I. ENVIRONMENTAL IMPACT MANAGEMENT AND MONITORING PLAN FOR CURRENT OPERATIONS & PROPOSED EXPANSION/MODIFICATION
Baseline Environment
Possible Environmental/ (at the time of Monitoring Parameters/
Preventive/ Mitigating Measures Remarks
Social Impacts expansion/modification Implementation
application)
LAND
Consistency with land use Current land use w/in 1km radius (as See attached proof of compatibility Actual land uses w/in 1km
per zoning ordinance): with land use radius:
Residential Limit project activities to what is Residential
Commercial/ Institutional compatible to the land use Commercial/ Institutional
Industrial Others, specify: Industrial
Agricultural/ Recreational Agricultural/ Recreational
Protected Areas Protected Areas
Others, specify: Others, specify:
Disturbance to wildlife due to Existing vegetation in the expansion Comply with conditions of Annual inspection of area
vegetation clearing during area: DENR/LGU CLUP, Tree Cutting replanted/ revegetated
expansion Forestland Permit, ROW, Permit
Marshland Limit land clearing as much as Others, specify:
Grassland
possible
Mangrove
Provide temporary fencing for
vegetation that will be retained
Wetland
Page 1 of 9
Generic Environmental Performance Report and Management Plan
Baseline Environment
Possible Environmental/ (at the time of Monitoring Parameters/
Preventive/ Mitigating Measures Remarks
Social Impacts expansion/modification Implementation
application)
Others, specify: Promote restoration of damaged or
destroyed vegetation where
possible (e.g., tree planting);
Others, specify:
Land tenure/ compatibility Identify land tenure/ compatibility Obtain the following clearances/ Regularly monitor
issue (in expansion area) issues: permits from concerned agencies: presence/absence of
CARP ___________________________ complaints
CADC/ CADT/ CALC/ CALT Resettlement Plan prepared
Regular coordination with
LGU or appropriate
ROW Provide relocation/disturbance agencies
Informal settlers compensation packages Others, specify:
Ecologically sensitive or protected Ensure participation of IPs in
area consultations and dialogues
Others, specify:
MOA prepared/signed
Provide adequate buffer
Others, specify:
Change in surface landform/ Slope in expansion area: Considering the natural hazards and Regular inspection of
topography/ terrain/slope (in Flat (0-3%) climate projections in the area: slope protection
expansion area) Gently sloping to rolling (3-18%) Employ appropriate erosion control measures in erosion-
and slope protection measures prone areas
Soil Erosion(in expansion Steep (>18%)
Designate a spoils storage area, Regular inspection for
area) Is the project site’s expansion area with topsoil set aside for later use new eroded areas near
located in an area identified by and allow maximum re-use of spoils the site
MGB/PAG-ASA/ PHIVOLCS as Construction during dry season Others, specify:
hazard prone? Stabilization of embankment with
Yes grasses or other soil cover
No
Page 2 of 9
Generic Environmental Performance Report and Management Plan
Baseline Environment
Possible Environmental/ (at the time of Monitoring Parameters/
Preventive/ Mitigating Measures Remarks
Social Impacts expansion/modification Implementation
application)
Conduct Engineering Geological
and Geo-hazard Assessment
(EGGA) and implement
corresponding recommendation
Others, specify:
Building of Structure and Solid Waste Management Scheme in Set-up temporary fence around the Daily inspection of waste
Improper solid waste the area: construction area handling including
management leading to: SLF Implement re-use and recycling of segregation in
Impairment of visual MRF waste materials waste/recycling bins
aesthetics
Composting Implement proper segregation, Weekly inspection of waste
Devaluation of land values accumulation and disposal
Regular Collection of Solid Wastes collection and disposal of domestic
wastes in designated areas Regular inspection of
Presence of visually significant Provide receptacles / bins for solid landscaping and other
wastes beautification activities
landforms/landscape/structures?
Yes Composting of Organic Wastes Regular monitoring of buffer
zones
No Coordinate with the municipal / city
Regularly monitor
waste collectors
presence/absence of
Implement landscaping and other complaints from adjacent
beautification measures property owners
Provide adequate buffer Others, specify:
Compensate adjacent property
owners
Engage third party company for
waste collection
Others, specify:
Page 3 of 9
Generic Environmental Performance Report and Management Plan
Baseline Environment
Possible Environmental/ (at the time of Monitoring Parameters/
Preventive/ Mitigating Measures Remarks
Social Impacts expansion/modification Implementation
application)
Soil/Land contamination Existing soil/land type in the
expansion area:
Secondary containment (pls Regular inspection for
due to materials leakage specify): leakage of materials that
Depletion of soil nutrient sandy can cause land/soil
content/soil clay contamination.
productivity/Change in sandy-loam Monitoring of soil physical
acidity/alkalinity of soil and chemical properties
concrete/cement Others, specify:
Others, specify
Soil acidity/alkalinity
acidic
basic
Conduct of soil test/analysis for
the following parameters relevant
to the potential source of
contamination, specify:
WATER
Increased siltation due to Specify nearest/receiving water body: Set-up proper and adequate Regular (ocular) inspection of:
project activities ____________________________ sanitary facilities Drainage / canal systems
Water quality degradation Distance to nearest/receiving water
Ensure strict observance of proper Wastewater treatment
Others, specify: body:
waste disposal/handling and proper
sanitation including by the
facility (i.e., grease trap,
septic tank, etc.)
0 to less than 0.5 km contractor and its workers (if any)
0.5 to 1 km Provision of wastewater treatment Regular monitoring of ambient
More than 1 km facility (e.g. septic tank, oil and water for the following:
Parameter Frequency
water separator, etc.)
