REPORT TITLE

STRUCTURAL SUPPORT & FOOTING FOR SPRAY


NOZZLE & FOAM SYSTEM

CLIENT
OIL & NATURAL GAS CORPORATION

REVISION – 0
4 NOV, 2019
Contents
1. Introduction........................................................................................................................ 3
2. Data.................................................................................................................................... 3
3. Reference:........................................................................................................................... 3
4. Geometric Features & Load Calculations.............................................................................4
4.1 Isometric View................................................................................................................ 4
4.2 Load Calculation............................................................................................................ 5
4.2.1 FOR (STR 1).............................................................................................................. 5
4.2.1.1 Dead Load.......................................................................................................... 5
4.2.1.2 Pipe Empty Load.................................................................................................5
4.2.1.3 Pipe Operating Load...........................................................................................6
4.2.1.4 Seismic load........................................................................................................7
4.2.1.5 Wind Load........................................................................................................... 8
4.2.2 FOR (STR 2).............................................................................................................. 9
4.2.2.1 Dead Load.......................................................................................................... 9
4.2.2.2 Pipe Empty Load.................................................................................................9
4.2.2.3 Pipe Operating Load...........................................................................................9
4.2.2.4 Seismic load......................................................................................................10
4.2.2.5 Wind Load.........................................................................................................11
4.2.3 FOR (STR3)............................................................................................................. 12
4.2.3.1 Dead Load........................................................................................................ 12
4.2.3.2 Pipe Empty Load...............................................................................................12
4.2.3.3 Pipe Operating Load.........................................................................................12
4.2.3.4 Seismic load......................................................................................................14
4.2.3.5 Wind Load.........................................................................................................16
4.4. Design Result.................................................................................................................. 19
4.4.1 PEDESTAL DESIGN (STR1).....................................................................................19
4.4.2 PEDESTAL DESIGN (STR2).....................................................................................21
4.4.3 PEDESTAL DESIGN (STR3).....................................................................................23
4.5 Base Plate Design........................................................................................................ 25
4.5.1 BASE PLATE DESIGN (STR1)..................................................................................25
4.5.2 BASE PLATE DESIGN (STR2)..................................................................................30
4.5.3 BASE PLATE DESIGN (STR3)..................................................................................35

Geleki supports
1
4.6 Footing Design................................................................................................................. 41
4.6.1 Footing Design (STR1)...............................................................................................41
4.6.2 Footing Design (STR2)...............................................................................................46
4.6.3 Footing Design (STR3)...............................................................................................51
5. Appendix.......................................................................................................................... 56
5.1 (STR1)....................................................................................................................... 56
5.2 (STR2)........................................................................................................................ 59
5.3 (STR3)........................................................................................................................ 62

Geleki supports
2
1. Introduction
The purpose of this document is to design a supports for spray nozzle & foam system.
Supports are designed as independent supports. The spacing of supports is around 7.06m.
Each supports have isolated combined footing.

2. Data
 Concrete grade: M30
 Reinforcement: Fe 500
 Net soil bearing capacity: 10 Tons/ M2 at 1.5m below NGL
 Density of CS pipe ( ρst ): 7854 Kg/ M3 & Density of Water ( ρw ): 1000 Kg/ M3
 Seismic Zone : V

3. Reference:
Sr. No. Description No.
1 Code of practice for plain & reinforced concrete IS: 456
2 Code of practice for general construction in steel IS: 800
3 Code of practice for design loads IS: 875
5 Code of practice for ductile detailing of reinforced Concrete IS: 13920
structures subjected to seismic forces
6 Criteria for earthquake resistant design of Structures IS:1893
7 Reinforced concrete design by N. Krishna Raju and R.N. Pranesh

Geleki supports
3
4. Geometric Features & Load Calculations

4.1 Isometric View

STR1(NOS 2)

STR2(NOS 14)

Geleki supports
4
( STR3)

4.2 Load Calculation

4.2.1 FOR (STR 1)

4.2.1.1 Dead Load


Self weight

4.2.1.2 Pipe Empty Load


1) Due to 1 inch pipe
Contributory length= 6.392 m , dia. of pipe (d)= 33.4 mm=0.0334m
& Thickness (t)= 3.38 mm = 0.0034 m is considered.
Pipe Empty Load= π d t L ρst
= (3.14 x 0.0334 x 0.0034 x 6.392) x 7854
=17.92 kg
=0.1792 kN
2) Due to 3 inch pipe
Contributory length=6.392 m, dia. of pipe (d) = 76.1 mm= 0.076 m
& Thickness (t)= 4mm=0.004m is considered.
Pipe Empty Load= π d t L ρst
= (3.14 x 0.076 x 0.004 x 7.06) x 7854
=5.295 kg

Geleki supports
5
=0.529 kN

4.2.1.3 Pipe Operating Load


1) Due to 1 inch pipe
Contributory length= 6.392 m, dia. of pipe (d) = 33.4 mm = 0.0334 m
& Thickness (t) = 3.38 mm = 0.0034 m is considered.
Pipe operating Load= (π /4) x d2 x L x ρw
(Fluid load) = (3.14/4) x 0.03342 x 6.392 x 1000
= 5.61 kg
= 0.057 kN
2) Due to 3 inch pipe
Contributory length=7.06 m, dia. of pipe (d)= 76.1 mm = 0.076 m
& Thickness (t) = 4 mm = 0.004 m is considered.
Pipe operating Load= (π /4) x d2 x L x ρw
(Fluid load) = (3.14/4) x 0.0762 x 7.06 x 1000
= 32.027 kg
= 0.32 KN

Geleki supports
6
4.2.1.4 Seismic load

Dead Load + Operating load = 0.53 + 0.32 = 0.85 kN

From this seismic weight horizontal base shear will be calculated.

 Support Reaction

Geleki supports
7
4.2.1.5 Wind Load

P= Cpe x pz x Contributory length x dia of pipe

pz = 1.26 kN/sq.m

Cpe = 0.7

S2=Contributory length =7.06m , dia=0.0127m (Due to 1/2 inch pipe)

P= 0.7 x 1.26 x 7.06 x 0.0127 = 0.079 kN

S1=Contributory length =7.06m , dia=0.076m (Due to 3 inch pipe)

P= 0.7 x 1.26 x 7.06 x 0.076= 0.47 kN

Due to 6 inch pipe=152.4mm=0.1524m

S2=Contributory length =0.52 m ,

P= 0.7 x 1.26 x 0.1524 x 0.52 = 0.0698 kN

S1=Contributory length =1.47 m ,

P= 0.7 x 1.26 x 0.1524 x 1.47 = 0.198 kN

Geleki supports
8
S3=Contributory length =2 m ,

P= 0.7 x 1.26 x 0.1524 x 2 = 0.27 kN

S1=Contributory length =3 m ,

P= 0.7 x 1.26 x 0.1524 x 3 = 0.4 kN

S3=Contributory length =3 m ,

P= 0.7 x 1.26 x 0.1524 x3 = 0.4 kN

S3=Contributory length =2 m ,

P= 0.7 x 1.26 x 0.1524 x 2 = 0.27 kN

S3=Contributory length =1.53 m ,

P= 0.7 x 1.26 x 0.1524 x 1.53 = 0.2 kN

4.2.2 FOR (STR 2)

4.2.2.1 Dead Load


Self weight

4.2.2.2 Pipe Empty Load


1) Due to 1/2 inch pipe
Contributory length=7.06 ,dia. of pipe (d)= 12.7 mm=0.0127m
& Thickness (t)= 2mm=0.002m is considered.
Pipe Empty Load= π d t L ρst
= (3.14 x 0.0127 x 0.002 x 7.06) x 7854
=4.426 kg
=0.044 kN
2) Due to 3 inch pipe
Contributory length=7.06 ,dia. of pipe (d)= 76.1 mm=0.076 m
& Thickness (t)= 4mm=0.004m is considered.
Pipe Empty Load= π d t L ρst
= (3.14 x 0.076 x 0.004 x 7.06) x 7854
=5.295 kg
=0.529 kN

4.2.2.3 Pipe Operating Load


1) Due to 1/2 inch pipe
Contributory length=7.06 ,dia. of pipe (d)= 12.7 mm=0.0127m

Geleki supports
9
& Thickness (t)= 2mm=0.002m is considered.
Pipe operating Load= (π /4) x d2 x L x ρw
(Fluid load) = (3.14/4) x 0.01272 x 7.06 x 1000
=0.89 kg
=0.01 kN
2) Due to 3 inch pipe
Contributory length=7.06 ,dia. of pipe (d)= 76.1 mm=0.076 m
& Thickness (t)= 4mm=0.004m is considered.
Pipe operating Load= (π /4) x d2 x L x ρw
(Fluid load) = (3.14/4) x 0.0762 x 7.06 x 1000
=32.027 kg
=0.32 kN

4.2.2.4 Seismic load


Dead Load + Operating load = 0.53 + 0.32 = 0.85 kN

From this seismic weight horizontal base shear will be calculated.

