Kranich 3000 Sri Lanka Control plan for assembly

23 2011 3566

Slewing gantry crane


with rope luffing system
12,5/25/50/90/160 t x 52,5/48/48/40/26 ...14 m

19.07.2012
11015 KM 1
© Copyright by KIROW ARDELT GmbH 2012
Kranich 3000 Sri Lanka Control plan for assembly
23 2011 3566

Crane type: Slewing gantry crane with rope luffing system


12,5/25/50/90/160 t x 52,5/48/48/40/26 ... 14 m
Order No.
of the supplier: 23 2011 3566

Year of production: 2011

Contract-No.:

Trans-No.:

Acceptance date
by assembly management:

Confirmation:
Site Manager Crane operator

Table of contents: Control plans - steel structure (S) page 3-4


Control plans - mechanical engineering (M) page 5 - 16
Control plans – speeds of mechanisms (T) page 17

Main measuring devices: folding rule, measuring tape of steel, vernier caliper,
feeler gauge

Special measuring devices: see control plan

Except for the registration of the control results, objections arising during the assembly are to be
likewise noted in the control plan.

The observance of the rated values and controls prescribed in the control plan are to be
confirmed.

The control plan is to be filled out in 3 copies:

1 copy receives the assembly management


1 copy receives the crane operator
1 copy is to be handed over by the crane operator to the manufacturer after commissioning of
the crane.

19.07.2012
11015 KM 2
© Copyright by KIROW ARDELT GmbH 2012
Kranich 3000 Sri Lanka Control plan for assembly
23 2011 3566

Group: Steel structure


Ser. Inspection procedure Measured values Special Recommended
No. rated actual measuring inspection
devices procedure

S1 Check the laying of the levelling according to


crane track instrument drawing
11015-0000-
000-0-1-A0

S2 Observance to the prescribed visual inspection


conservation

S3 Checking of tight fit of all visual inspection


bolts

S4 Checking of the observed torque according to


tightening moment of high-strength wrench inspection plan
connections or
rotation angle
method

S5 Execution of the assembly weld visual inspection


of the components acc. to the
drawing

S6 Filling the ballast into the gantry 110000kg certificate


acc. to the drawingl

S7 Filling in the counterweight into the 225000kg certificate


machinery house platform

19.07.2012
11015 KM 3
© Copyright by KIROW ARDELT GmbH 2012
Kranich 3000 Sri Lanka Control plan for assembly
23 2011 3566

Group: Steel structure


Ser. Inspection procedure Measured values Special Recommended
No. rated actual measuring inspection
devices procedure

S8 Installation of the bolt connections visual inspection


acc. to the drawing
supporting structure-support:

1. supporting structure-front wall –


machinery house platform

2. supporting structure-front wall -


supporting structure-tension
member

3. machinery house platform -


supporting structure-tension
member

S9 Checking of all gates for visual inspection


functioning

19.07.2012
11015 KM 4
© Copyright by KIROW ARDELT GmbH 2012
Kranich 3000 Sri Lanka Control plan for assembly
23 2011 3566

Group: Main hoisting gear


Ser. Inspection procedure Measured values Special Recommended
No. rated actual measuring inspection procedure
devices

M1 Check of function of the disk according to operating manual


brake and adjustment of the hoisting gear for disk brake
brake moment drawing type RST 2

M2 Function of the safety brake according to Operating instruction


Check of opening gap drawing for safety brake
Check of hydraulic system system SHI 252

M3 Check of contact surfaces of the 90 % at least re-align, if necessary


brake shoes

M4 Function of the overload safety


device drawing
overload safety device

M5 Check of the mechanical parts


of the overload safety device visual inspection
for free movement

M6 Function of the rope movability of the


pressure device rollers and levers

M7 Switch points of limit switches tape according to


(Check of function) measure general crane
drawing

19.07.2012
11015 KM 5
© Copyright by KIROW ARDELT GmbH 2012
Kranich 3000 Sri Lanka Control plan for assembly
23 2011 3566

Group: Main hoisting gear


Ser. Inspection procedure Measured Special Recommended
No. values measuring inspection procedure
rated actual devices

M8 Check of the slack rope functional test


switching-off

M9 Check tightening moments torque according to


of pre-stressed bolts wrench Control plan for
bolts and drawings
mentioned in it

M 10 Check of all fastening bolts visual inspection


for loosening

M 11 Check of lubrication and oil level according to


lubrication plan

M 12 Tightness of gears visual inspection


Tightness of the hydraulic system of
the safety brake

M 13 Observance to the prescribed visual inspection


conservation

19.07.2012
11015 KM 6
© Copyright by KIROW ARDELT GmbH 2012
Kranich 3000 Sri Lanka Control plan for assembly
23 2011 3566

