Professional Documents
Culture Documents
Ir Form
Ir Form
A.A RANO NIGERIA LIMITED WIZCHINO ENGINEERING LIMITED CRUSTEAM NIGERIA LIMITED
2.
3.
4.
5.
6.
Inspection carried out by(for Consultant:
S/N Name Position Date /Time Comments
1.
2.
3.
4.
5.
6.
Received by contractor (Please sign below, Retain Original and Return Copy)
Name: Position: Signature/Date: