Generic Environmental Performance Report and Management Plan

I. ENVIRONMENTAL IMPACT MANAGEMENT AND MONITORING PLAN FOR CURRENT OPERATIONS & PROPOSED EXPANSION/MODIFICATION

Baseline Environment
Possible Environmental/ (at the time of Monitoring Parameters/
Preventive/ Mitigating Measures Remarks
Social Impacts expansion/modification Implementation
application)
LAND
 Consistency with land use Current land use w/in 1km radius (as  See attached proof of compatibility Actual land uses w/in 1km
per zoning ordinance): with land use radius:
 Residential  Limit project activities to what is  Residential
 Commercial/ Institutional compatible to the land use  Commercial/ Institutional
 Industrial  Others, specify:  Industrial
 Agricultural/ Recreational  Agricultural/ Recreational
 Protected Areas  Protected Areas
 Others, specify:  Others, specify:

Actual land uses w/in 1km radius:


 Residential
 Commercial/ Institutional
 Industrial
 Agricultural/ Recreational
 Protected Areas
 Others, specify:

 Disturbance to wildlife due to Existing vegetation in the expansion  Comply with conditions of  Annual inspection of area
vegetation clearing during area: DENR/LGU CLUP, Tree Cutting replanted/ revegetated
expansion  Forestland Permit, ROW, Permit
 Marshland  Limit land clearing as much as  Others, specify:
 Grassland
possible

 Mangrove
 Provide temporary fencing for
vegetation that will be retained
 Wetland
Page 1 of 9
Generic Environmental Performance Report and Management Plan

Baseline Environment
Possible Environmental/ (at the time of Monitoring Parameters/
Preventive/ Mitigating Measures Remarks
Social Impacts expansion/modification Implementation
application)
 Others, specify:  Promote restoration of damaged or
destroyed vegetation where
possible (e.g., tree planting);
 Others, specify:

 Land tenure/ compatibility Identify land tenure/ compatibility  Obtain the following clearances/  Regularly monitor
issue (in expansion area) issues: permits from concerned agencies: presence/absence of
 CARP ___________________________ complaints
 CADC/ CADT/ CALC/ CALT  Resettlement Plan prepared
 Regular coordination with
LGU or appropriate
 ROW  Provide relocation/disturbance agencies
 Informal settlers compensation packages  Others, specify:
 Ecologically sensitive or protected  Ensure participation of IPs in
area consultations and dialogues
 Others, specify:
 MOA prepared/signed
 Provide adequate buffer
 Others, specify:

 Change in surface landform/ Slope in expansion area: Considering the natural hazards and  Regular inspection of
topography/ terrain/slope (in  Flat (0-3%) climate projections in the area: slope protection
expansion area)  Gently sloping to rolling (3-18%)  Employ appropriate erosion control measures in erosion-
and slope protection measures prone areas
 Soil Erosion(in expansion  Steep (>18%)
 Designate a spoils storage area,  Regular inspection for
area) Is the project site’s expansion area with topsoil set aside for later use new eroded areas near
located in an area identified by and allow maximum re-use of spoils the site
MGB/PAG-ASA/ PHIVOLCS as  Construction during dry season  Others, specify:
hazard prone?  Stabilization of embankment with
 Yes grasses or other soil cover
 No

Page 2 of 9
Generic Environmental Performance Report and Management Plan

Baseline Environment
Possible Environmental/ (at the time of Monitoring Parameters/
Preventive/ Mitigating Measures Remarks
Social Impacts expansion/modification Implementation
application)
 Conduct Engineering Geological
and Geo-hazard Assessment
(EGGA) and implement
corresponding recommendation
 Others, specify:

Building of Structure and Solid Waste Management Scheme in  Set-up temporary fence around the  Daily inspection of waste
Improper solid waste the area: construction area handling including
management leading to:  SLF  Implement re-use and recycling of segregation in
 Impairment of visual  MRF waste materials waste/recycling bins
aesthetics
 Composting  Implement proper segregation,  Weekly inspection of waste
 Devaluation of land values accumulation and disposal
 Regular Collection of Solid Wastes collection and disposal of domestic
wastes in designated areas  Regular inspection of
Presence of visually significant  Provide receptacles / bins for solid landscaping and other
wastes beautification activities
landforms/landscape/structures?
 Yes  Composting of Organic Wastes  Regular monitoring of buffer
zones
 No  Coordinate with the municipal / city
 Regularly monitor
waste collectors
presence/absence of
 Implement landscaping and other complaints from adjacent
beautification measures property owners
 Provide adequate buffer  Others, specify:
 Compensate adjacent property
owners
 Engage third party company for
waste collection
 Others, specify:

