"LA LOMA - ENEL" 187,36 MWp - Panels 460 Wp


PANELS STRINGS STRUCTURES CABIN STRING BOX
MWp
460 Wp (28 PANELS) 2X42 INVERTER (12/21 IN)
721
187,36 407.316 14.547 4.849 22 66 with 12 IN
N 655 with 21 IN

A A
DESCRIPTION Q.TY
W E
SOLAR AREA 373,32 Ha

S FENCING 7.950 m.
9.373 Ha
B 01 ENTRANCE GATE FIELD 2 B
DETALLE 12 02DETALLE 13 AREA MODULOS 282,05 Ha

R5,52

R5
,5
2
1+447

CABIN INVERTER 22

0+000
CP07.1 CP07.12
CP07.2 CP07.11

1+440
,1 5 5
,1
R7 R7

0+020
01 02

1+420
INTERNAL ROADS PV FIELD (3m) 7.985 m.

0+040

1+400
0+060

1+380
ACCESS ROADS PV FIELD (6m) 135 m.

0+080

1+360
0+100

1+340
C PITCHS 12,31 m. C

0+120

1+320
0+140

1+300
0+160

1+280
CP07 CP07

0+180

1+260
0+200

1+240
0+220

1+220
0+240

1+200
0+260

1+180
0+280

1+160
03

0+300

1+140
D D

0+320

1+120
0+340

1+100
04

0+360

1+080
0+380

1+060
0+400

1+040
0+420

1+020
0+440

1+000
0+460

0+980
DETALLE 16

0+480

0+960
0+500

0+940
E E

0+520
CP07

0+920
CP07.3

CP07.10
R5

R5
PC: 0+540.87

0+540
PT: 0+902.23

CP05.4
PC: 0+000

00
0+9
0+560 0+580 0+600 0+620 0+660 0+680 0+700 0+720 0+740 0+760 0+780 0+800 0+820 0+840 0+860 0+880

0+333
9,7 CP07.4
CP07.5
CP07.6 0+640
CP07.7
CP07.8
CP07.9
2 PC: 0+892.02
PT: 0+551.09
R5

R5

CP05.3
0+320
PT: 0+010.21

0+300
0+280
DETALLE 15

0+260
DETALLE 14 DETALLE 8

0+240
0+220
0+200
05 06 CP05 07

R5

R5
,52

,5
2
CP04.4

CP06.4
CP06.3
CP04.3
0+180

0+180
0+
18
0+184 0+183 0

F 5
F

5
,1

,1
R7

R7
0+160

0+160

0+160
0+140

0+140

0+140
0+120

0+120

0+120
CP04 CP06

0+100

0+100

0+100
0+080

0+080

0+080
DETALLE 6 DETALLE 7 DETALLE 3

0+060

0+060

0+060
DETALLE 1 DENOMINACIÓN CAMINOS

0+040

0+040

0+040
CP01 CP01 CP01

0+020

0+020

0+020
PT: 0+010.21 PT: 0+010.21 PT: 0+010.21

CP04.2

CP05.2

CP06.2
R5

R5

R5
R5
R5
R5

CP01.19
PC: 0+000 PC: 0+000

CP03.1

CP02.1
PC: 2+404.45 PT: 1+039.60
PC: 0+000 .1 PC: 0+000 PC: 0+000

0+000

0+000

0+000

0+000

0+000
CP01.28 CP01.26 CP01.24 CP01.22 05
CP01.27 CP01.25 CP01.23 CP CP 01.21
CP01.20 CP01.18
CP01.17
CP01.16
CP01.15

CP04.1

CP06.1
2+400 2+380 2+360 2+340 2+320 2+300 2+280 2+260 2+240 2+220 2+200 2+180 2+160 2+140 2+120 2+100 2+080 2+060 2+040 2+020 2+000 1+980 1+960 1+940 1+920 1+900 1+880 1+860 1+840 1+820 1+800 1+780 1+760 1+740 1+720 1+700 1+680 1+660 1+640 1+620 1+600 1+580 1+560 1+540 1+520 1+500 1+480 1+460 1+440 1+420 1+400 1+380 1+360 1+340 1+320 1+300 1+280 1+260 1+240 1+220 1+200 1+180 1+160 1+140 1+120 1+100 1+080 1+060 1+040
PT: 2+414.66 PC: 1+025.80

