMINARS
CATEGORY EVENT
7th IECEP Laguna
OUTSIDE CAMPUS SEMINAR General Assembly
College of Engineering
General Assembly
IN HOUSE SEMINAR
The Impact of Social
Media on Mental Health
Thesis Statistics
Electronic Products
TECHNICAL Assembly and Servicing
NC II
MINOR TRIP
COMPANY NAME
Toshiba Information Equipment (Philippines),
Inc. (TIP)
Ionics EMS, Inc
ROHM Electronics Philippines Inc
ON Semiconductor
PLDT
SMART Communications, Incorporated
ABS-CBN Corporation
GMA Network, Inc.
DOST-Advanced Science and
Technology Institute
MAJOR TRIP
LOCATION
Clark, Pampanga
Subic
Baguio
of Field Trips and Seminars
SEMINARS
MINOR TRIP
MAJOR TRIP