VISUAL INSPECTION REPORT

Customer : Report No. : 04/VIR/LO/IV/17


Project : SPPr No. :
Item Name : Refernsi Standard : ASME B 31.3

Welding Welder Welding Check of Completed Weld


NO Drawing No Joint No WPS No. Sch Result Remark
Process Stamp Date Reinforcement Weld Surface
LINE 14" - MPS - 3A - 003 - H - 135 DRAWING NO : PLMB - 160346 - 43 - DWG - 002 SHEET 4 OF 9
PLMB - 160346 - 43 - DWG - 80
1 J-1 19/MB/GTAW/IV/08 GTAW W.06 20-Feb-17 2 GTAW ACC
002 SHEET 4 OF 9 80S
PLMB - 160346 - 43 - DWG - 80S
2 J--2 1/MB/GTAW/X/06 GTAW W.06 20-Feb-17 2 GTAW ACC
002 SHEET 4 OF 9 80S
PLMB - 160346 - 43 - DWG - 80S
3 J-3 1/MB/GTAW/X/06 GTAW W.06 11-Apr-17 2 GTAW ACC
002 SHEET 4 OF 9 80S
PLMB - 160346 - 43 - DWG - 6 mm
4 002 SHEET 4 OF 9 J-3A 1/MB/GTAW/X/06 GTAW W.06 11-Apr-17 2 GTAW ACC
80S
PLMB - 160346 - 43 - DWG - 80S
5 J-4 1/MB/GTAW/X/06 GTAW W.06 8-Apr-17 2 GTAW ACC
002 SHEET 4 OF 9 #600

Prepared By Reviewed / Witnessed by Reviewed / Witnessed by

Date : Date : Date :