 Support Reaction

Geleki supports
10
4.2.2.5 Wind Load

P= Cpe x pz x Contributory length x dia of pipe

pz = 1.26 kN/sq.m

Cpe = 0.7

S2=Contributory length =7.06m , dia=0.0127m (Due to 1/2 inch pipe)

P= 0.7 x 1.26 x 7.06 x 0.0127 = 0.079 kN

S1=Contributory length =7.06m , dia=0.076m (Due to 3 inch pipe)

Geleki supports
11
P= 0.7 x 1.26 x 7.06 x 0.076= 0.47 kN

4.2.3 FOR (STR3)

4.2.3.1 Dead Load


Self weight

4.2.3.2 Pipe Empty Load


1) Due to 1/2 inch pipe
Contributory length=7.06 ,dia. of pipe (d)= 12.7 mm=0.0127m
& Thickness (t)= 2mm=0.002m is considered.
Pipe Empty Load= π d t L ρst
= (3.14 x 0.0127 x 0.002 x 7.06) x 7854
=4.426 kg
=0.044 kN
2) Due to 3 inch pipe
Contributory length=7.06 ,dia. of pipe (d)= 76.1 mm=0.076 m
& Thickness (t)= 4mm=0.004m is considered.
Pipe Empty Load= π d t L ρst
= (3.14 x 0.076 x 0.004 x 7.06) x 7854
=5.295 kg
=0.529 kN
3) Due to Foam Maker (3kN=300kg)
Considered 60% of load= 0.6 x 3
= 1.8 kN

4.2.3.3 Pipe Operating Load


1) Due to 1/2 inch pipe
Contributory length=7.06 ,dia. of pipe (d)= 12.7 mm=0.0127m
& Thickness (t)= 2mm=0.002m is considered.
Pipe operating Load= (π /4) x d2 x L x ρw
(Fluid load) = (3.14/4) x 0.01272 x 7.06 x 1000
=0.89 kg
=0.01 kN
2) Due to 3 inch pipe
Contributory length=7.06 ,dia. of pipe (d)= 76.1 mm=0.076 m
& Thickness (t)= 4mm=0.004m is considered.
Pipe operating Load= (π /4) x d2 x L x ρw
(Fluid load) = (3.14/4) x 0.0762 x 7.06 x 1000
=32.027 kg
=0.32 kN

Geleki supports
12
3) Due to Foam Maker(3kN=300kg)
Considered 40% of load= 0.4 x 3
= 1.2 kN

4.2.3.4 Seismic load


1) From STR2

Dead Load + Operating load = 0.53 + 0.32 = 0.85 kN

Geleki supports
13
From this seismic weight horizontal base shear will be calculated.

 Support Reaction

2)From STR3

Geleki supports
14
 Support Reaction

Geleki supports
15
4.2.3.5 Wind Load

P= Cpe x pz x Contributory length x dia of pipe

pz = 1.26 kN/sq.m

Cpe = 0.7

S2=Contributory length =7.06m , dia=0.0127m (Due to 1/2 inch pipe)

P= 0.7 x 1.26 x 7.06 x 0.0127 = 0.079 kN

S1=Contributory length =7.06m , dia=0.076m (Due to 3 inch pipe)

P= 0.7 x 1.26 x 7.06 x 0.076= 0.47 kN

Due to 4 inch pipe=101.6mm=0.1016m

S4=Contributory length =1.6 m ,

P= 0.7 x 1.26 x 0.1016 x 1.6 = 0.143 kN

S3=Contributory length =2 m ,

P= 0.7 x 1.26 x 0.1016 x 2 = 0.179 kN

Geleki supports
16
S3=Contributory length =2 m ,

P= 0.7 x 1.26 x 0.1016 x 2 = 0.179 kN

S3=Contributory length =2 m ,

P= 0.7 x 1.26 x 0.1016 x 2 = 0.179 kN

S3=Contributory length =2 m ,

P= 0.7 x 1.26 x 0.1016 x 2 = 0.179 kN

S3=Contributory length =2 m ,

P= 0.7 x 1.26 x 0.1016 x 2 = 0.179 kN

S3=Contributory length =1.4 m ,

P= 0.7 x 1.26 x 0.1016 x 1.4 = 0.125 kN

LOAD COMBINATIONS FOR ALL SUPPORTS

Geleki supports
17
*FACTORED LOAD COMBINATIONS
LOAD COMB 101 DL EL OL
1 1.5 2 1.5 3 1.5
LOAD COMB 102 DL EL OL SL-X
1 1.5 2 1.5 3 1.5 4 1.5
LOAD COMB 103 DL EL OL SL-Z
1 1.5 2 1.5 3 1.5 5 1.5
LOAD COMB 104 DL EL OL WL-X
1 1.5 2 1.5 3 1.5 6 1.5
LOAD COMB 105 DL EL OL WL-Z
1 1.5 2 1.5 3 1.5 7 1.5
LOAD COMB 106 DL WL
1 1.5 6 1.5
LOAD COMB 107 DL EL OL WL-X
1 1.5 2 1.5 3 1.5 6 -1.5
*UNFACTORED LOAD COMBINATIONS
LOAD COMB 201 DL EL OL
1 1.0 2 1.0 3 1.0
LOAD COMB 202 DL EL OL SL-X
1 1.0 2 1.0 3 1.0 4 1.0
LOAD COMB 203 DL EL OL SL-Z
1 1.0 2 1.0 3 1.0 5 1.0
LOAD COMB 204 DL EL OL WL-X
1 1.0 2 1.0 3 1.0 6 1.0
LOAD COMB 205 DL EL OL WL-Z
1 1.0 2 1.0 3 1.0 7 1.0
LOAD COMB 206 DL WL
1 1.0 6 1.0
LOAD COMB 207 DL EL OL WL-X
1 1.0 2 1.0 3 1.0 6 -1.0

Geleki supports
18
4.4. Design Result

4.4.1 PEDESTAL DESIGN (STR1)

Required area of steel in column is 2000 mm2


Providing area of steel in column is 2412 mm2
Hence provide steel in column, T16-12

Geleki supports
19
Required area of steel in column is 1078 mm2
Providing area of steel in column is 1356 mm2
Hence provide steel in column, T12-12

Geleki supports
20
4.4.2 PEDESTAL DESIGN (STR2)

Required area of steel in column is 2000 mm2


Providing area of steel in column is 2412 mm2
Hence provide steel in column, T16-12

Geleki supports
21
Required area of steel in column is 980 mm2
Providing area of steel in column is 1356 mm2
Hence provide steel in column, T12-12

Geleki supports
22
4.4.3 PEDESTAL DESIGN (STR3)

Required area of steel in column is 2000 mm2


Providing area of steel in column is 2412 mm2
Hence provide steel in column, T16-12

Geleki supports
23
Required area of steel in column is 980 mm2
Providing area of steel in column is 1356 mm2
Hence provide steel in column, T12-12

4.5 Base Plate Design

4.5.1 BASE PLATE DESIGN (STR1)


1)FOR PIPE DIA 244 H

Geleki supports
24
Geleki supports
25
Geleki supports
26
2)FOR PIPE DIA 101 L

Geleki supports
27
Geleki supports
28
Geleki supports
29
4.5.2 BASE PLATE DESIGN (STR2)
1)FOR PIPE DIA 219L

Geleki supports
30
Geleki supports
31
2)FOR PIPE DIA 101 L

Geleki supports
32
Geleki supports
33
Geleki supports
34
4.5.3 BASE PLATE DESIGN (STR3)
1)FOR PIPE DIA 219M

Geleki supports
35
Geleki supports
36
2)FOR PIPE DIA 101 L

Geleki supports
37
Geleki supports
38
Geleki supports
39
4.6 Footing Design

4.6.1 Footing Design (STR1)

Geleki supports
40
 Support Reactions

 Moment Calculation

 Gross Pressure Calculation

 Net Pressure Calculation

Geleki supports
41
Geleki supports
42
Geleki supports
43
Geleki supports
44
Geleki supports
45
4.6.2 Footing Design (STR2)
 Support Reactions

 Moment Calculation

 Gross Pressure Calculation

Geleki supports
46
 Net Pressure Calculation

Geleki supports
47
Geleki supports
48
Geleki supports
49
4.6.3 Footing Design (STR3)
 Support Reactions

Geleki supports
50
 Moment Calculation

 Gross Pressure Calculation

 Net Pressure Calculation

Geleki supports
51
Geleki supports
52
Geleki supports
53
Geleki supports
54
Geleki supports
55
5. Appendix
5.1 (STR1)