Page 3 of 9
Generic Environmental Performance Report and Management Plan

Baseline Environment
Possible Environmental/ (at the time of Monitoring Parameters/
Preventive/ Mitigating Measures Remarks
Social Impacts expansion/modification Implementation
application)
 Soil/Land contamination Existing soil/land type in the
expansion area:
 Secondary containment (pls  Regular inspection for
due to materials leakage specify): leakage of materials that
 Depletion of soil nutrient  sandy can cause land/soil
content/soil  clay contamination.
productivity/Change in  sandy-loam  Monitoring of soil physical
acidity/alkalinity of soil and chemical properties
 concrete/cement  Others, specify:
 Others, specify

Soil acidity/alkalinity
 acidic
 basic
 Conduct of soil test/analysis for
the following parameters relevant
to the potential source of
contamination, specify:

WATER
 Increased siltation due to Specify nearest/receiving water body:  Set-up proper and adequate Regular (ocular) inspection of:
project activities ____________________________ sanitary facilities  Drainage / canal systems
 Water quality degradation Distance to nearest/receiving water
 Ensure strict observance of proper  Wastewater treatment
 Others, specify: body:
waste disposal/handling and proper
sanitation including by the
facility (i.e., grease trap,
septic tank, etc.)
 0 to less than 0.5 km contractor and its workers (if any)
 0.5 to 1 km  Provision of wastewater treatment Regular monitoring of ambient
 More than 1 km facility (e.g. septic tank, oil and water for the following:
Parameter Frequency
water separator, etc.)
Size of population using receiving  Set up silt trap/stilling ponds to  pH  Annual
surface water: minimize downstream siltation  Semi-annual
 ≤ 1,000 persons  Provision of three-chambered septic  Quarterly
 >1,000 and ≤ 5,000persons tank for domestic sewage
 TSS  Annual
 >5,000person
Page 4 of 9
Generic Environmental Performance Report and Management Plan

Baseline Environment
Possible Environmental/ (at the time of Monitoring Parameters/
Preventive/ Mitigating Measures Remarks
Social Impacts expansion/modification Implementation
application)

Classification of nearest water body :


 Provide ring canals around fuelling  Semi-annual
tanks/ motorpool/ maintenance  Quarterly
 Freshwater  Marine/ coastal areas
 BOD  Annual
water  Others, specify
 AA  SA
____________________________  Semi-annual
 Quarterly
A  SB
 Color  Annual
B  SC  Semi-annual
C  SD  Quarterly
D  _____  Annual
 Semi-annual
Current Water Use:
 Quarterly
 Fishery
 ______  Annual
 Tourist Zone / Park
 Semi-annual
 Recreational
 Quarterly
 Industrial
 ______  Annual
 Agricultural
 Semi-annual
 Others, specify:
 Quarterly
Distance of project area to the
nearest well used:
 0 to less than 0.5 km
 0.5 to 1 km
 More than 1 km

Use of the nearest well:


 Drinking/Domestic
 Industrial
 Agricultural
 Others, specify:

Page 5 of 9
Generic Environmental Performance Report and Management Plan

Baseline Environment
Possible Environmental/ (at the time of Monitoring Parameters/
Preventive/ Mitigating Measures Remarks
Social Impacts expansion/modification Implementation
application)
 Competition in water use  Implement rainwater harvesting and  Regularly monitor
Size of population using the source/s
 Depletion of water of water for the project:
similar measures as an alternative
source of water
presence/absence of
complaints
resources
 ≤ 1,000 persons  Observe water conservation  Regular coordination with
 >1,000 and ≤ 5,000 persons measures; concerned agencies
>5,000 persons  Careful selection of project site to  Regularly monitor
avoid disruption of traditional water occurrences of water
Available/nearest water source. uses shortages
 Deepwell  Obtain Water Permit from NWRB
 Others, specify:
 Water district/LGU  Improve efficiency of water supply
 Surface water and distribution system
 Others, specify:  Increase storage capacities of water
supply structures for resilience to
greater climate variations and
extremes
 Others, specify:

