You are on page 1of 2
anda asia wrorrfarttracer “ype 008 2640 agontaeraterarmhiaraa, ETT “Gee ove. 246389 NATIONAL HIGHWAYS AUTHORITY OF INDIA twa pnsssipntynaticom SIUM, pla a Chakaar 0, Naga ear Bulb Die Man, Pin’ Hiab Pres NHAUPD/PIU-MandiN-PIUSIB 1393 | JA Feb, 2019 To Sub: So her a argh 27 aT sir, 1 Executive Engin IPH Mandi Division Distt Mandi (HP) r TPF-GE-SCIA ican Refer your Assistant Engineer, IPH Sub Division No.| office letter no. fo ‘ga_aves ot WEE /ic /2018 2o26—s1 feats 8 weal 2018, 2 ‘The case’ has been examined and permission granted with following ‘conditions: (8) The excavation of trench for laying of pipeline shall be done with manual ‘means and machinery such as Backhoe Excavator (or similar) shall not be Used for the purpose to minimize the damage tothe road, {(b) The Excavation work shall not be undertaken in a length more than 200, irs at a streteh to aveld inconvenience to the road users and to minimize traffic hazards (©) The excavation taken up in such length of 200 mirs shall be filed back Immediately after laying the pipe and compacted propery with appropriate ‘means and should not be left open for more than a day to avoid traffic. hazards, Next stretch shall be taken In hand only after completion of first stretch, (@) At Bridge and cuter locations, the pipeline shall be routed outside the RalingiParapet by providing suitable arrangement and it must be ensured that no damage Is caused to the Structure. it must also be ensured that the waterway of the Bridge/Culvert Is not obstructed by laying of the Bipeline (e)It must be ensured that the stacking of excavated material is done propery, and na hindrance is caused tothe regular flow of trafic () All safety maasures must be taken ie. Waming signs, Traffic Cones, Reflective Warning Tapes and Men at Work signs etc. shail be installed. (g) lt must be ensured that the pipeline js laid along the shoulders and no ‘damage is dons to roadside drains, FiWalls, Balls and the pavement. In case of any danage, the same shall be restored by the Executing Agency at thei cost fo he satisfaction of Authorty Engineer. (n) At Road crossings, the supply pipe shall have no joints below the pavement and it should be encased in an outer pipe of appropriate diameter to avold excavating the tarred road for repairs in future 1 Me Henil OMce! GUSWEL Sectar-10, Dears, Ne Welk — 110075, wurrarafaa: oi-s y2 6, Heet—t0 FTE anda wsia worrrturttreor eT 01005 200489, usoufteeratermrtsara, aaa “fret ~o100e 246805, NATIONAL HIGHWAYS AUTHORITY OF INDIA mi: pnautyngiatcon Gort ofa) senator 0 Before commencement of excavation, the center line of the proposed trench shall be marked slong the road and got approved fiom the Authority Engineer to minimize the damage to the road crus, 0 At locations where road crossing is proposed, the pavement shall be repaired by the Executing Agency as per the existing specifications to the Satisfaction of the Authority Engineer (The date and heurs of working at respective locations willbe intimated before execution of work ()) In case of any violation of any of the above canxitions, this permission shall become nulland void automatically. (This permission shall become operative only after an undertaking by the Executive Engineer, IPH Division Mandi, giving his consent to above conditions, (n) Also ensure to provide the contact detais of Nodal officer before ‘execution of work or futher co-ordination inthis regard. 3. The Contact detail of authorized representatives of Authority Engineer Mis, TPF Getinsa Euroestusios SL. is as below: Name | Contact No] ‘Sh. Vijay Kumar Kapoor, RE 34184-70601 | 4. This office vide letter no. NHAUPDIPIU-MandIN-P/USI81/2550 dated 24 Jan 2018 has already granted the permission for laying of underground pipeline on CMM. Toad NH-21 at km 200+370 and km 201+672 under Augmentation of WSS Mandi town from Uhi River to Mandl including crossing of underground pipes near Bradhivit on NH-21, Ithas been observed that after the execution of work, proper repair work has not been by your department which is dangerous for the road users. You ate Fequested to take necessary action on the previous execution of work done by your department. 5. Thisis for your further necessary action please. Designation” [For Acton] Yours truly, copy to Whe 0 Super Pr ifna Sat itr {h Asvltatengtnees PH Sa Deen Ne | Dat Mana GLP) iy SieRajah Kumar Bat Toa Cede TE Gems Ecoosados werrerafaa: os ga 6, dyex—to ere, ag Peeeh—110075 Head Office: 6-586, Seetor-10. Dwarka, New Delhi - 110078

You might also like