KETERANGAN / CATATAN

- NOTES :
1. METRIC UNITS USED THROUGHOUT.
250 600 400 500 ALL DIMENSIONS IN MILLIMETERS (mm)
UNLESS NOTED OTHERWISE (U.N.O).
2. LEVELS IN METERS WITH REFERENCE.
3. LEAN CONCRETE 100mm Thk : K-100
15 4. ALL DIMENSION HERE IN ARE SUBJECT TO CHANGE
10
16 15 AS PER SITE CONDITION.
10 11
5. CONCRETE GRADE:
5 B 11
10
17

450

400

700
300
1 2 5 6
- 10 17 - PILECAP & TIE BEAM ; FC'= 25 MPA
2 6 17
17 - SLABS ON GRADE ; FC'= 32 MPA
1
- COLUMNS
16
BASEMENT 1 & BASEMENT 2 ; FC'= 55 MPA
GROUND FLOOR, 1ST FLOOR & 2ND FLOOR ; FC'= 35 MPA
6. STEEL GRADE BJTD40
7. CONCRETE COVER:
A C D - PILE CAP = 50MM FOR BOTTOM, SIDES AND TOP
- - - (TOP LAYER BELOW OF THE SLAB REINFORCEMENT)
- PIT COVER = 40MM
COLUMN TYPE AA COLUMN TYPE AB COLUMN TYPE AE COLUMN TYPE AF - SLAB TOP COVER = 20MM INTERNAL, 40MM EXTERNAL
SCALE 1 : 20 SCALE 1 : 20 SCALE 1 : 20 SCALE 1 : 20 - TIE BEAM & BEAM = 40MM TO TIES
- COLUMN = 40MM TO TIES
(COLUMN C47) (COLUMN C48) (COLUMN C78) (COLUMN C51) - SHEAR WALL = 40MM
9. THIS DRAWING PRODUCE IN CROSS REFERENCE
WITH STRUCTURAL IFC DRAWING :
DWG NO. -17025-FD-S-1-0300-D AND 0400-C
-17025-FD-S-1-0151-D,152-C, 0161-D, 162-C AND 163-C

600 600
DENAH KUNCI / KEY PLAN
8 7 8
4 4 4

2180
2020
GF Slab
450 700
GF GF GF BASEMENT 1
3 33 CJ CJ 18 18 GF Beam
18 No. PERUBAHAN / REVISION TGL / DATE
GF Slab GF Slab GF Slab

GF Beam GF Beam GF Beam


CJ CJ

760
00 FOR CONSTRUCTION 13 August 2019
Pemilik/Owner :
760

880
640

18 18 18

3 33 4 4 4 87 8
Reinforcement Reinforcement Reinforcement Reinforcement
Column B2 Column B2 Column B2 Column B2
Proyek/Project :

CJ
B1
CJ
B1
CJ
B1
CJ
B1 IKEA - 2
B1 Slab B1 Slab B1 Slab B1 Slab
JAKARTA GARDEN CITY
B1 Beam B1 Beam B1 Beam B1 Beam EPCM
Manajemen Konstruksi
400

SECTION A SECTION B SECTION C SECTION D South Quarter, Tower C 5th Floor


SCALE 1:50 - SCALE 1:50 - SCALE 1:50 - SCALE 1:50 - JL R.A Kartini - Jakarta Selatan

Konsultan M&E/Mechanical & Electrical Consultant :


Type AA Type AB Type AE Type AF
Bar schedule - bending shapes Bar schedule - bending shapes Bar schedule - bending shapes Bar schedule - bending shapes SUSTAINABLE BUILDING CONSULTANTS
JL. PEJATEN BARAT II No. 20 BLOK E
Pasar Minggu - Jakarta Selatan 12510, Indonesia
Phone : (62-21) 719 1044 / 719 1045

Mark Pcs ø Single Dimensioned bending shape Total Mass Mark Pcs ø Single Dimensioned bending shape Total Mass Mark Pcs ø Single Dimensioned bending shape Total Mass Mark Pcs ø Single Dimensioned bending shape Total Mass Fax : (62-21) 7179 3736
E-mail : floth@flothindonesia.com
length (not to scale) length length (not to scale) length length (not to scale) length length (not to scale) length
Konsultan Arsitektur/Architect Consultant :
[mm] [m] [m] [kg] [mm] [m] [m] [kg] [mm] [m] [m] [kg] [mm] [m] [m] [kg]

4 12 19 4.99 59.88 133.23 PT. ANGGARA ARCHITEAM


ARCHITECTURE DESIGNERS
1 28 10 1.35 37.80 23.28 7 4 22 5.21 20.86 62.23 15 28 10 2.35 65.80 40.53 Jl. Tebet Barat II No.12B, Jakarta 12810 - INDONESIA
PH : (021)83706091, 83705334, FAX : (021)83701757
E-mail : adm@anggara.co.id

5 29 10 1.75 50.75 31.26 Konsultan Struktur/Structure Consultant :


2 28 10 0.47 13.02 8.02 16 28 10 0.92 25.62 15.78
8 4 22 5.22 20.88 62.32 Indonesia
PT TTW Indonesia Consulting Engineers
Graha Chantia L3 JI Bangka Raya No.6 Jakarta Selatan 12720 Indonesia
17 56 10 0.71 40.04 24.66 T: +6221 719 0011 F: +6221 719 0877 ttw@ttwindonesia.com
3 8 16 3.13 25.04 39.54 6 29 10 0.52 14.94 9.20
Kontraktor Utama/Main Contractor :
9 4 22 5.22 20.88 62.29
18 20 19 2.79 55.80 124.16 PT. BAM DECORIENT INDONESIA
General Contractor
Gedung Menara Jamsostek, Lt. 20
Jl. Jendral Gatot Subroto No. 38
Total mass [kg] : 70.84 Total mass [kg] : 173.69 Jakarta 12170
10 50 10 0.61 30.75 18.94
Nama Gambar/Drawing Title :

11 25 10 1.55 38.75 23.87 Total mass [kg] : 205.13


COLUMN REINFORCEMENT
BASEMENT 1 PART 6

12 4 10 -X- 7.01 4.32 SHOP DRAWING


Oleh/By init. sign. Tanggal/Date
NOTES :
- COLUMN AND WALL LAYOUT BASEMENT 1 REFER TO DRAWING IK2-BAM-B1-SC-D-6031, 6041, 6051, 6061 Digambar/Drawn IHI 13 August 2019
- REBARS COLUMN LEVEL B2 REFER TO DRAWING IK2-BAM-B2-SC-D-6600 TO IK2-BAM-B2-SC-D-6608 13 4 10 -X- 2.95 1.82 Diperiksa/Checked NWI 13 August 2019
Diperiksa/Checked GFS

PROVIDE 25MM CHAMFER 14 4 10 -X- 2.38 1.46 Diperiksa/Checked

Diperiksa/Checked
TO ALL COLUMN CORNER Disetujui/Approved MRA
Project No./ Drawing No./ Scale/
0 0.2 0.4 0.6 0.8 1 Metres 0 0.5 1 1.5 2 2.5 Metres No. Proyek No. Gambar Skala Rev
Total mass [kg] : 237.25
Scale 1:20 @A1 Scale 1:50 @A1 1:20
P10065 IK2-BAM-B1-SC-D-6605
1:50
00

A1 (841 x 594mm)