KETERANGAN / CATATAN

- -
- NOTES :
1. METRIC UNITS USED THROUGHOUT.
500 ALL DIMENSIONS IN MILLIMETERS (mm)
500
UNLESS NOTED OTHERWISE (U.N.O).
2. LEVELS IN METERS WITH REFERENCE.
700 3. ELEVATION
- EL = EXCAVATION LEVEL
400 - SL = STRUCTURE LEVEL
- FFL = FINISH FLOOR LEVEL
- BEL = BOTTOM EXCAVATION LEVEL
10
21 23 4. LEAN CONCRETE 100mm Thk : K-100
7 8
66 10 10 23 21
5. ALL DIMENSION HERE IN ARE SUBJECT TO CHANGE
7 12 AS PER SITE CONDITION.
10 12
6. CONCRETE GRADE:

700
1000

1100
10
300

- -
10 - PILECAP & TIE BEAM ; FC'= 25 MPA

1100
-
2
A C
2
- - 7
7
10 -
- SLABS ON GRADE ; FC'= 32 MPA
- COLUMNS
7
7 17 BASEMENT 1 & BASEMENT 2 ; FC'= 55 MPA
10 GROUND FLOOR, 1ST FLOOR & 2ND FLOOR ; FC'= 35 MPA
15
8
17 7. STELL GRADE BJTD40
19
8. CONCRETE COVER:

500
19 16
- PILE CAP = 50MM FOR BOTTOM, SIDES AND TOP
- D (TOP LAYER BELOW OF THE SLAB REINFORCEMENT)
17 - - PIT COVER = 40MM
- SLAB TOP COVER = 20MM INTERNAL, 40MM EXTERNAL
- TIE BEAM & BEAM = 40MM TO TIES
B E - COLUMN = 40MM TO TIES
- - - SHEAR WALL = 40MM

STARTER BAR COLUMN TYPE D STARTER BAR COLUMN TYPE E STARTER BAR COLUMN TYPE H STARTER BAR COLUMN TYPE J STARTER BAR COLUMN TYPE M
9. THIS DRAWING PRODUCE IN CROSS REFERENCE
WITH STRUCTURAL IFC DRAWING :
SCALE 1 : 20 SCALE 1 : 20 SCALE 1 : 20 SCALE 1 : 20 SCALE 1 : 20 DWG NO. -17025-FD-S-1-0151-C,152-B, 0161-C, 162-C AND 163-B
-17025-FD-S-1-0200-C
(Column C15) (Column C4) (Column C4) (Column C30, C33 and C39) (Column C27, C28 and C35)
DENAH KUNCI / KEY PLAN

1100 1000

5 5 5 700 18 18 18

400
11 11 11
1100
1 1 1

20 20 20
BASEMENT 2
1100

1100
950
800

No. PERUBAHAN / REVISION TGL / DATE

1100
B2 B2 B2 B2
CJ CJ CJ CJ

CJ CJ CJ CJ

B2
CJ 00 FOR CONSTRUCTION 15 May 2019
Pemilik/Owner :
CJ

11
Proyek/Project :
11 11
IKEA - 2
1
5 18
Pilecap 5 18

JAKARTA GARDEN CITY


11
Tie beam 5 Tie beam 18
Pilecap
Tie beam Tie beam Konsultan M&E/Mechanical & Electrical Consultant :
Pilecap Pilecap
20 20
SECTION A SECTION B SECTION C SECTION D Tie beam Tie beam
SCALE 1:20 - SCALE 1:20 - SCALE 1:20 - SCALE 1:20 - 20 SUSTAINABLE BUILDING CONSULTANTS
JL. PEJATEN BARAT II No. 20 BLOK E
Pasar Minggu - Jakarta Selatan 12510, Indonesia
Pilecap Phone : (62-21) 719 1044 / 719 1045