STAAD SPACE
START JOB INFORMATION
ENGINEER DATE 22-Sept-17
END JOB INFORMATION
INPUT WIDTH 79
UNIT METER KN
JOINT COORDINATES
1 0 1.06 0; 2 0 0 0; 4 0 3.06 0; 5 0 5.06 0; 7 0 9.06 0; 8 0 11.06 0;
9 0 13.06 0; 10 0 14 0; 11 0.7 14 0; 12 0.6 13.06 0; 14 0.6 9.06 0;
15 0.7 1.06 0; 16 0.7 3.06 0; 17 0.7 5.06 0; 18 0.7 11.06 0; 19 0 13.3 0;
20 0 12.36 0; 22 0 8.36 0; 24 -1 0 0; 25 0 -1.5 0; 26 -1 -1.5 0;
MEMBER INCIDENCES
1 2 1; 2 1 4; 3 4 5; 4 5 22; 6 7 8; 7 8 20; 8 9 19; 9 10 11; 10 9 12; 11 7 14;
13 8 18; 14 5 17; 15 4 16; 16 1 15; 17 19 10; 18 19 11; 19 20 9; 20 20 12;
22 22 7; 23 22 14; 25 24 4; 26 2 25; 27 24 26;
START USER TABLE
TABLE 1
UNIT METER KN
GENERAL
COMP100X8
0.006156 0.3 0.01026 0.3 0.01026 9.9e-005 9.9e-005 0.00014 0.000658 -
0.000658 0.004617 0.004617 4e-006 0.001504 0 0.27948
END
DEFINE MATERIAL START
ISOTROPIC CONCRETE
E 2.17185e+007
POISSON 0.17
DENSITY 23.5616
ALPHA 1e-005
DAMP 0.05
ISOTROPIC STEEL
E 2.05e+008
POISSON 0.3
DENSITY 76.8195
ALPHA 1e-005
DAMP 0.03
END DEFINE MATERIAL
MEMBER PROPERTY INDIAN
9 TO 11 13 TO 16 18 20 23 TABLE ST ISA75X75X6

Geleki supports
56
1 TO 4 6 TO 8 17 19 22 TABLE ST PIP2445H
25 TABLE ST PIP1016L
MEMBER PROPERTY INDIAN
27 PRIS YD 0.35 ZD 0.35
26 PRIS YD 0.5 ZD 0.5
CONSTANTS
MATERIAL STEEL MEMB 1 TO 4 6 TO 11 13 TO 20 22 23 25
MATERIAL CONCRETE MEMB 26 27
SUPPORTS
25 26 FIXED
MEMBER TRUSS
18 20 23 25
DEFINE WIND LOAD
TYPE 1
INT 1.26 HEIG 15
LOAD 1 DEAD LOAD
SELFWEIGHT Y -1
LOAD 2 PIPE EMPTY LOAD
MEMBER LOAD
10 11 CON GY -0.53 0.36
JOINT LOAD
11 FY -0.044
LOAD 3 PIPE FLUID LOAD
MEMBER LOAD
10 11 CON GY -0.32 0.36
JOINT LOAD
11 FY -0.01
LOAD 4 SEISMIC LOAD IN X DIR
MEMBER LOAD
10 CON GX 0.08 0.36
11 CON GX 0.039 0.36
LOAD 5 SEISMIC LOAD IN Z DIR
MEMBER LOAD
10 CON GZ 0.08 0.36
11 CON GZ 0.039 0.36
LOAD 6 WIND LOAD IN X DIR
WIND LOAD X 0.7 TYPE 1 XR 0 1 YR 0 14 ZR 0 1 OPEN
MEMBER LOAD
9 CON GX 0.0698 0.4
10 CON GX 0.198 0.4
13 CON GX 0.27 0.4
11 CON GX 0.4 0.4

Geleki supports
57
14 CON GX 0.4 0.4
15 CON GX 0.27 0.4
16 CON GX 0.2 0.4
JOINT LOAD
11 FX 0.079
12 14 FX 0.47
LOAD 7 WIND LOAD IN Z DIR
WIND LOAD Z 0.7 TYPE 1 XR 0 1 YR 0 14 ZR 0 1 OPEN
JOINT LOAD
11 12 14 TO 18 FZ 0.0001
*FACTORED LOAD COMBINATIONS
LOAD COMB 101 DL EL OL
1 1.5 2 1.5 3 1.5
LOAD COMB 102 DL EL OL SL-X
1 1.5 2 1.5 3 1.5 4 1.5
LOAD COMB 103 DL EL OL SL-Z
1 1.5 2 1.5 3 1.5 5 1.5
LOAD COMB 104 DL EL OL WL-X
1 1.5 2 1.5 3 1.5 6 1.5
LOAD COMB 105 DL EL OL WL-Z
1 1.5 2 1.5 3 1.5 7 1.5
LOAD COMB 106 DL WL
1 1.5 6 1.5
LOAD COMB 107 DL EL OL WL-X
1 1.5 2 1.5 3 1.5 6 -1.5
*UNFACTORED LOAD COMBINATIONS
LOAD COMB 201 DL EL OL
1 1.0 2 1.0 3 1.0
LOAD COMB 202 DL EL OL SL-X
1 1.0 2 1.0 3 1.0 4 1.0
LOAD COMB 203 DL EL OL SL-Z
1 1.0 2 1.0 3 1.0 5 1.0
LOAD COMB 204 DL EL OL WL-X
1 1.0 2 1.0 3 1.0 6 1.0
LOAD COMB 205 DL EL OL WL-Z
1 1.0 2 1.0 3 1.0 7 1.0
LOAD COMB 206 DL WL
1 1.0 6 1.0
LOAD COMB 207 DL EL OL WL-X
1 1.0 2 1.0 3 1.0 6 -1.0
PERFORM ANALYSIS
LOAD LIST 201 TO 207

Geleki supports
58
PARAMETER 1
CODE INDIAN
MAIN 1 MEMB 1 TO 4 6 TO 11 13 TO 20 22 23 25
CHECK CODE MEMB 1 TO 4 6 TO 11 13 TO 20 22 23 25
LOAD LIST 101 TO 107
START CONCRETE DESIGN
CODE INDIAN
FC 25000 MEMB 26 27
FYMAIN 415000 MEMB 26 27
FYSEC 415000 MEMB 26 27
DESIGN COLUMN 26 27
END CONCRETE DESIGN
FINISH

5.2 (STR2)
STAAD SPACE
START JOB INFORMATION
ENGINEER DATE 22-Sept-17
END JOB INFORMATION
INPUT WIDTH 79
UNIT METER KN
JOINT COORDINATES
2 0 0 0; 4 0 3.5 0; 7 0 9.06 0; 9 0 13.06 0; 10 0 14 0; 11 0.7 14 0;
12 0.6 13.06 0; 14 0.6 9.06 0; 19 0 13.3 0; 20 0 12.36 0; 22 0 8.36 0;
24 -1 0 0; 25 0 -1.5 0; 26 -1 -1.5 0;
MEMBER INCIDENCES
1 2 4; 3 4 22; 6 7 20; 8 9 19; 9 10 11; 10 9 12; 11 7 14; 17 19 10; 18 19 11;
19 20 9; 20 20 12; 22 22 7; 23 22 14; 25 24 4; 26 2 25; 27 24 26;
START USER TABLE
TABLE 1
UNIT METER KN
GENERAL
COMP100X8
0.006156 0.3 0.01026 0.3 0.01026 9.9e-005 9.9e-005 0.00014 0.000658 -
0.000658 0.004617 0.004617 4e-006 0.001504 0 0.27948
END
DEFINE MATERIAL START
ISOTROPIC CONCRETE
E 2.17185e+007
POISSON 0.17
DENSITY 23.5616
ALPHA 1e-005

Geleki supports
59
DAMP 0.05
ISOTROPIC STEEL
E 2.05e+008
POISSON 0.3
DENSITY 76.8195
ALPHA 1e-005
DAMP 0.03
END DEFINE MATERIAL
MEMBER PROPERTY INDIAN
9 TO 11 18 20 23 TABLE ST ISA75X75X6
1 3 6 8 17 19 22 TABLE ST PIP2191L
25 TABLE ST PIP1016L
MEMBER PROPERTY INDIAN
27 PRIS YD 0.35 ZD 0.35
26 PRIS YD 0.5 ZD 0.5
CONSTANTS
MATERIAL STEEL MEMB 1 3 6 8 TO 11 17 TO 20 22 23 25
MATERIAL CONCRETE MEMB 26 27
SUPPORTS
25 26 FIXED
MEMBER TRUSS
18 20 23 25
DEFINE WIND LOAD
TYPE 1
INT 1.26 HEIG 15
LOAD 1 DEAD LOAD
SELFWEIGHT Y -1
LOAD 2 PIPE EMPTY LOAD
MEMBER LOAD
10 11 CON GY -0.53 0.36
JOINT LOAD
11 FY -0.044
LOAD 3 PIPE FLUID LOAD
MEMBER LOAD
10 11 CON GY -0.32 0.36
JOINT LOAD
11 FY -0.01
LOAD 4 SEISMIC LOAD IN X DIR
MEMBER LOAD
10 CON GX 0.08 0.36
11 CON GX 0.039 0.36
LOAD 5 SEISMIC LOAD IN Z DIR

