PROJECT AUGUMENTATION OF POH CAPACITY FROM 400 TO 500 WAGONS PER MONTH At Wagon Repair Shop, Raipur
2 EARTHWORK
2.1 EXCAVATION Physical Dimension & Level 100% Project Specification
2.2 BACKFILLING Material Test - Soil As per Project Specifications Project Specification
(1) Gradation Analysis 1 set for existing embankment
(2) Atterberg’s limits - liquid limit & plastic limit 1 set per source of borrow material
(3) Optimum Moisture Content (OMC), Maximum Dry
Density (MDD)
(2) All Physical & Chemical test 3rd Party Lab once in 3 months Project Specification
(3) Physical Tests at site lab for each batch received at site
A) Consistency
B) Initial & Final Setting time IS:12330/8112/12269/455/1489
C) Soundness
D) Fineness
E) Compressive Strength
(4) Storage once monthly age not more than 3 months
2.2 COARSE AGGREGATE Material - (2) Coarse Aggregate
(1) Sieve Analysis For Each Vehicle IS-383
(2) Flakiness & Elongation Monthly
(3) Specific Gravity Monthly
(4) Bulk Density Seasonal/Monthly
(5) Impact Value Monthly
2.3 FINE AGGREGATE Material - (3) Fine Aggregate IS 383
(1) Sieve Analysis For Each Vehicle
(2) Silt Content For Each Vehicle
2.4 WATER Material - (4) Water From the Source at the Begining of As Per IS: 456 & IS :3025
Work /Change of Source
Physical & Chemical test
4.2 BALLAST Material Test - Aggregate 1 sample per 100 cum stack/wagon
(1) Gradation Analysis 1 sample per 2000 cum Gradation Limits in spec
(2) Abrasion Value --do-- max 30%
(3) Aggregate Impact Value --do-- max 20%
(4) Water Absorption max 1%
5 BLOCKWORK
5.1 Material Check Material (Block)
Dimensions,Compressive strength, Density & Drying Maximum variation length +/- 5mm,
Per lot / Batch
Shrinkage width and height +/- 3mm,
Density 551 to 650 Kg/m3 ,
Compressive strength 4n/mm2 and
Dimensions,Compressive strength, Density & Drying As per relevant IS Code/ one sample Thermal conductivity 0.24w/m.k
Shrinkage for 10000 nos .
Thermal Conductivity Once in starting of block work activity
Material (Mortar/Adhesive)
Compressive strength / Adhesion Per lot / Batch > 7.5 N/mm2
Cement Mortar 1set every day randomly
5.2 Process Check Ensure block work is done as per Technical
Specification
- Soaking
- Ratio of Mortar
-Architechtural layout drawing Everyday's activities Drawing
- Plumb check - Initial & Final
- Raking of joints/ Joint thickness
- Doors and Window openings
- Reduced levels of sill/Lintel/Bottom
6 PLASTER WORK
6.1 Material Check Cement Every batch As per Indian Standard
Sand sieve analysis Daily 1 set As per Indian Standard
Mortar 1 set every day randomly As per Indian Standard
Water Proof Chemical Every batch As per manufacturer Specification
6.2 Process Check Ensure Plastering is done as per Tech Specification
Ensure that the plastering of Block Work shall be of 'min
15mm thick for inside, min 6 mm for celling and min
20mm for waterproof external
- Type of Plaster
- Mix proportion
- Plumb marks / Correction of Masonry(if any)
- Plaster thickness
As Per IS :1661 / Method Statement /
- Chicken mesh fixing Every day
Technical Specification
- Base coat
- Doors & Windows opening check
- Joint cut at straight line
- Joint Finishing
Ensure that the curing of plastering surface are carried
100%
out for 7days
DOC. REF. No. FQP-CIVIL- RP-01
400 TO 500 WAGONS PER MONTH At Wagon Repair Shop, Raipur
REVISION / DATE Rev No. 01 / 23.12.2019
REFERENCE INSPECTION
RECORD
DOCUMENTS HYT IRCLASS COFMOW
Checklist P W R/W
Field Test Report
P W R/W
MTC Register R R R
P W R/W
Project Specification P W W
MTC IS 9103 R R R
Checklist P W R/W
Checklist P W R/W
P W R/W
MTC
IS 2185 Part 3-1985 , IS – 6441
(PART – I AND V)
P W R/W
P W R/W
Third Party Test Report
P W R/W
W R/W
MTC IS 2250 : 1981 P W R/W
Mortar cube Register IS 2250:1981 P W R/W
P W R/W
P W R/W
Technical Spec / As per Method
Check list P W R/W
Statement
P W R/W
P W R/W
P W R/W
P W R/W
Checklist P W R/W
P W R/W
P W R/W
P W R/W
Drawing / Technical Spec /
P W R/W
Method Statement
P W R/W
P W R/W
P W R/W
P W R/W
P W R/W