Professional Documents
Culture Documents
Bridge 2000
Bridge 2000
Vy_when_
Mz_Min
Mz_Min
JOINT DISPLACEMENTS
Load Case Joint DispX DispY RotZ
DL S102 0.0000 -0.0015 -0.0001
DL S106 0.0000 -0.0006 0.0001
DL S202 0.0000 -0.0028 -0.0002
DL S206 0.0000 -0.0043 0.0001
MEMBER FORCES
Load Case Member Joint Px Vy Mz
DL SM102 S101 0.0 4.1 40.9
DL SM103 S103 0.0 4.1 122.8
DL SM106 S105 0.0 -10.9 54.7
DL SM107 S107 0.0 -10.9 -163.4
REACTION FORCES
Load Case Joint Px Vy Mz
DL C200 1.2 25.9 -16
DL C300 -1.2 25.9 16
DL S100 0.0 4.1 0
DL S400 0.0 4.1 0
TRUCK/LANE COMBINATIONS
Include in
Y Y
LLMAX
Basic Trucks HS20T HS20L
LaneLoad 0.8
HS20Truck 1.25
Rider 1.25
HL93Truck
Testing Frame Spreadsheet Three Span Bridge 12:10:05 03/23/2020
request
request
request
request
Load Combination Load Load Combination Live Load Force Associated Forces to display Member Joint Joint X Y Support
Envelopes Request
HS20T DL Comb1 Px Vy Mz DispX DispY RotZ SM101 S100 S100 0.000 0.000 1
HS20L SELF-WT Px SM101 S101 S101 10.000 0.000 0
LLMAX SIDL Vy y y SM102 S101 S102 20.000 0.000 0
Max/Min
Forces
Mz y y SM102 S102 S103 30.000 0.000 0
DispX SM103 S102 S104 40.000 0.000 0
DispY SM103 S103 S105 50.000 0.000 0
RotZ SM104 S103 S106 60.000 0.000 0
SM104 S104 S107 70.000 0.000 0
SM105 S104 S200 80.000 0.000 0
SM105 S105 S201 91.000 0.000 0
SM106 S105 S202 102.000 0.000 0
SM106 S106 S203 113.000 0.000 0
SM107 S106 S204 124.333 0.000 0
SM107 S107 S205 135.667 0.000 0
SM108 S107 S206 147.000 0.000 0
SM108 S200 S207 158.000 0.000 0
SM201 S200 S208 169.000 0.000 0
SM201 S201 S300 180.000 0.000 0
SM202 S201 S301 190.000 0.000 0
SM202 S202 S302 200.000 0.000 0
SM203 S202 S303 210.000 0.000 0
SM203 S203 S304 220.000 0.000 0
SM204 S203 S305 230.000 0.000 0
SM204 S204 S306 240.000 0.000 0
SM205 S204 S307 250.000 0.000 0
SM205 S205 S400 260.000 0.000 1
SM206 S205 C200 80.000 -40.000 1
SM206 S206 C201 80.000 -30.000 0
SM207 S206 C202 80.000 -20.000 0
SM207 S207 C203 80.000 -10.000 0
SM208 S207 C300 180.000 -40.000 1
SM208 S208 C301 180.000 -30.000 0
SM209 S208 C302 180.000 -20.000 0
SM209 S300 C303 180.000 -10.000 0
SM301 S300
SM301 S301
SM302 S301
SM302 S302
SM303 S302
SM303 S303
SM304 S303
SM304 S304
SM305 S304
SM305 S305
SM306 S305
SM306 S306
SM307 S306
SM307 S307
SM308 S307
SM308 S400
CM201 C200
CM201 C201
CM202 C201
CM202 C202
CM203 C202
CM203 C203
CM204 C203
CM204 S200
CM301 C300
CM301 C301
CM302 C301
CM302 C302
CM303 C302
CM303 C303
CM304 C303
CM304 S300
BASIC TRUCKS
1000
500
Kip-Ft
HS25_STD
0 HS25_STD
0 50 100 150 200 250
-500
-1000
-1500
Length along the bridge in Feet
HS25_STD Max
HS25_STD Min
250
Testing Frame Spreadsheet Three Span Bridge 12:10:05 03/23/2020
10.000
8.000
Kip-Ft
6.000
4.000
2.000
0.000
0 10 20 30 40 50 60 70 80
Length along the bridge in Feet
DL Dead Load
SIDL Superimposed
STATIC LOADS
Load Case Span/ Span/Col. Force/ Force Val 1 Val 2
Name Column No. Moment Type Kip, ft Kip, ft
DL Span 1 Force Y Uniform Full -1
✘ Selfweight Loading
Material Density,
Kip/ft^3
Beams 0.16
Columns 0.15
L1 L2
ft ft
Model Geometry
Project: Test
Problem Title: Three Span Bridge
Description: Static and Live Load Analysis
Engineer: YP
SUPERSTRUCTURE DESCRIPTION
Parameters Units SPAN 1 SPAN 2 SPAN 3
Length ft 80 100 80
Moment Inertia ft^4 50 50 50
Section Area ft^2 20 20 20
No. Hinges 0 0 0
Hinge 1 Location ft 5 0 0
Hinge 2 Location ft
Number of Sections in Span 8 8 8
SUBSTRUCTURE DESCRIPTION
Parameters Units PIER 1 PIER 2 PIER 3 PIER 4
Support Type Roller Column Column Roller
Column Support Springs Fixed Fixed Fixed
Column Top Release Fixed Fixed Fixed Hinge
Vertical Spring kip/ft 1000 210 210 210
Horizontal Spring kip/ft 10000 100 100 100
Rotational Spring kip*ft/rad 10 100 100 100
Cross Coupling Term kip 52 100 100 100
Support Width Left ft 0 0 0 0
Support Width Right ft 0 0 0 0
Column Length ft 15 40 40 40
Footing Height ft 0 0 0 0
Column Offset at Top ft 0 0 0 0
Moment Inertia ft^4 0.667 12.56 12.56 12.56
Area ft^2 2 12.56 12.56 12.56
o top of Column.
Y
oint) X
int '0') C200
SPAN SECTIONS
Span Local Coordinates
34/35
35/36
36/37
37/38
38/39
39/40
40/41
41/42
42/43
43/44
44/45
45/46
46/47
47/48
48/49
49/50
50/51
51/52
52/53
53/54
54/55
55/56
56/57
57/58
58/59
59/60
60/61
61/62
62/63
63/64
64/65
65/66
66/67
67/68
68/69
69/70
70/71
71/72
72/73
73/74
74/75
75/76
76/77
77/78
78/79
79/80
80/81
81/82
82/83
83/84
84/85
85/86
86/87
87/88
88/89
89/90
90/91
91/92
92/93
93/94
94/95
95/96
96/97
97/98
98/99
99/100
…………………………………………
es
S200
Y
al
S100 X
f span
span
SPAN 3, L = 80 ft
Y A I
ft ft^2 ft^4
0 20 50
0 20 50
0 20 50
0 20 50
0 20 50
0 20 50
0 20 50
0 20 50
0