Group: Auxiliary hoisting gear


Ser. Inspection procedure Measured values Special Recommended
No. rated actual measuring inspection procedure
devices

M1 Check of function of the disk according to operating manual


brake and adjustment of the drawing for disk brake
brake moment type RST 2

M2 Check of contact surfaces of the 90 % at least re-align, if necessary


brake shoes

M3 Function of the overload safety


device drawing
overload safety device

M4 Check of the mechanical parts


of the overload safety device visual inspection
for free movement

M5 Function of the rope movability of the


pressure device rollers and levers

M6 Switch points of limit switches tape according to


(Check of function) measure general crane
drawing

19.07.2012
11015 KM 7
© Copyright by KIROW ARDELT GmbH 2012
Kranich 3000 Sri Lanka Control plan for assembly
23 2011 3566

Group: Auxiliary hoisting gear


Ser. Inspection procedure Measured Special Recommended
No. values measuring inspection procedure
rated actual devices

M7 Check of the slack rope functional test


switching-off

M8 Check tightening moments torque according to


of pre-stressed bolts wrench Control plan for
bolts and drawings
mentioned in it

M9 Check of all fastening bolts visual inspection


for loosening

M 10 Check of lubrication and oil level according to


lubrication plan

M 11 Tightness of gears visual inspection

M 12 Observance to the prescribed visual inspection


conservation

19.07.2012
11015 KM 8
© Copyright by KIROW ARDELT GmbH 2012
Kranich 3000 Sri Lanka Control plan for assembly
23 2011 3566

Group: Slewing gear


Ser. Inspection procedure Measured Special Recommended
No. values measuring inspection procedure
rated actual devices

M1 Performance of the double acc. to slewing according to


shoe brake and adjusting the gear drawing assembly and
brake torque operating
instructions for
drum brakes
type EBE

M2 Contact pattern Indian ink approximately


of the pinion teeth and centrally to the
the roller bearing ring depth and width of
teeth; at least 75%
of the tooth width

M3 Check of all fastening bolts


visual inspection
on loosening

M4 Check pre-stressed bolts for torque according to


tightening moments and check pre- wrench screw inspection
stressing force or hydraul. scheme and
tightening drawings
device mentioned in it

M5 Lubrication and oil filling acc. to lubrication plan

M6 Lubrication and oil filling visual inspection

M7 Observation of prescribed
visual inspection
conservation

19.07.2012
11015 KM 9
© Copyright by KIROW ARDELT GmbH 2012
Kranich 3000 Sri Lanka Control plan for assembly
23 2011 3566

Group: Luffing gear


Ser. Inspection procedure Measured values Special Recommended
No. rated actual measuring inspection procedure
devices

M1 Check of function of the disk according to operating manual


brake and adjustment of the hoisting gear for disk brake
brake moment drawing type RST 1

M2 Function of the safety brake according to Operating instruction


Check of opening gap drawing for safety brake
Check of hydraulic system system SHI 232

M3 Check of contact surfaces of the 90 % at least re-align, if necessary


brake shoes

M4 Function of the rope movability of the


pressure device rollers and levers

M5 Radius indicator tape functional test


Adjustment of the measuring measure
system

M6 Switch point of the preliminary limit tape acc. to Adjustment


switch acc. to radius indicator measure instruction

M7 Switch point of the main limit tape acc. to Adjustment


switch acc. to radius indicator measure instruction

M8 Switch point – laying down of the jib acc. to functional test

19.07.2012
11015 KM 10
© Copyright by KIROW ARDELT GmbH 2012
Kranich 3000 Sri Lanka Control plan for assembly
23 2011 3566

Group: Luffing gear


Ser. Inspection procedure Measured Special Recommended
No. values measuring inspection procedure
rated actual devices

M9 Check tightening moments torque according to


of pre-stressed bolts wrench Control plan for
bolts and drawings
mentioned in it

M 10 Check of all fastening bolts visual inspection


for loosening

M 11 Check of lubrication and oil level according to


lubrication plan

M 12 Tightness of gears visual inspection


Tightness of the hydraulic system of
the safety brake

M 13 Observance to the prescribed visual inspection


conservation

19.07.2012
11015 KM 11
© Copyright by KIROW ARDELT GmbH 2012
Kranich 3000 Sri Lanka Control plan for assembly
23 2011 3566

