Professional Documents
Culture Documents
SEMESTER PROJECT
Description:
- The team can encode the model EXCEL SOLVER or LINGO or CPLEX to solve the
Requirements:
- This is semester project that is group working. Students register to form a group of
about 3- 5 people.
- The team should work together to study carefully the asset to perform the following
jobs:
o Solve the small size problem by EXCEL SOLVER or CPLEX or LINGO with
assumed data
o Conclusions
- Finally, each group must submit a professional report (hardcopy + softcopy) and
having a presentation (with slides in 10 minutes) with Q&A sections at the end.
Deterministic Models in Operations Research
2. TIMELINE
Step Jobs to do Duration
1 Group register 2 weeks
2 Study the problem 1 week
3 Model development 2 weeks
4 Sovle the problem with assumed data 5 weeks
5 Sensitivity Analysis 2 weeks
6 Propose Applications 1 week
7 Write report 1 week
8 Submission and presentation 1 week
Maximum
Criteria Your mark
mark
Problem Identification
1 10
2 Model Development 25
3 Problem Solving 25
4 Applications 15
Deterministic Models in Operations Research
Writing report
5 10
(grammar, readability, format and flow)
Oral Defense
6 15
(giving clear presentation and satisfactory answers)
Total 100
Penalty:
tons of wood in year j. Formulate the problem of determining a schedule with maximum
wood yeild
Problem 4: The Mystic Coffee Shop blends coffee on the premises for its customers. It
sells three basic blends in one-pound bags: Special, Mountain Dark, and Mill Regular. It
uses four different types of coffee to produce the blends: Brazilian, mocha,
Colombian, and mild. The shop used the following blend recipe requirements:
The cost of Brazilian coffee is $2.00 per pound, the cost of mocha is $2.75 per pound,
the cost of Colombian is $2.90 per pound, and the cost of mild is $1.70 per pound.
The shop has 110 pounds of Brazilian coffee, 70 pounds of mocha, 80 pounds of
Colombian, and 150 pounds of mild coffee available per week. The shop wants to
know the amount of each blend it should prepare each week in order to maximize
profit. Formulate and solve a linear programming model for
this problem.
Problem 5: Consider a set of potential sites N = {1,2,…,n} for the location of fire
stations. A station placed at j cost cj. We are also given a set of communities M =
{1,2,…., m} that have to be protected. The subset of communities that can be
protected from a station located at j is Mj. For example, Mj might be the set of
communities that can be reached from j in 10 minutes. Then the problem of choosing
a minimum-cost set of locations for the fire stations such that each momunity can be
reached from some fire station(s) in 10 min.
Problem 6: The Weigelt Corporation has three branch plants with excess production capacity.
Fortunately, the corporation has a new product ready to begin production, and all three plants
have this capability, so some of the excess capacity can be used in this way. This product can be
made in three sizes--large, medium, and small--that yield a net unit profit of $420, $360, and
$300, respectively. Plants 1, 2, and 3 have the excess capacity to produce 750, 900, and 450 units
per day of this product, respectively, regardless of the size or combination of sizes involved.
The amount of available in-process storage space also imposes a limitation on the
production rates of the new product. Plants 1, 2, and 3 have 13,000, 12,000, and 5,000 square
feet, respectively, of in-process storage space available for a day's production of this product.
Each unit of the large, medium, and small sizes produced per day requires 20, 15, and 12 square
feet, respectively.
Sales forecasts indicate that if available, 900, 1,200, and 750 units of the large, medium,
and small sizes, respectively, would be sold per day.
Deterministic Models in Operations Research
At each plant, some employees will need to be laid off unless most of the plant’s excess
production capacity can be used to produce the new product. To avoid layoffs if possible,
management has decided that the plants should use the same percentage of their excess capacity
to produce the new product.
Management wishes to know how much of each of the sizes should be produced by each
of the plants to maximize profit.
Formulate and solve a linear programming model for this problem.
Problem 7: CASE 3.1 Auto Assembly question (a) only and using LINGO or CPLEX to
solve the model (in the Hillier and Liberman’s book)
Problem 8: CASE 4.1 Fabrics and Fall Fashions question (b) only and using LINGO or
CPLEX to solve the model (in the Hillier and Liberman’s book)
Problem 9: CASE 6.1 Controlling Air Pollution question (a) only and using LINGO or
CPLEX to solve the model (in the Hillier and Liberman’s book)
Problem 10: CASE 9.1 Money in Motion question (a) only and using LINGO or CPLEX to
solve the model (in the Hillier and Liberman’s book)
Problem 11: CASE 11.1 Capacity Concerns question (b) only and using LINGO or CPLEX
to solve the model (in the Hillier and Liberman’s book)