Project Name [Project name]


Inspection Checklist Earthing
Project Number [Project number]
Client [Client name] WBS ID [WBS ID] Date [Date]
Client’s Repres. [Client representative name]
Contractor [Contractor name] Reference Doc [Drawing etc. against which is inspected]
ITR No. [Checklist to be attached to ITR no. …]
Location [Area]
Work Executor Contractor
Item Remarks
Checked (initials & Date) Hold Point Inspected (initials & Date)
1.0 Prior Installation
1.1 Material approved W  H
1.2 Material inspected upon delivery W  H
1.3 Material free of damage W  H
2.0 During Installation
2.1 Installation following correct methodology & plan W  H
2.2 Connections executed correct & firmly W  H
3.0 After Installation
3.1 Test equipment calibrated W  H
3.2 Resistivity checked and noted W  H
Earthing Point Continuity Test Result Date Remarks Earthing Point Continuity Test Result Date Remarks

01 08

02 09

03 10

04 11

05 12

06 13

07 14

Work Executor Contractor Acceptance Client Acceptance


Name Name Name
Signature Signature Signature
Date Date Date

Hold Point: W = Witness (work may proceed after rectification), H = rectify and re-inspect 0120(0) Inspection-Checklist-Earthing