R5

ACC.X

R5
R

R5
CP02.2 CP01.14

CP03.2
CP01.29

2
5

R1
2+420

1+
PT: 0+010.21 PT: 0+010.21
5

020
2,2

0+020

0+020
G G

1+00
2+440

NÚMERO

0
0+040

0+040

0+98
2+460

DETALLE 4

0
DETALLE 2

0+060

0+060

0+96
0
2+480

PT: 0+946.44

0+080

0+080
CP01.13
R12 CP01.12

0+940
ACCESO
CP01.11
PC: 0+940.34
2+500

0+100

0+100

0+920
C.P.X.
2+520

0+120

0+120

0+900
2+540

NÚMERO
08

0+140

0+140
09 10

0+880
CP01
2+560

0+160

0+160
PARQUE

0+860
2+580

0+180

0+180

0+840
CAMINO
2+600

0+200

0+200

0+820
2+620

21

0+220

0+220

0+800
H H
2+640

0+240

0+240
CP02

0+780
2+660

0+260

0+260

0+760
2+680

0+280

0+280

0+740
2+700

CP01

0+300

0+300
CP03

0+720
2+720

0+320

0+320

0+700
2+740

0+340

0+340

0+680
2+760

0+360

0+360

0+660
2+780

0+380

0+380

0+640
2+800

0+400

0+400

0+620
2+820

0+420

0+420

0+600
L L
2+840

0+440

0+440

0+580
2+860

DETALLE 5
0+460

0+460
11 12 13

0+560
2+880

0+480

0+480

0+540
2+900

0+500

0+500

0+520
2+920

22
0+520

0+520

0+500
2+940

0+540

0+540

0+480
2+960

0+560

0+560

CP01.10
0+460

5
R
PT: 0+457.12
PT: 0+203.40
2+980

CP01.9 CP01.7
CP01.8 0+ CP01.6
0+440 0+420 0+400 0+380 0+360 0+340 0+320 0+300 0+280 0+260 0+240 0+220 20
0
0+580

0+580

PC: 0+446.91
PC: 0+193.18

R5 CP01.5

CP01
3+000

0+180
0+600

0+600
22
3+020

0+160
0+620

0+620
M M
3+040

0+140
0+640

0+640
3+060

0+120
0+660

0+660
3+080

0+100
0+680

0+680
INSLATACION DE
SOPORTE
3+100

16
zona temporal

0+080
0+700

0+700
ALMACEN
3+120

ACC01.4

0+060
SUBESTACION
ELEVADORA
0+720

0+720

RESIDUOS NO
PELIGROSOS
AREA DE
PARKING
3+140

ESTACIONAMIENTO

0+040
OFICINAS

PELIGROSOS
RESIDUOS
AREA DE

CP01.4
0+740

0+740
14 15
3,7
R1

ACC01
PT: 0+029.66

R10
3+160

3
ACC01.3

CP01.
0+
02
CP

0
01
0+760

0+760

5.87
.2
R15

01
: 0+
0+

PC
00 CP01.1
0
3+180

PARKING ACC01.2
0+780

0+780
ZONA DE DESCARGA
3+200

ACCESS GATE 1
0+800

0+800
ACC01.1

Acceso 1 Km2+201
3+220

0+820

0+820

N N
3+240

0+840

0+840

DETALLE 17
3+260

0+860

0+860
3+280

0+880

0+880
3+300

0+900

0+900
3+320

CP02
0+920

0+920
3+340

CP03
0+940

0+940
3+360

CP01
0+960

0+960

19
3+380

0+980

0+980
3+400

1+000

1+000
3+420

1+020

1+020

P P
3+440

1+040

1+040

17
3+460

18
1+060

1+060
3+480

1+080

1+080
3+500

1+100

1+100
3+520

18 20
1+120

1+120

R7 R7

20
,1 ,1 ,15
5 5
17
R7
3+540
CP01.30

NOTAS:
1+142
CP01.31 CP03.4 1+140
CP03.3 CP02.3
3+551 1+140 CP02.4
1+144
R5,52

R5,52

R5,52

DETALLE 9 · Todas las unidades están en el SI de medidas.