Size of population using receiving Set up silt trap/stilling ponds to pH Annual
surface water: minimize downstream siltation Semi-annual
≤ 1,000 persons Provision of three-chambered septic Quarterly
>1,000 and ≤ 5,000persons tank for domestic sewage
TSS Annual
>5,000person
Page 4 of 9
Generic Environmental Performance Report and Management Plan
Baseline Environment
Possible Environmental/ (at the time of Monitoring Parameters/
Preventive/ Mitigating Measures Remarks
Social Impacts expansion/modification Implementation
application)
Page 5 of 9
Generic Environmental Performance Report and Management Plan
Baseline Environment
Possible Environmental/ (at the time of Monitoring Parameters/
Preventive/ Mitigating Measures Remarks
Social Impacts expansion/modification Implementation
application)
Competition in water use Implement rainwater harvesting and Regularly monitor
Size of population using the source/s
Depletion of water of water for the project:
similar measures as an alternative
source of water
presence/absence of
complaints
resources
≤ 1,000 persons Observe water conservation Regular coordination with
>1,000 and ≤ 5,000 persons measures; concerned agencies
>5,000 persons Careful selection of project site to Regularly monitor
avoid disruption of traditional water occurrences of water
Available/nearest water source. uses shortages
Deepwell Obtain Water Permit from NWRB
Others, specify:
Water district/LGU Improve efficiency of water supply
Surface water and distribution system
Others, specify: Increase storage capacities of water
supply structures for resilience to
greater climate variations and
extremes
Others, specify:
Increased occurrence of Is the project site located in an area Use appropriate design for project Regularly monitor
flooding identified by MGB/PAG-ASA as flood facilities including appropriate presence/absence of
prone? drainage mechanism considering complaints
Yes the existing local drainage system. Regular coordination with
No Regularly remove debris and other concerned agencies
materials that may obstruct water Regularly monitor
flow increased frequency of
Use appropriate technology (e.g. flooding
raised hand-pumps) to protect Others, specify:
drinking water from flood
contamination
Others, specify:
Page 6 of 9
Generic Environmental Performance Report and Management Plan
Baseline Environment
Possible Environmental/ (at the time of Monitoring Parameters/
Preventive/ Mitigating Measures Remarks
Social Impacts expansion/modification Implementation
application)
AIR / NOISE
Impact on air quality Distance to nearest community: Properly operate and maintain all Regularly monitor
Nuisance due to generation 0 to less than 0.5 km emission sources (e.g. vehicles, presence/absence of
of obnoxious/ unpleasant 0.5 to 1 km pumps, generator, etc) complaints
odor More than 1 km Install appropriate air pollution Regular monitoring for
device : ____________________ obnoxious odor
Is the wind direction blowing towards Control vehicle speed to lessen
Regular (ocular) inspection of:
the nearest community most of the suspension of road dust Absence of white or black
year? Conduct water spraying to suppress
smoke from vehicles, heavy
equipment and generator
Yes dust sources and minimize
discomfort to nearby residents
No Monitoring of ambient air for the
Use covered vehicles to deliver following:
materials that may generate dust Parameter Frequency
Others, specify: PM10 Annual
Semi-annual
Quarterly
TSP Annual
Semi-annual
Quarterly
NO2 Annual
Semi-annual
Quarterly
SO2 Annual
Semi-annual
Quarterly
Others: Annual
_______
_______ Semi-annual
Quarterly
Page 7 of 9
Generic Environmental Performance Report and Management Plan
Baseline Environment
Possible Environmental/ (at the time of Monitoring Parameters/
Preventive/ Mitigating Measures Remarks
Social Impacts expansion/modification Implementation
application)
Nuisance due to noise Properly operate and maintain all Regularly monitor
generation noise sources (e.g. vehicles, presence/absence of
pumps, generator, etc) complaints
Install appropriate noise control Regular monitoring for
device/s (e.g., mufflers, silencer, noise
sound barriers, etc.) Regular monitoring of buffer
Implement appropriate operating zones
hours Others, specify:
Provide adequate buffer and/or
planting of trees
Others, specify:
PEOPLE
Displacement of residents Size of population of host barangay: Provide relocation/disturbance Regularly monitor
including indigenous people ≤ 1,000 persons compensation packages presence/absence of
in the project site and within >1,000 and ≤ 5,000persons Prioritize local residents for complaints
its vicinity
>5,000person
employment Regular coordination with
Enhanced employment LGU
and/or livelihood Indigenous people
Promptly pay local taxes and other
financial obligations Others, specify:
opportunities Size :
________________________ Regular coordination with LGU
Reduced employment
Conduct prior consultation &
and/or livelihood Classification of host barangay: coordination to minimize disruption
opportunities
Urban on daily domestic activities
Increased revenues for
LGU Rural Ensure participation of IPs in
consultations and dialogues &
Disruption/Competition in Employment/Livelihood Opportunity consider IP rights and cultural
delivery of public services within the host municipality practices in the provision of
(e.g., education, peace and relocation/disturbance
order, etc.) High compensation packages
Low
Page 8 of 9
Generic Environmental Performance Report and Management Plan
Baseline Environment
Possible Environmental/ (at the time of Monitoring Parameters/
Preventive/ Mitigating Measures Remarks
Social Impacts expansion/modification Implementation
application)
Enhanced delivery of public Description: Provide appropriate traffic/warning
services (e.g., education, signs, lighting, etc
peace and order, etc.) Others, specify:
Increase in traffic volume
and worsening of traffic flow Available services within/near the
host barangay:
Schools (e.g. elementary, high
school, college)
Health facilities (e.g., clinics,
hospitals, etc.)
Peace and order (e.g., police
outpost, brgy. Tanod, etc.)
Recreation and sports facilities
Others, specify: