You are on page 1of 1

1 2 3 4 5 6 7 8 9 10 11 12

GENERAL NOTES:
VERTICAL IS 1. TWELVE (12) UNITS REQUIRED AS SHOWN TOTAL.
(+) UP FOUR (4) UNITS REQUIRED FOR PROJECT V17517.
"Z"
FOUR (4) UNITS REQUIRED FOR PROJECT V17518.
FOUR (4) UNITS REQUIRED FOR PROJECT V17519.
2. ALL PLATFORM ELEVATIONS ARE TO TOP OF GRATING
A AND/OR CHECKERED PLATE. A
3064mm OUTSIDE DIA. 3. BOX 1, BOX 2, & SPOOL DUCT SIDE CASINGS REMOVED FOR
10'-05 8" CLARITY.
GAS FLOW 4. BLOWDOWN TANK & PIPING AT GRADE NOT SHOWN.
(+) TRANSVERSE
(+) LONGITUDINAL 5. "N.S." = NEAR SIDE
(INTO PAGE)
"Y" "X" "F.S." = FAR SIDE
6. ALL STAIRS TREADS ARE 191mm (7 1/2") RISE, 254mm (10") RUN.
STACK ELEV. 27432mm
COORDINATE (0,0,0)
IS CENTERLINE OF HRSG 90'-0"
UNIT. TOP OF CONCRETE
REF. ELEV. 0'-0" AT INLET FACE
REG. OF INLET EXPANSION JOINT
HAD50BR001
HAH50BR001
HAD50BR002

B 96" ID LP DRUM HAD10BR013 B


CL ELEV. 20750mm
68'-015 16"

HAH10BR001 23317mm T.O.G.


76'-6"

22555mmT.O.G.
74'-0"

21641mm T.O.G.
71'-0"
60" ID HP DRUM
CL ELEV. 20510mm HAC10BR003
67'-312" HAC10BR003
C C
℄DRUM

HAD10BR305 (N.S.)
℄DRUM

HAD10BR317 HAD10BR301 (F.S.)


914mm 914mm 19050mm T.O.G.
3'-0" 3'-0" HAD10BR313 62'-6"
HAD10BR309 OUTSIDE CASING
178mm

1524mm
7"

LA3H / HIGH LEVEL CUTOFF + 127mm (+ 5")

5'-0"
LA2H / HIGH LEVEL ALARM &
DRUM SWELL LEVEL + 51mm (+ 2")
LBA10BR005
FRONT FRONT
℄DRUM LAH / DRUM CENTER LINE 0mm (0")
NWL / NORMAL WATER LEVEL - 76mm (- 3") ℄ TOP HEADERS
964mm

LAL - 152mm (- 6")


3'-2"

LA2L / LOW LEVEL ALARM - 229mm (- 9")


STARTUP LEVEL - 330mm (- 13")

1997mm
6'-65 8"
LA3L / LOW LEVEL CUTOFF - 559mm (- 22")

2530mm
D D

8'-35 8"
HAD10BR319
305mm HAD10BR311
1'-0" HAD10BR307 (N.S.) 305mm
HAD10BR303 (F.S.) 1'-0" REFERENCE DRAWINGS:
HAD10BR315
V1751X-GAND-0001 THRU 0003 : GENERAL ARRANGEMENTS
V1751X-SEND-0001 THRU 0002 : BOILER SETTINGS
60" I.D. HP DRUM 60" I.D. HP DRUM 2438mm V1751X-ICND-0001 THRU 0008 : P&ID'S
LEFT HEAD RIGHT HEAD 8'-0" V1751X-FLND-0001 : FOUNDATION DIAGRAM
SCALE: 14" = 1'-0" SCALE: 14" = 1'-0" V1751X-SENF-0001 : GENERAL NOTES AND DATA

2896mm
9'-6"
℄DRUM

2438mm

E E

13106mm (FINNED LENGTH)


8'-0"
℄DRUM

GAS TEMPERATURE 254°C (490°F)

GAS TEMPERATURE 163°C (326°F)


HAD50BR303

LP DOWNCOMER HAD50BR003
05

LPSH1 - HAH50AC001

LPEC1 - HAC50AC001
LPEC2 - HAC50AC002
LPEC3 - HAC50AC003
LPEC4 - HAC50AC004
LPEC5 - HAC50AC005
LPEC6 - HAC50AC006
LPEV1 - HAD50AC001
LPEV2 - HAD50AC002
LPEV3 - HAD50AC003
LPEV4 - HAD50AC004
LPEV5 - HAD50AC005
1295mm 1295mm
04

13748mm
4'-3" 4'-3"

2896mm

45'-114"
HAD50BR309 HAD50BR307 (N.S.)

43'-0"
℄ OF GAS PATH

9'-6"
HAD50BR305 03
HAD50BR301 (F.S.)

HP DOWNCOMER HAD10BR002
406mm

HPSH1 - HAH10AC001
HPSH2 - HAH10AC002
HPSH3 - HAH10AC003
02 GENERAL REVISION/CUSTOMER COMMENTS 16-NOV-18 GLK WLK --- DP

HPEV1 - HAD10AC001
GAS TEMPERATURE 492°C (917°F)

GAS TEMPERATURE 254°C (490°F)


1'-4"

HPEC1 - HAC10AC001
HPEC2 - HAC10AC002
HPEC3 - HAC10AC003
HPEV2 - HAD10AC002
HPEV3 - HAD10AC003
HPEV4 - HAD10AC004
LA3H / HIGH LEVEL CUTOFF + 356mm (+ 14") 01 GENERAL REVISION/CUSTOMER COMMENTS 21-AUG-18 GLK WLK --- DP
2438mm

LA2H / HIGH LEVEL ALARM &


8'-0"

DRUM SWELL LEVEL + 305mm (+12") 00 FIRST ISSUE 30-MAY-18 GLK WLK --- DP
LAH + 254mm (+ 10")
FRONT FRONT NWL / NORMAL WATER LEVEL + 178mm (+ 7") Rev. Description Date Drawn Chkd. Chkd. Appr.
℄DRUM LAL + 102mm (+ 4")
LA2L / LOW LEVEL ALARM + 25mm (+ 1") 333mm 1245mm 311mm
1 2

Revisions
DRUM CENTER LINE & 1'-118" 4'-1" 1'-014"
1346mm

STARTUP LEVEL______0mm (0")


This drawing contains Vogt Power International's confidential and proprietary information and cannot be used,
4'-5"

279mm
11" duplicated or disclosed in whole or in part, except with the express written permission of Vogt Power International.

2896mm
(2 SPC.) @ (5 SPC.) @ EXCEPT AS EXPRESSLY STATED IN ANY WRITTEN CONTRACT - ALL WARRANTIES RELATING TO THIS DRAWING,

9'-6"
LA3L / LOW LEVEL CUTOFF - 889mm (- 35") INCLUDING THE WARRANTIES OF MERCHANTABILITY AND FITNESS, ARE DISCLAIMED.
229mm (9") 229mm (9")
Vogt Power International, Inc. all rights reserved as an unpublished work.
F HAD50BR306
464mm 464mm 289mm F
1'-614" 1'-614" 113 8"
2438mm

289mm
333mm
113 8"
8'-0"

1270mm 254mm PROJECT:


1'-118"
10"
HAD50BR310 HAD50BR308 (N.S.) 813mm 4'-2"
2'-8" (2 SPC.) @ (2 SPC.) @
HAD50BR302 (F.S.)
457mm 457mm 279mm 229mm
HAD50BR304 (2 SPC.) @
279mm
MSU BARKER PROJECT
1'-6" 1'-6" A PROJECT NO. V17517
10125mm
33'-25 8"

0002 GE IPS NO.: 1227368


UNIT NO's.: 211, 212, 213, 214

2530mm
96" I.D. LP DRUM 96" I.D. LP DRUM

8'-3 8"
1997mm

5
MSU ROJO PROJECT

6'-65 8"
LEFT HEAD RIGHT HEAD
SCALE: 14" = 1'-0" SCALE: 14" = 1'-0" PROJECT NO. V17518
GE IPS NO.: 1227366
UNIT NO's.: 111, 112, 113, 114
℄ BOTTOM HEADERS
MSU VILLA MARIA PROJECT

1524mm
G GAS FLOW PROJECT NO. V17519 G

5'-0"
GE IPS NO.: 1227378
HAH10BR004
UNIT NO's.: 311, 312, 313, 314
OUTSIDE CASING
& CHEM. CLEAN
2515mm

914mm
3'-0"
8'-3"

HAH11BR001

1727mm
& CHEM. CLEAN

5'-8"
TOP OF GROUT HAH11BR201
ELEV. 38mm (0'-112")
HAH10BR203
ELEV. 0'-0" (0mm) Disposal Code:
TOP OF CONCRETE Title / Subtitle:
BOILER SETTING
914mm
3'-0"

℄ OF UNIT (REF.) RIGHT SIDE ELEVATION


ELEV. 0'-0" (0mm) LAB60BR001 HAD50BR031 LCA80BR001 HNE10BR201
HAD10BR021 & CHEM. CLEAN SCALE DATE 21-MAY-18 25-MAY-18 30-MAY-18
& CHEM. CLEAN LAB60BR005 3
LBA30BR201 16" = 1'-0" NAME GLK WLK DP
LAB60BR004 SIZE VISA

H 3048mm 3048mm 3632mm 1245mm 3632mm 3159mm A1 MADE CHECKED APPROVED H


10'-0" 10'-0" 11'-11" 4'-1" 11'-11" 3
10'-4 8" GE Proprietary Information - This document
contains Proprietary and Exclusive
REVISION 02
A B C D E LBA30BR002 F G content. All persons or legal entities receiving
this information shall be deemed by the act of
Modification
Instruction

its receipt to have contractually agreed to


18822mm make no duplications, reproductions of any
nature by any means, modifications,
3rd ANGLE
61'-9" PROJECTION
disclosures, or use any portion of this
Ref Number: V1751X-SEND-0001 Section Doc.
material; except as is expressly authorized in
writing by General Electric International
and/or its legitimate affiliates
Sheet No SHEET 1 OF 1