DETALLE 10 DETALLE 11 · Sistema de coordenadas: WGS84 UTM 18N
· Ancho de caminos internos 3m
Q · Ancho de caminos de acceso 6m Q
· Radio mínimo de giro: 5m caminos internos, 15m caminos de acceso.

REFERENCIAS:

· GRE.EEC.D.99.CO.P.10036.03.003.00 - General Layout of PV Field


· GRE.EEC.D.99.CO.P.10036.03.004.00 - Internal roads general Layout with coordinates
ZODME 1 ACOPIO VEGETAL · GRE.EEC.C.99.CO.P.10036.00.109.00 - Calculation notes and TTSS internal roads
ACC02.2

Acceso 2 Km2+965
ACC02.1

· GRE.EEC.D.99.CO.P.10036.03.014.00 - Layout Plan of Drainage system & Details of all


ZODMES the interferences (roads, water course, cabins,etc)
R ACCESS GATE 2 R

ZODME 2
01 16.02.2021 ISSUED (RELEASE 0.3) K. MERCADO F. MERINO A. IAMUNDO

00 03.02.2021 ISSUED (RELEASE 0.1) K. MERCADO F. MERINO A. IAMUNDO

REV. DATE DESCRIPTION PREPARED CHECKED APPROVED


CONTRACTOR'S LOGO PROJECT:
PV PLANT "LA LOMA-ENEL" (COLOMBIA)

S S
LATAM FILE NAME:
20C025-2C014 GRE.EEC.D.99.CO.P.10036.03.004.00.dwg
CLASSIFICATION: FORMAT: SCALE: PLOT SCALE: SHEET:

FOR VALIDATION A0 S/E 1:1 1 di / of 5


UTILIZATION SCOPE: TITLE:

PV "LA LOMA"
ISSUED FOR CONSTRUCTION Internal roads - General layout
T GRE VALIDATION (with coordinates) T
VALIDATED BY A. GOMEZ
LAYOUT GENERAL GRE CODE
Escala 1:4000 VERIFIED BY A. MEDINA GROUP FUNCTION TYPE ISSUER COUNTRY TEC. PLANT SYSTEM PROGRESSIVE REVISION

COLLABORATORS F. NOPE GRE EEC D 9 9 C OP 1 0 0 3 6 0 3 0 0 4 0 1


This document is property of Enel Green Power SpA. It is strictly forbidden to reproduce this document, in whole or in part, and to provide to others any related information without the previous written consent by Enel Green Power SpA.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
"LA LOMA - ENEL" 187,36 MWp - Panels 460 Wp
PANELS STRINGS STRUCTURES CABIN STRING BOX
MWp
N 460 Wp (28 PANELS) 2X42 INVERTER (12/21 IN)
721
187,36 407.316 14.547 4.849 22 66 with 12 IN
655 with 21 IN

A W E A
DESCRIPTION Q.TY
S SOLAR AREA 373,32 Ha

FENCING 7.950 m.
9.373 Ha
B ENTRANCE GATE FIELD 2 B

AREA MODULOS 282,05 Ha


PT: 1+039.60 CABIN INVERTER 22
CP01.16 INTERNAL ROADS PV FIELD (3m) 7.985 m.
CP01.15
1+060 1+040 ACCESS ROADS PV FIELD (6m) 125 m.

0+020
C PC: 1+025.80 C
PITCHS 12,31 m.
CP01.14

2
R1

1+0
PT: 0+010.21

CP06.2
, 25

20
2

R5

R5
PC: 0+000
D D

0+000
CP01.18
CP01.17

CP06.1
1+360 1+340 1+320 1+300 1+280 1+260

1+0
00

E 0+9 E
80

F DETALLE 2
F
Escala 1:350
0+9
60

PT: 0+946.44
G G
CP01.13
R1 2 CP01.12
0+940

CP01.11
PC: 0+940.34

H H

CP01.19
PC: 0+000

CP02.1
0+920

0+000
CP01.20
DETALLE 1
Escala 1:350 1+620 1+600 1+580 1+560 1+540 1+520
L L

R5
5
CP02.2
0+060

R
PT: 0+010.21

0+020
M M
0+040

0+040
N DETALLE 3 N
Escala 1:350
DENOMINACIÓN CAMINOS
0+020

ACC.X
NÚMERO

PT: 0+010.21
CP05.2

ACCESO
P R5 C.P.X. P
R5

0+500

NÚMERO
PARQUE
CAMINO
.1 PC: 0+000
5
0+000

CP01.22 0
CP CP 01.21
1+760 1+740 1+720 1+700 1+680 NOTAS:
0+480

· Todas las unidades están en el SI de medidas.


Q · Sistema de coordenadas: WGS84 UTM 18N Q
· Ancho de caminos internos 3m
· Ancho de caminos de acceso 6m
· Radio mínimo de giro: 5m caminos internos, 15m caminos de acceso.

REFERENCIAS:
CP01.10
0+460

· GRE.EEC.D.99.CO.P.10036.03.003.00 - General Layout of PV Field


R

PT: 0+457.12 · GRE.EEC.D.99.CO.P.10036.03.004.00 - Internal roads general Layout with coordinates


PT: 0+203.40 · GRE.EEC.C.99.CO.P.10036.00.109.00 - Calculation notes and TTSS internal roads
R · GRE.EEC.D.99.CO.P.10036.03.014.00 - Layout Plan of Drainage system & Details of all R
CP01.9 CP01.7 the interferences (roads, water course, cabins,etc)
CP01.8 0+ CP01.6
0+440 0+420 0+400 0+380 0+360 0+340 0+320 0+300 0+280 0+260 0+240 0+220 20
0
PC: 0+446.91

PC: 0+193.18 01 16.02.2021 ISSUED (RELEASE 0.3) K. MERCADO F. MERINO A. IAMUNDO

R5 CP01.5 00 03.02.2021 ISSUED (RELEASE 0.1) K. MERCADO F. MERINO A. IAMUNDO

REV. DATE DESCRIPTION PREPARED CHECKED APPROVED


CONTRACTOR'S LOGO PROJECT:
PV PLANT "LA LOMA-ENEL" (COLOMBIA)

0+180
S S
LATAM FILE NAME:

22
20C025-2C014 GRE.EEC.D.99.CO.P.10036.03.004.00.dwg
CLASSIFICATION: FORMAT: SCALE: PLOT SCALE: SHEET:

FOR VALIDATION A0 S/E 1:1 2 di / of 5


UTILIZATION SCOPE: TITLE:

0+160
PV "LA LOMA"
ISSUED FOR CONSTRUCTION Internal roads - General layout
T DETALLE 4 GRE VALIDATION (with coordinates) T
DETALLE 5
Escala 1:350 Escala 1:500 VALIDATED BY A. GOMEZ
GRE CODE
VERIFIED BY A. MEDINA GROUP FUNCTION TYPE ISSUER COUNTRY TEC. PLANT SYSTEM PROGRESSIVE REVISION

COLLABORATORS F. NOPE GRE EEC D 9 9 C OP 1 0 0 3 6 0 3 0 0 4 0 1


This document is property of Enel Green Power SpA. It is strictly forbidden to reproduce this document, in whole or in part, and to provide to others any related information without the previous written consent by Enel Green Power SpA.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
"LA LOMA - ENEL" 187,36 MWp - Panels 460 Wp
PANELS STRINGS STRUCTURES CABIN STRING BOX
MWp
460 Wp (28 PANELS) 2X42 INVERTER (12/21 IN)
721
187,36 407.316 14.547 4.849 22 66 with 12 IN
655 with 21 IN

A N A
DESCRIPTION Q.TY
W E

R5
SOLAR AREA 373,32 Ha

S FENCING 7.950 m.

,52
9.373 Ha
B ENTRANCE GATE FIELD 2 B

AREA MODULOS 282,05 Ha


CABIN INVERTER 22

CP06.4
CP06.3
INTERNAL ROADS PV FIELD (3m) 7.985 m.
ACCESS ROADS PV FIELD (6m) 125 m.
C PITCHS 12,31 m. C

PC: 2+404.45
0+
CP01.28 18
D
CP01.27
2+400 2+380 2+360 0+183 0 D
PT: 2+414.66

R
CP01.29

5
2+420

,15
E 3 3 E

R7
2+440

0+160
F F

2+460

G G

DETALLE 6 DETALLE 8
Escala 1:350 Escala 1:350

H H

L L

3+520
0+060

M M
3

R7
0+040

,1
N
5 3
DENOMINACIÓN CAMINOS
N

ACC.X
17 NÚMERO

3+540
0+020

CP01.30
ACCESO
C.P.X.
P NÚMERO
P
PT: 0+010.21 PARQUE
CP04.2

R CAMINO
5
R5

PC: 0+000
CP03.1

NOTAS:

PC: 0+000
CP01.31 · Todas las unidades están en el SI de medidas.
0+000

0+000

· Sistema de coordenadas: WGS84 UTM 18N


CP01.26 CP01.24 · Ancho de caminos internos 3m
Q CP01.25 CP01.23 Q
CP04.1

· Ancho de caminos de acceso 6m


2+140 2+120 2+100 2+080 2+060 2+040 2+020 2+000 1+980
3+551 · Radio mínimo de giro: 5m caminos internos, 15m caminos de acceso.

R5
R
CP03.2

REFERENCIAS:
5

· GRE.EEC.D.99.CO.P.10036.03.003.00 - General Layout of PV Field


PT: 0+010.21 · GRE.EEC.D.99.CO.P.10036.03.004.00 - Internal roads general Layout with coordinates
· GRE.EEC.C.99.CO.P.10036.00.109.00 - Calculation notes and TTSS internal roads
· GRE.EEC.D.99.CO.P.10036.03.014.00 - Layout Plan of Drainage system & Details of all
the interferences (roads, water course, cabins,etc)
0+020

R R

R5,52
01 16.02.2021 ISSUED (RELEASE 0.3) K. MERCADO F. MERINO A. IAMUNDO

00 03.02.2021 ISSUED (RELEASE 0.1) K. MERCADO F. MERINO A. IAMUNDO

3 REV. DATE
CONTRACTOR'S LOGO
DESCRIPTION PREPARED CHECKED APPROVED

PROJECT:
PV PLANT "LA LOMA-ENEL" (COLOMBIA)

S S
LATAM
0+040

FILE NAME:
20C025-2C014 GRE.EEC.D.99.CO.P.10036.03.004.00.dwg
CLASSIFICATION: FORMAT: SCALE: PLOT SCALE: SHEET:

FOR VALIDATION A0 S/E 1:1 3 di / of 5


UTILIZATION SCOPE: TITLE:

PV "LA LOMA"
ISSUED FOR CONSTRUCTION Internal roads - General layout
T GRE VALIDATION (with coordinates) T
DETALLE 7 DETALLE 9
VALIDATED BY A. GOMEZ
Escala 1:350 Escala 1:150 GRE CODE
VERIFIED BY A. MEDINA GROUP FUNCTION TYPE ISSUER COUNTRY TEC. PLANT SYSTEM PROGRESSIVE REVISION

COLLABORATORS F. NOPE GRE EEC D 9 9 C OP 1 0 0 3 6 0 3 0 0 4 0 1


This document is property of Enel Green Power SpA. It is strictly forbidden to reproduce this document, in whole or in part, and to provide to others any related information without the previous written consent by Enel Green Power SpA.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
"LA LOMA - ENEL" 187,36 MWp - Panels 460 Wp
PANELS STRINGS STRUCTURES CABIN STRING BOX
MWp
460 Wp (28 PANELS) 2X42 INVERTER (12/21 IN)
721
187,36 407.316 14.547 4.849 22 66 with 12 IN
655 with 21 IN

A A
Q.TY

R5,52
DESCRIPTION
SOLAR AREA 373,32 Ha

FENCING 7.950 m.

18 20 9.373 Ha

1+120
1+120
B ENTRANCE GATE FIELD 2 B

R7 AREA MODULOS

CABIN INVERTER
282,05 Ha
22

,1 ,1 5 INTERNAL ROADS PV FIELD (3m) 7.985 m.

C 5 3 3 R 7 ACCESS ROADS PV FIELD (6m)

PITCHS
125 m.
12,31 m. C

0+000
CP07.1
D CP07.2 D

1+142 1+140
CP03.4 CP02.3
CP03.3 CP02.4
E
1+140 1+144
,1 5 E

R 7
3
F F

0+020
R5,52

R5,52
01
G G

DETALLE 10 DETALLE 11 DETALLE 12


Escala 1:150 Escala 1:150 Escala 1:150
H H

W E
L L

R5
R5

,52
,52

M M

CP04.4
CP04.3
N N
1+447

0+180
DENOMINACIÓN CAMINOS
CP07.12
CP07.11 ACC.X
1+440

NÚMERO

0+184 ACCESO

P C.P.X. P
NÚMERO
PARQUE
CAMINO

1 5 3
15 NOTAS:

7 , 7, 3 ·
·
·
·
Todas las unidades están en el SI de medidas.
Sistema de coordenadas: WGS84 UTM 18N
Ancho de caminos internos 3m
Ancho de caminos de acceso 6m
Q

R
· Radio mínimo de giro: 5m caminos internos, 15m caminos de acceso.

R REFERENCIAS:

· GRE.EEC.D.99.CO.P.10036.03.003.00 - General Layout of PV Field


· GRE.EEC.D.99.CO.P.10036.03.004.00 - Internal roads general Layout with coordinates

0+160
· GRE.EEC.C.99.CO.P.10036.00.109.00 - Calculation notes and TTSS internal roads
· GRE.EEC.D.99.CO.P.10036.03.014.00 - Layout Plan of Drainage system & Details of all
R the interferences (roads, water course, cabins,etc) R
02
1+420

01 16.02.2021 ISSUED (RELEASE 0.3) K. MERCADO F. MERINO A. IAMUNDO

00 03.02.2021 ISSUED (RELEASE 0.1) K. MERCADO F. MERINO A. IAMUNDO

REV. DATE DESCRIPTION PREPARED CHECKED APPROVED


CONTRACTOR'S LOGO PROJECT:
PV PLANT "LA LOMA-ENEL" (COLOMBIA)

S S
LATAM FILE NAME:
20C025-2C014 GRE.EEC.D.99.CO.P.10036.03.004.00.dwg
CLASSIFICATION: FORMAT: SCALE: PLOT SCALE: SHEET:

FOR VALIDATION A0 S/E 1:1 4 di / of 5


DETALLE 13 DETALLE 14
Escala 1:150 Escala 1:150 UTILIZATION SCOPE: TITLE:

PV "LA LOMA"
ISSUED FOR CONSTRUCTION Internal roads - General layout
T GRE VALIDATION (with coordinates) T
VALIDATED BY A. GOMEZ
GRE CODE
VERIFIED BY A. MEDINA GROUP FUNCTION TYPE ISSUER COUNTRY TEC. PLANT SYSTEM PROGRESSIVE REVISION

COLLABORATORS F. NOPE GRE EEC D 9 9 C OP 1 0 0 3 6 0 3 0 0 4 0 1


This document is property of Enel Green Power SpA. It is strictly forbidden to reproduce this document, in whole or in part, and to provide to others any related information without the previous written consent by Enel Green Power SpA.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
"LA LOMA - ENEL" 187,36 MWp - Panels 460 Wp
PANELS STRINGS STRUCTURES CABIN STRING BOX
MWp
460 Wp (28 PANELS) 2X42 INVERTER (12/21 IN)
N 721
187,36 407.316 14.547 4.849 22 66 with 12 IN
655 with 21 IN