Geleki supports
60
MEMBER LOAD
10 CON GZ 0.08 0.36
11 CON GZ 0.039 0.36
LOAD 6 WIND LOAD IN X DIR
WIND LOAD X 0.7 TYPE 1 XR 0 1 YR 0 14 ZR 0 1 OPEN
JOINT LOAD
11 FX 0.079
12 14 FX 0.47
LOAD 7 WIND LOAD IN Z DIR
WIND LOAD Z 0.7 TYPE 1 XR 0 1 YR 0 14 ZR 0 1 OPEN
JOINT LOAD
11 12 14 FZ 0.0001
*FACTORED LOAD COMBINATIONS
LOAD COMB 101 DL EL OL
1 1.5 2 1.5 3 1.5
LOAD COMB 102 DL EL OL SL-X
1 1.5 2 1.5 3 1.5 4 1.5
LOAD COMB 103 DL EL OL SL-Z
1 1.5 2 1.5 3 1.5 5 1.5
LOAD COMB 104 DL EL OL WL-X
1 1.5 2 1.5 3 1.5 6 1.5
LOAD COMB 105 DL EL OL WL-Z
1 1.5 2 1.5 3 1.5 7 1.5
LOAD COMB 106 DL WL
1 1.5 6 1.5
LOAD COMB 107 DL EL OL WL-X
1 1.5 2 1.5 3 1.5 6 -1.5
*UNFACTORED LOAD COMBINATIONS
LOAD COMB 201 DL EL OL
1 1.0 2 1.0 3 1.0
LOAD COMB 202 DL EL OL SL-X
1 1.0 2 1.0 3 1.0 4 1.0
LOAD COMB 203 DL EL OL SL-Z
1 1.0 2 1.0 3 1.0 5 1.0
LOAD COMB 204 DL EL OL WL-X
1 1.0 2 1.0 3 1.0 6 1.0
LOAD COMB 205 DL EL OL WL-Z
1 1.0 2 1.0 3 1.0 7 1.0
LOAD COMB 206 DL WL
1 1.0 6 1.0
LOAD COMB 207 DL EL OL WL-X
1 1.0 2 1.0 3 1.0 6 -1.0

Geleki supports
61
PERFORM ANALYSIS
LOAD LIST 201 TO 207
PARAMETER 1
CODE INDIAN
MAIN 1 MEMB 1 3 6 8 TO 11 17 TO 20 22 23 25
CHECK CODE MEMB 1 3 6 8 TO 11 17 TO 20 22 23 25
LOAD LIST 101 TO 107
START CONCRETE DESIGN
CODE INDIAN
FC 25000 MEMB 26 27
FYMAIN 415000 MEMB 26 27
FYSEC 415000 MEMB 26 27
DESIGN COLUMN 26 27
END CONCRETE DESIGN
FINISH

5.3 (STR3)
STAAD SPACE
START JOB INFORMATION
ENGINEER DATE 09-OCT-17
END JOB INFORMATION
INPUT WIDTH 79
UNIT METER KN
JOINT COORDINATES
2 0 0 0; 4 0 3.06 0; 7 0 9.06 0; 9 0 13.06 0; 10 0 14 0; 11 0.7 14 0;
12 0.6 13.06 0; 14 0.6 9.06 0; 19 0 13.3 0; 20 0 12.36 0; 22 0 8.36 0;
24 -1 0 0; 25 0 -1.5 0; 26 -1 -1.5 0; 27 0 11.06 0; 28 0.7 11.06 0;
29 0 7.06 0; 30 0.7 7.06 0; 31 0 5.06 0; 32 0.7 5.06 0; 34 0.7 3.06 0;
35 0 1.06 0; 36 0.7 1.06 0;
MEMBER INCIDENCES
1 2 35; 3 4 31; 6 7 27; 8 9 19; 9 10 11; 10 9 12; 11 7 14; 17 19 10; 18 19 11;
19 20 9; 20 20 12; 22 22 7; 23 22 14; 25 24 4; 26 2 25; 27 24 26; 28 27 20;
29 27 28; 30 29 22; 31 29 30; 32 31 29; 33 31 32; 35 4 34; 36 35 4; 37 35 36;
START USER TABLE
TABLE 1
UNIT METER KN
GENERAL
COMP100X8
0.006156 0.3 0.01026 0.3 0.01026 9.9e-005 9.9e-005 0.00014 0.000658 -
0.000658 0.004617 0.004617 4e-006 0.001504 0 0.27948
END

