Professional Documents
Culture Documents
1,299,357.93
65%
32,941.10
844,017.69
2,391,008.55
Columns, Walls, Parapets and the likes:
a) Concrete 4,593.50 m3 3,488.76 675,959.32
c) Shuttering 36,576.60 m2
Suspended Beams and Slabs, drop panels
a) Concrete 12,416.00 m3 11,169.00 2,164,032.38
c) Shuttering 59,575.41 m2
Staircases including the following:
a) Concrete 253.00 m3 23.73 4,597.77
c) Shuttering 1,237.74 m2
Overall Contract Price (Tenderer to provide details)
b) Reinforcement 974,116.77 kgs
14,681.49 2,844,589.47
a) Concrete 17,262.50
b) Reinforcement 1,870,472.70 974,116.77
c) Shuttering 97,389.75
2,844,589.47
164.78 193.75