A A
W E DESCRIPTION Q.TY
SOLAR AREA 373,32 Ha
S
FENCING 7.950 m.
9.373 Ha
B ENTRANCE GATE FIELD 2 B

AREA MODULOS 282,05 Ha

0+520
0+940
CABIN INVERTER 22
INTERNAL ROADS PV FIELD (3m) 7.985 m.
3
ACCESS ROADS PV FIELD (6m) 125 m.
C PITCHS 12,31 m. C

CP07.3

R5
PC: 0+540.87

0+540
PC: 0+000

CP05.4
0+920
0+560 0+580 0+600 0+620 0+660

0+333
3 CP07.4 CP07.6 0+640

3
D CP07.5 CP07.7 D
PT: 0+551.09
R5

CP07.10
R5

R5

CP05.3
0+320
PT: 0+902.23 PT: 0+010.21

00
0+9
0+860 0+880
E CP07.8 E
CP07.9
PC: 0+892.02
3

0+300
F F

DETALLE 15 DETALLE 16
Escala 1:350 Escala 1:300

G G

0+040
ALMACEN

CP01.4
H H
ACC01.4
0+060

SUBESTACION
ELEVADORA
3 , 7
R 1
RESIDUOS NO
PELIGROSOS

L L
6
AREA DE

R10
ESTACIONAMIENTO
0+040

OFICINAS
PELIGROSOS
RESIDUOS
AREA DE

CP01.4

.3
M ,7 ACC01.3 M

0+
3

CP01
PT: 0+029.66
R1

3
02
R10

CP

0
.3

ACC01.3
01
0+
CP01
02

7
CP
.2
0

5.8
N 0 N

R15
1.
.87

2
R15
15

01
DENOMINACIÓN CAMINOS
+0
:0

0+
0+
PC

00 CP01.1 ACC.X

5
0 NÚMERO

0+

R
PC
00 CP01.1

7,
ACCESO

79
P
PARKING ACC01.2
0 C.P.X.
NÚMERO
P

PARQUE
CAMINO

5
R
ZONA DE DESCARGA NOTAS:

· Todas las unidades están en el SI de medidas.


Q · Sistema de coordenadas: WGS84 UTM 18N Q
· Ancho de caminos internos 3m
· Ancho de caminos de acceso 6m
DETALLE 18
ACC01.2 · Radio mínimo de giro: 5m caminos internos, 15m caminos de acceso.

REFERENCIAS:

6
· GRE.EEC.D.99.CO.P.10036.03.003.00 - General Layout of PV Field
ACC01.1 · GRE.EEC.D.99.CO.P.10036.03.004.00 - Internal roads general Layout with coordinates
· GRE.EEC.C.99.CO.P.10036.00.109.00 - Calculation notes and TTSS internal roads
R DETALLE 18 · GRE.EEC.D.99.CO.P.10036.03.014.00 - Layout Plan of Drainage system & Details of all R
Escala 1:150
Acceso 1 Km2+201 the interferences (roads, water course, cabins,etc)

01 16.02.2021 ISSUED (RELEASE 0.3) K. MERCADO F. MERINO A. IAMUNDO

00 03.02.2021 ISSUED (RELEASE 0.1) K. MERCADO F. MERINO A. IAMUNDO

REV. DATE DESCRIPTION PREPARED CHECKED APPROVED


CONTRACTOR'S LOGO PROJECT:
PV PLANT "LA LOMA-ENEL" (COLOMBIA)

S S
DETALLE 17 LATAM FILE NAME:

Escala 1:350 20C025-2C014 GRE.EEC.D.99.CO.P.10036.03.004.00.dwg


CLASSIFICATION: FORMAT: SCALE: PLOT SCALE: SHEET:

FOR VALIDATION A0 S/E 1:1 5 di / of 5


UTILIZATION SCOPE: TITLE:

PV "LA LOMA"
ISSUED FOR CONSTRUCTION Internal roads - General layout
T GRE VALIDATION (with coordinates) T
VALIDATED BY A. GOMEZ
GRE CODE
VERIFIED BY A. MEDINA GROUP FUNCTION TYPE ISSUER COUNTRY TEC. PLANT SYSTEM PROGRESSIVE REVISION

COLLABORATORS F. NOPE GRE EEC D 9 9 C OP 1 0 0 3 6 0 3 0 0 4 0 1