Authority's Engineer (AE) Review conforming to Clause 10.

2 of the EPC Agreement Annexure-A - Page 1 of 1


AE Review Reference Letter: Letter No.: OG/EPC/TL/097 Date:25.01.2020
Contractor's Submittal Reference: Letter No.: JKIL/NHAI/DEW/Pkg-02/85 Date: 18.01.2020 Date Received on: 18.01.2020.
Short Description of Submission Alignment Plan and profile for MC02 from Km.6+673.323 to km.8+800

Sr. AE Comments Contractor's AE Comments Remarks


Description
No. Category* Comments Response Category Comments
The contractor has submitted drawings with Revision R1 and
Plan and Profile Drawing nos,
mentioned “REVISED AS PER AUTHORITY ENGINEERS
SC-960-S-PPD-0504, Rev. R1
COMMENTS & ISSUED FOR APPROVAL” Duly noted and
1. SC-960-S-PPD-0505, Rev. R1 B
It may be noted that this being the first submission received incorporated
SC-960-S-PPD-0506, Rev. R1
by AE, there are no comments issued prior to this review. This
may be corrected accordingly.

The profiles for Service roads and At-grade


Plan and Profile Drawing nos,
Roads/improvements are missing. Vertical clearance depends
SC-960-S-PPD-0504, Rev. R1
on the at-grade improvements and the depth of the Noted and
2. SC-960-S-PPD-0505, Rev. R1 B
superstructure. The Longitudinal profile of the Main incorporated
SC-960-S-PPD-0506, Rev. R1
carriageway shall be reviewed and checked for conformity to
requirements of Vertical Clearance as per provisions of
schedule B,C and D
Refer separate
document
pertaining to
deviation with
Drawing No. SC-960-S-PPD- respect to
0506, Rev.R1 The Design Speed for Curve 1 is mentioned as 70 kmph. contract
3.
Curve 1 Justifications for deviation from the schedule D shall be documents (
Design Speed submitted No. SC-960-S-F-
-DN-0844) as
concluded in
meeting dated.
09.01.2020

A Reviewed and Approved Approved after all review comments are compiled including allied project components.
* Comment Categories: B Reviewed with Observations and Comments Reviewed. Revisions are to be done with compliance and to be resubmitted for approval.
C Returned for Resubmission Submissions returned due to Major non-compliances. To be resubmitted to begin review

Bridge Engineer Sign/Date D.Bhattachryya


Sign/Date
/Highway Engineer (Team Leader)
Authority's Engineer (AE) Review conforming to Clause 10.2 of the EPC Agreement Annexure-A - Page 1 of 1
AE Review Reference Letter: Letter No.: OG/EPC/TL/097 Date:25.01.2020
Contractor's Submittal Reference: Letter No.: JKIL/NHAI/DEW/Pkg-02/85 Date: 18.01.2020 Date Received on: 18.01.2020.
Short Description of Submission Alignment Plan and profile for MC0R from Km 5+755.646 to km.8+300

Sr. AE Comments Contractor's AE Comments Remarks


Description
No. Category* Comments Response Category Comments
Plan and Profile Drawing nos,
The contractor has submitted drawings with Revision R1 and
SC-960-S-PPD-0511, Rev. R1
mentioned “REVISED AS PER AUTHORITY ENGINEERS
SC-960-S-PPD-0512, Rev. R1 Shall be duly
COMMENTS & ISSUED FOR APPROVAL”
1. SC-960-S-PPD-0513, Rev. R1 B incorporated
It may be noted that this being the first submission received
SC-960-S-PPD-0514, Rev. R1 accordingly.
by AE, there are no comments issued prior to this review. This
may be corrected accordingly.

Plan and Profile Drawing nos,


The profiles for Service roads and At-grade
SC-960-S-PPD-0511, Rev. R1
Roads/improvements are missing. Vertical clearance depends
SC-960-S-PPD-0512, Rev. R1 Shall be duly
on the at-grade improvements and the depth of the
2. SC-960-S-PPD-0513, Rev. R1 B incorporated
superstructure. The Longitudinal profile of the Main
SC-960-S-PPD-0514, Rev. R1 accordingly.
carriageway shall be reviewed and checked for conformity to
requirements of Vertical Clearance as per provisions of
schedule B,C and D

A Reviewed and Approved Approved after all review comments are compiled including allied project components.
* Comment Categories: B Reviewed with Observations and Comments Reviewed. Revisions are to be done with compliance and to be resubmitted for approval.
C Returned for Resubmission Submissions returned due to Major non-compliances. To be resubmitted to begin review

Bridge Engineer Sign/Date D.Bhattachryya


Sign/Date
/Highway Engineer (Team Leader)