Type D Type E Type H Type J Fax : (62-21) 7179 3736

SECTION E E-mail : floth@flothindonesia.com

Bar schedule - bending shapes Bar schedule - bending shapes Bar schedule - bending shapes Bar schedule - bending shapes SCALE 1:20 -
Konsultan Arsitektur/Architect Consultant :

Mark Pcs ø Single Dimensioned bending shape Total


length
Mass Mark Pcs ø Single Dimensioned bending shape Total Mass Mark Pcs ø Single Dimensioned bending shape Total Mass Mark Pcs ø Single Dimensioned bending shape Total Mass Type M PT. ANGGARA ARCHITEAM
ARCHITECTURE DESIGNERS
length (not to scale) length (not to scale) length length (not to scale) length length (not to scale) length
Bar schedule - bending shapes
Jl. Tebet Barat II No.12B, Jakarta 12810 - INDONESIA
PH : (021)83706091, 83705334, FAX : (021)83701757
[mm] [m] [m] [kg] [mm] [m] [m] [kg] [mm] [m] [m] [kg] [mm] [m] [m] [kg] E-mail : adm@anggara.co.id

10 32 10 0.92 29.28 18.04 15 12 16 1.30 15.60 24.63 Konsultan Struktur/Structure Consultant :


1 8 16 1.99 15.88 25.07 5 24 22 2.75 66.00 196.94
Mark Pcs ø Single Dimensioned bending shape Total Mass
141
length (not to scale) length Indonesia
11 24 19 2.44 58.44 130.03 PT TTW Indonesia Consulting Engineers
[mm] [m] [m] [kg]
16 12 16 1.32 15.86 25.05 Graha Chantia L3 JI Bangka Raya No.6 Jakarta Selatan 12720 Indonesia
T: +6221 719 0011 F: +6221 719 0877 ttw@ttwindonesia.com

203

182
2 7 10 1.28 8.96 5.52 6 9 10 3.15 28.35 17.46 20 26 22 2.75 71.50 213.36
133 Kontraktor Utama/Main Contractor :

12 8 10 2.75 22.00 13.55 17 36 16 0.87 31.36 49.51 PT. BAM DECORIENT INDONESIA
General Contractor
7 27 10 0.72 19.33 11.91 Gedung Menara Jamsostek, Lt. 20
Total mass [kg] : 30.59 21 13 16 3.26 42.38 66.92 Jl. Jendral Gatot Subroto No. 38
Jakarta 12170
18 22 22 2.76 60.72 181.19
8 9 10 1.29 11.61 7.15 Nama Gambar/Drawing Title :
Total mass [kg] : 161.62
22 52 16 0.87 45.24 71.43 COLUMN STARTER BAR
BASEMENT 2 PART 4
19 12 16 3.06 36.72 57.98

Total mass [kg] : 233.46 23 13 16 1.49 19.36 30.56

198

196
Total mass [kg] :
SHOP DRAWING
338.36 90 105
Oleh/By init. sign. Tanggal/Date
Total mass [kg] : 382.27 Digambar/Drawn WPU 15 May 2019
Diperiksa/Checked NWI
Diperiksa/Checked GFS
Diperiksa/Checked
NOTES: Diperiksa/Checked
- TIE BEAM REINFORCEMENT, BASEMENT 2 GRID 9 - 13 REFER TO DRAWING IK2-BAM -B2-SC-D-6300 TO IK2-BAM -B2-SC-D-6304
Disetujui/Approved MRA
- PILE CAP REINFORCEMENT REFER TO DRAWING IK2-BAM -B2-SC-D-6200 TO IK2-BAM -B2-SC-D-6215
- COLUMN AND WALL LAYOUT BASEMENT 2 GRID 9 - 13 REFER TO DRAWING IK2-BAM -B2-SC-D-6023 Project No./ Drawing No./ Scale/
0 0.2 0.4 0.6 0.8 1 Metres No. Proyek No. Gambar Skala Rev
- BARBENDING SCHEDULE APPLICABLE FOR 1 @ 1 TYPE
Scale 1:20 @A1
P10065 IK2-BAM -B2-SC-D-6504 1:20 00