Geleki supports
62
DEFINE MATERIAL START
ISOTROPIC CONCRETE
E 2.17185e+007
POISSON 0.17
DENSITY 23.5616
ALPHA 1e-005
DAMP 0.05
ISOTROPIC STEEL
E 2.05e+008
POISSON 0.3
DENSITY 76.8195
ALPHA 1e-005
DAMP 0.03
END DEFINE MATERIAL
MEMBER PROPERTY INDIAN
9 TO 11 18 20 23 29 31 33 35 37 TABLE ST ISA75X75X6
1 3 6 8 17 19 22 28 30 32 36 TABLE ST PIP2191M
25 TABLE ST PIP1016L
MEMBER PROPERTY INDIAN
27 PRIS YD 0.35 ZD 0.35
26 PRIS YD 0.5 ZD 0.5
CONSTANTS
MATERIAL STEEL MEMB 1 3 6 8 TO 11 17 TO 20 22 23 25 28 TO 33 35 TO 37
MATERIAL CONCRETE MEMB 26 27
SUPPORTS
25 26 FIXED
MEMBER TRUSS
18 20 23 25
DEFINE WIND LOAD
TYPE 1
INT 1.26 HEIG 15
LOAD 1 DEAD LOAD
SELFWEIGHT Y -1
LOAD 2 PIPE EMPTY LOAD
MEMBER LOAD
10 11 CON GY -0.53 0.36
JOINT LOAD
11 28 30 32 34 36 FY -0.044
MEMBER LOAD
10 CON GY -1.8 0.15
LOAD 3 PIPE FLUID LOAD
MEMBER LOAD

Geleki supports
63
10 11 CON GY -0.32 0.36
JOINT LOAD
11 28 30 32 34 36 FY -0.01
MEMBER LOAD
10 CON GY -1.2 0.15
LOAD 4 SEISMIC LOAD IN X DIR
MEMBER LOAD
10 CON GX 0.08 0.36
11 CON GX 0.039 0.36
10 CON GX 0.21 0.15
LOAD 5 SEISMIC LOAD IN Z DIR
MEMBER LOAD
10 CON GZ 0.08 0.36
11 CON GZ 0.039 0.36
10 CON GZ 0.21 0.15
LOAD 6 WIND LOAD IN X DIR
WIND LOAD X 0.7 TYPE 1 XR 0 1 YR 0 14 ZR 0 1 OPEN
JOINT LOAD
11 28 30 32 34 36 FX 0.079
12 14 FX 0.47
MEMBER LOAD
10 CON GX 0.143 0.15
29 CON GX 0.18 0.4
11 CON GX 0.18 0.4
31 CON GX 0.18 0.4
33 CON GX 0.18 0.4
35 CON GX 0.18 0.4
37 CON GX 0.125 0.4
LOAD 7 WIND LOAD IN Z DIR
WIND LOAD Z 0.7 TYPE 1 XR 0 1 YR 0 14 ZR 0 1 OPEN
JOINT LOAD
11 12 14 28 30 32 34 36 FZ 0.0001
*FACTORED LOAD COMBINATIONS
LOAD COMB 101 DL EL OL
1 1.5 2 1.5 3 1.5
LOAD COMB 102 DL EL OL SL-X
1 1.5 2 1.5 3 1.5 4 1.5
LOAD COMB 103 DL EL OL SL-Z
1 1.5 2 1.5 3 1.5 5 1.5
LOAD COMB 104 DL EL OL WL-X
1 1.5 2 1.5 3 1.5 6 1.5
LOAD COMB 105 DL EL OL WL-Z

Geleki supports
64
1 1.5 2 1.5 3 1.5 7 1.5
LOAD COMB 106 DL WL
1 1.5 6 1.5
LOAD COMB 107 DL EL OL WL-X
1 1.5 2 1.5 3 1.5 6 -1.5
*UNFACTORED LOAD COMBINATIONS
LOAD COMB 201 DL EL OL
1 1.0 2 1.0 3 1.0
LOAD COMB 202 DL EL OL SL-X
1 1.0 2 1.0 3 1.0 4 1.0
LOAD COMB 203 DL EL OL SL-Z
1 1.0 2 1.0 3 1.0 5 1.0
LOAD COMB 204 DL EL OL WL-X
1 1.0 2 1.0 3 1.0 6 1.0
LOAD COMB 205 DL EL OL WL-Z
1 1.0 2 1.0 3 1.0 7 1.0
LOAD COMB 206 DL WL
1 1.0 6 1.0
LOAD COMB 207 DL EL OL WL-X
1 1.0 2 1.0 3 1.0 6 -1.0
PERFORM ANALYSIS
LOAD LIST 201 TO 207
PARAMETER 1
CODE INDIAN
MAIN 1 MEMB 1 3 6 8 TO 11 17 TO 20 22 23 25 28 TO 33 35 TO 37
CHECK CODE MEMB 1 3 6 8 TO 11 17 TO 20 22 23 25 28 TO 33 35 TO 37
LOAD LIST 101 TO 107
START CONCRETE DESIGN
CODE INDIAN
FC 25000 MEMB 26 27
FYMAIN 415000 MEMB 26 27
FYSEC 415000 MEMB 26 27
DESIGN COLUMN 26 27
END CONCRETE DESIGN
FINISH