Group: Gantry travelling gear


Ser. Inspection procedure Measured values Special Recommended
No. rated actual measuring inspection procedure
devices

M1 Check of the bevel-gear according to the according to


motors drawing of the operating manual of
gantry travelling Motor DRS100LC4 and
gear bevel-gear
Type KV97/T

M2 Rail clamp performance functional test

M3 Observance to the free profile according to


for the rail clamp crane composition

M4 Switch point of functional test


travelling gear limit switching

M5 Check of all fastening bolts visual inspection


for loosening

M6 Tightening moments of the torque according to the


fastening wrench Control plan for bolts
bolts with torque

M7 Lubrication and oil filling according to


Lubrication
instruction

M8 Tightness of gears visual inspection

M9 Observance to the prescribed visual inspection


conservation

19.07.2012
11015 KM 12
© Copyright by KIROW ARDELT GmbH 2012
Kranich 3000 Sri Lanka Control plan for assembly
23 2011 3566

Group: Rope system and hinged points


Ser. Inspection procedure Measured Special Recommended
No. values measuring inspection procedure
rated actual devices

M1 Correct laying of rope (rope with visual inspection


right-hand lay on drum with left-
hand rise and in vice versa)

M2 Free movement of ropes visual inspection


in all positions of jib

M3 Rope protection of the rope visual inspection


sheaves, free movement

M4 Function of the rope sheaves visual inspection

M5 Set of rope sheaves jib - main hoist

M6 Set of rope sheaves jib - auxiliary hoist

M7 Set of rope sheaves jib Einziehwerk

M8 Set of rope sheaves jib - auxiliary hoist execution acc. to


drawing

M9 Set of rope sheaves


supporting structure - main hoist

M 10 Set of rope sheaves visual inspection


supporting structure - auxiliary hoist

M 11 Bearing jib - platform

M 12 Set of rope sheaves


supporting structure
with compensation lever

M 13 Rope inlets

19.07.2012
11015 KM 13
© Copyright by KIROW ARDELT GmbH 2012
Kranich 3000 Sri Lanka Control plan for assembly
23 2011 3566

Group: Rope system and hinged points


Ser. Inspection procedure Measured Special Recommended
No. values measuring inspection procedure
rated actual devices

M 14 Laying down of jib functional test

M 15 Bottom block – functional test


main hoist
auxiliary hoist
Load hook safety device

M 16 Check of all fastening bolts for visual inspection


tight fit

M 17 Check of the tightening moments according to Control


of all pre-stressed bolts plan for bolts and
the drawings
mentioned in it

M 18 Lubrication according to the


Lubrication plan

M 19 Observance of the prescribed visual inspection


conservation

19.07.2012
11015 KM 14
© Copyright by KIROW ARDELT GmbH 2012
Kranich 3000 Sri Lanka Control plan for assembly
23 2011 3566

Cable drum arrangement subassembly


Ser. Inspection procedure Measured Special Recommended
No. values measuring inspection procedure
rated actual devices

M1 Function of motor cable drum see documentation


on motor cable drum

M2 Check of tight fit of motor visual inspection


cable drum

M3 Tight fit of the guiding device visual inspection

M4 Function of the guiding device visual inspection

M5 Check all fastening bolts for see documentation


tight fit on motor cable drum

M6 Lubrication of the sub-assembly see documentation


on motor cable drum

M7 Observance to the prescribed visual inspection


conservation

M8 Check of the limit switching visual inspection


crane travelling way

19.07.2012
11015 KM 15
© Copyright by KIROW ARDELT GmbH 2012
Kranich 3000 Sri Lanka Control plan for assembly
23 2011 3566

Group: Accessories
Ser. Inspection procedure Measured Special Recommended
No. values measuring inspection procedure
rated actual devices

M1 Installation of nameplates acc. visual inspection


to the drawing

M2 Assembly of the rope inlets acc. to visual inspection


the drawing (machinery house roof)

M3 Assembly of the repair crane visual inspection


acc. to the drawing functional test

M4 Assembly of the slip ring body visual inspection


attachment
acc. to drawing

M5 Check of all fastening bolts for visual inspection


tight fit

M6 Execution of the assembly welds visual inspection


acc. to the drawing

M7 Observance of the prescribed visual inspection


conservation

19.07.2012
11015 KM 16
© Copyright by KIROW ARDELT GmbH 2012
Kranich 3000 Sri Lanka Control plan for assembly
23 2011 3566

Group: Speeds of mechanisms

According to the Acceptance program

19.07.2012
11015 KM 17