69
3 5
GRID WIDTH 4 4
GRID LENGTH M 4.4 4.4
ROOF SLAB THK M 0.2 0.2
FLOOR SLAB THK M 0.2 0.2
ROAD LEVEL 213.74 213.46
STRUCTURAL TOP LEVEL 214.74 214.46
GROUND LEVEL 213.5 212.77
FREE BOARD M 0.5 0.5
TWL 214.04 213.76
WATER DEPTH M 3.5 3.5
LWL 210.54 210.26
DEPTH OF SUMP BELOW LWL M 1 1
PCC THK M 0.1 0.1
BOTTOM OF PCC 210.24 209.96
CRITICAL DEPTH OF WATER TABLE BELOW GL M 6 1.9
WATER COLUMN FOR FLOATATION FOR TANK M -2.74 0.91
WATER COLUMN FOR FLOATATION FOR SUMP M -1.74 1.91
FORCE CALCULATION
FLOOR SLAB WEIGHT KN/M2 5 5
ROOF SLAB WEIGHT KN/M2 5 5
FLOATATION FORCE WITH FOS KN/M2 -32.88 10.92
BALANCE FORCE FOR FLOATATION KN/M2 0 0.92
NO OF COLUMNS IN SUMP 6
PILE GRID WIDTH M 2 4
PILE GRID LENGTH M 2.2 4.4
BALANCE FLOATATION FORCE PER PILE 0 1.6192
DIA OF PILE CHOSEN 0.25 0.2
LENGTH OF PILE 3.5 3.5
BULB 1 1
PILE UPLIFT RESISTANT CAPACITY 6 4
OK OK
NO OF PILES IN UGT 238 18
PUMP PIT
WIDTH M 5 5
LENGTH M 15 19.5
PROJECTION OF BASE SLAB INCLUDING WALL THK M 1.5 1.5
PILE GRID WIDTH M 2 2.5
PILE GRID LENGTH M 2.2 2
THK OF FLOOR SLAB M 0.3 0.35
FLOOR SLAB WEIGHT KN/M2 7.5 8.75
PIT PCC BOTTOM LEVEL 209.14 208.81
WATER COLUMN FOR FLOATATION M -1.64 2.06
FLOATATION FORCE WITH FOS KN/M2 -19.68 24.72
BALANCE FLOATATION FORCE PER PILE KN/M2 -27.18 15.97
BALANCE FLOATATION FORCE PER PILE TON -11.9592 7.985
DIA OF PILE CHOSEN M 0.3 0.3
BULB 2 1
LENGTH OF PILE M 3.5 3.5
PILE UPLIFT RESISTANT CAPACITY TON 12 8
OK OK
NO OF PILES IN PIT AND SUMP 40 15
278 33
1.3
4
4.4
0.2
0.2
213.7
214.7
212.4
0.5
214
3.5
210.5
1
0.1
210.2
1.9 2.81
0.3 0.91
1.3
5
5
3.6
0
5
4
4.4
0
0.2
3.5
1
4
OK
0
5
9.5
1.5
2
2
0.35
8.75
209.05
1.45
17.4
8.65
3.46
0.2
1
3.5
4
OK
11
11
1 2
20 0.2 4 6
25 0.25 6 9
30 0.3 8 12
37.5 0.375 12 18
40 0.4 14 21
45 0.45 17.5 25.75
50 0.5 21 31.5
CONSTRUCTION OF UNDER GROUND TANKS & PUMPING STATION ON DESIGN BUILD BASIS
IN SECTOR 3,5 & 7
JHAHHAR, HARIYANA
S.NO. PERTICULAR SEC-3 SEC-5 SEC-7
1 @2.0M 9.2 6.1 7.7
SBC (T/M2) @2.5M 10.4 7.3 9.1
@3.0M 8.4 10.5
2 AVG NGL 213.189 212.733 212.362
3 DEPTH OF WATER TABLE BELOW NGL (M) 3.5 2.2 2.5
4 CORRECTION FACTOR FOR WATER TABLE (M) 0.5 0.5 0.5
5 LEVEL OF WATER TABLE 210.189 211.033 210.362
6 ROAD LEVEL 213.740 213.462 213.706
7 LEVEL OF TOP OF STRUCTURE PROPOSED 215.000 214.500 215.000
8 HEIGHT OF TOP OF STRUCTURE ABOVE ROAD (M) 1.26 1.038 1.294
9 TOP WATER LEVEL 214.325 213.825 214.325
10 WATER DEPTH IN TANK (M) 3.5 3.5 3.5
11 FREE BOARD (M) 0.5 0.5 0.5
12 THK OF ROOF SLAB (M) 0.175 0.175 0.175
13 FLOOR LEVEL OF TANK 210.825 210.325 210.825
14 THK OF FLOOR SLAB 9M) 0.2 0.2 0.2
R.L. OF WATER COLUMN TO BE CONSIDERED
15 AGAINST FLOATAION (M) NA 0.908 NA
16 DEPTH OF SUMP (M) 1.00 1.00 1.00
CAPACITY CALCULATIONS FOR UGT's AT JHAJJAR,HARIYANA
SECTOR 3 5 7
NET CAPACITY OF UGT KL 2550 1885 875
COMPARTMENT 1 CAPACITY KL 200 375 200
COMPARTMENT 2 CAPACITY KL 2350 1510 675
849
1-14189920892 460
Data for Pump Discharge
Q1 Q2
W1 (Nos.) S1 (Nos.) F1 (Nos.) W2 (Nos.) S2 (Nos.)
S.No. Sector (cum/hr) (cum/hr)
1 Sector-3 179 1 1 1 350 0 0
2 Sector-5 214 1 1 1 500 1 1
3 Sector-7 164 1 1 1 0 0 0
Select
Calculations for Sluice gates for UGT at Jhajjar, Hariyana
3
For UGT at Sector-7
Tank ( Compartment 2 ) is under maintenance and full discharge if coming from Fire
Case -1 reserve (Compartment 1) to Sump.
Case -2 Full discharge is coming from Tank (Compartment 2 ) to Sump
Full discharge for considering the future pump configuration 328 Cum/hr.
allowable velocity if sluice gates 0.9 M/sec
Area of sluice gates required 0.101 Sqm
Size of Squire Sluice gate Proposed 400 MM
Provide Two Squire sluice gates of size 400 x 400 mm at Fire reserve and Tank outlet for both
of the cases
Q3 Total Max Q
F2 (Nos.) W3 (Nos.) S3 (Nos.) F3 (Nos.)
(cum/hr) Nos. (cum/hr)
2 0 0 0 0 5 708
0 150 0 0 2 7 1078
0 0 0 0 0 3 328