 Increased occurrence of Is the project site located in an area  Use appropriate design for project  Regularly monitor
flooding identified by MGB/PAG-ASA as flood facilities including appropriate presence/absence of
prone? drainage mechanism considering complaints
 Yes the existing local drainage system.  Regular coordination with
 No  Regularly remove debris and other concerned agencies
materials that may obstruct water  Regularly monitor
flow increased frequency of
 Use appropriate technology (e.g. flooding
raised hand-pumps) to protect  Others, specify:
drinking water from flood
contamination
 Others, specify:

Page 6 of 9
Generic Environmental Performance Report and Management Plan

Baseline Environment
Possible Environmental/ (at the time of Monitoring Parameters/
Preventive/ Mitigating Measures Remarks
Social Impacts expansion/modification Implementation
application)
AIR / NOISE
 Impact on air quality Distance to nearest community:  Properly operate and maintain all  Regularly monitor
 Nuisance due to generation  0 to less than 0.5 km emission sources (e.g. vehicles, presence/absence of
of obnoxious/ unpleasant  0.5 to 1 km pumps, generator, etc) complaints
odor  More than 1 km  Install appropriate air pollution  Regular monitoring for
device : ____________________ obnoxious odor
Is the wind direction blowing towards  Control vehicle speed to lessen
Regular (ocular) inspection of:
the nearest community most of the suspension of road dust  Absence of white or black
year?  Conduct water spraying to suppress
smoke from vehicles, heavy
equipment and generator
 Yes dust sources and minimize
discomfort to nearby residents
 No Monitoring of ambient air for the
 Use covered vehicles to deliver following:
materials that may generate dust Parameter Frequency
 Others, specify:  PM10  Annual
 Semi-annual
 Quarterly
 TSP  Annual
 Semi-annual
 Quarterly
 NO2  Annual
 Semi-annual
 Quarterly
 SO2  Annual
 Semi-annual
 Quarterly
 Others:  Annual
_______
_______  Semi-annual
 Quarterly

Page 7 of 9
Generic Environmental Performance Report and Management Plan

Baseline Environment
Possible Environmental/ (at the time of Monitoring Parameters/
Preventive/ Mitigating Measures Remarks
Social Impacts expansion/modification Implementation
application)
 Nuisance due to noise  Properly operate and maintain all  Regularly monitor
generation noise sources (e.g. vehicles, presence/absence of
pumps, generator, etc) complaints
 Install appropriate noise control  Regular monitoring for
device/s (e.g., mufflers, silencer, noise
sound barriers, etc.)  Regular monitoring of buffer
 Implement appropriate operating zones
hours  Others, specify:
 Provide adequate buffer and/or
planting of trees
 Others, specify:

PEOPLE
 Displacement of residents Size of population of host barangay:  Provide relocation/disturbance  Regularly monitor
including indigenous people  ≤ 1,000 persons compensation packages presence/absence of
in the project site and within  >1,000 and ≤ 5,000persons  Prioritize local residents for complaints
its vicinity
 >5,000person
employment  Regular coordination with
 Enhanced employment  LGU
and/or livelihood  Indigenous people
Promptly pay local taxes and other
financial obligations  Others, specify:
opportunities Size :
________________________  Regular coordination with LGU
 Reduced employment
 Conduct prior consultation &
and/or livelihood Classification of host barangay: coordination to minimize disruption
opportunities
  Urban on daily domestic activities
Increased revenues for
LGU  Rural  Ensure participation of IPs in
consultations and dialogues &
 Disruption/Competition in Employment/Livelihood Opportunity consider IP rights and cultural
delivery of public services within the host municipality practices in the provision of
(e.g., education, peace and relocation/disturbance
order, etc.)  High compensation packages
 Low

Page 8 of 9
Generic Environmental Performance Report and Management Plan

Baseline Environment
Possible Environmental/ (at the time of Monitoring Parameters/
Preventive/ Mitigating Measures Remarks
Social Impacts expansion/modification Implementation
application)
 Enhanced delivery of public Description:  Provide appropriate traffic/warning
services (e.g., education, signs, lighting, etc
peace and order, etc.)  Others, specify:
 Increase in traffic volume
and worsening of traffic flow Available services within/near the
host barangay:
 Schools (e.g. elementary, high
school, college)
 Health facilities (e.g., clinics,
hospitals, etc.)
 Peace and order (e.g., police
outpost, brgy. Tanod, etc.)
 Recreation and sports facilities
Others, specify:

Page 9 of 9