SAUDI ARAMCO INSPECTION CHECKLIST
Final Fill Inspection SAIC-A-1006 24-Mar-16 Civil
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

Cohesive fill under footings, grade beams, mats, buildings and process
SAES-A-114
A1 areas shall have been compacted to at least 90% of Modified Proctor
Sec. 6.3.6
Density to ASTM D1557 or per project requirements, whichever is higher.

Cohesionless fill under footings, grade beams, mats, buildings and


SAES-A-114
A2 process areas shall have been compacted to 70% relative density per
Sec. 6.3.6
ASTM D4253 and D4254 or per project requirements, whichever is higher.

Fill under foundations with static loads over 320kPa (6500psf) and
foundations for vibrating or heavy equipment, and for asphalt and
SAES-A-114
A3 concrete pavements, fill shall be compacted to 85% of relative density for
Sec. 6.3.6.2
cohesionless soils or 95% of maximum density per ASTM D1557 for
cohesive materials, or per project requirements whichever is higher.

Compacted surfaces of fill and backfill shall be finish graded to the cross SAES-A-114
A4
sections, lines, grades and elevations as indicated on the drawings. Sec. 6.3.7

Fill Material' shall be used for all fills except where 'Select Fill Material' is
specified. As a minimum, 'Select Fill Material' shall be used within 0.6 m
(2 ft) of the bottom elevation of foundations, spread footings, or slabs-on- SAES-A-114
A5
grade when fill is required to achieve final grade. 'Select Fill Material' shall Sec. 6.3.1
also be specified for backfill which will be in contact with concrete or steel
structures.

REMARKS:

REFERENCE DOCUMENTS:
1- SAES-A-114 -- Excavation and Backfill, 30 Sept 2014

Contractor / Third-Party Saudi Aramco


Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Inspector PID Representative


Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Proponent and Others


Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:

*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED