Task step Potential hazard H/ Assessment / Threat Hazard control (Barrier) Recovery Measure
S/E
1.0 1a. Obstruction to H/S -Unable to access during -Conduct pre-start talk prior start of -- Stop the work and report to
Mobilization of movement. emergency. work. CCB or walkie-talkie (provided
excavation -Place equipment and tools at by TBK)
equipment designated area. - Remove equipment from
-Ensure sufficient clearance to operate emergency access way.
firefighting facilities in case of any
emergency.
1b. Vehicle accident. H/S - Personal injury. - Ensure vehicle fitted with spark
- Spark from exhaust. arrestor. - Stop the work and report to
- Damage to equipment. - If spark arrestor cannot be fitted on CCB or walkie-talkie (provided
- Material falling over exhaust pipe, replace it with wire by TBK)
mesh and secure it. .
- Ensure vehicle and equipment are
certified with “Safe For Use” tag.
- Place vehicle at designated
location.
- Use Wheel Stoppers
- Adhere to refinery speed limit
25km/h
- Securing of tools/materials during
transportation
-Ensure that towing connection is
adequately secured with safety pin and
avoid making sharp turn
1c. H2S, flammable and toxic H/S -Gas poisoning - Stop the work and report to
EU4M Project 2017 3
Document no :
TBK-E4M-JHA-001
JOB HAZARD ANALYSIS Rev: 0
Page 4 of 7
gas. -Fire and explosion - To obtain approval PTW. CCB or walkie-talkie (provided
- Wear personal H2S detector by TBK)
(ratio 1:1 ) -Evacuate to safe area follow
-Crowcon at site. upwind direction
-Contractor to familiarize with escape - Contact Nearest First Aider
set location on site
- To request for AGT from Operation to
conduct gas test.
- Stop the work and report to
1d. Tripping hazard due to S/H -Slip and fall. CCB or walkie-talkie (provided
the tools and materials -Personal injury. -Store tools and equipment neatly and by TBK)
placed. away from access way. -Contact to nearest first aider
- Always have a place for on site
tools/materials and tools/materials in
their place
2.Manual 2a.Homemade tools S/H -Personal injury - Proper hand tools - Stop the work and report to
Excavation 2b.Not using hand gloves - Adequate and relevant PPE CCB or walkie-talkie (provided
(Spades, Shovels, especially hand gloves by TBK)
Hoe) -Be aware of your swing radius -Evacuate to safe area follow
upwind direction
2c. excavation area not S/H -Trip, slip and fall - Use signboard and barricade to - Contact Nearest First Aider
visible & lack of warn others on site
signboards, barricades - Full supervision
3.Hacking 3a.Dust H -Breathing problems - Spray water if necessary - Stop the work and report to
concrete using - Use proper PPE. (Ear plug, Face CCB or walkie-talkie (provided
beaker mounted Shield and Dust mask). by TBK)
backhoe - Ensure experienced operators are -Evacuate to safe area follow
3b.Loose concrete chipping
S/H - personal injury carrying out this work. upwind direction
hits worker in the eye - Contact Nearest First Aider
- Barricade the area. on site
3c.Uncontrolled movement S/H -personal injury/ equipment - Operator makes sure no
of machines damage obstruction within swing movement.
5.Disposal of soil 5a.Trucks fall into S/H -Personal injury -Signalman shall be used to guide - Stop the work and report to
and concrete excavated area and topple -Equipment damage trucks. CCB or walkie-talkie (provided
debris using Dump over -Personal injury -Reversed buzzer need to install on by TBK)
Truck 5b.Accident truck. -Evacuate to safe area follow
Ensure drivers are fit and qualified to upwind direction
operate vehicles and heavy - Contact Nearest First Aider
machineries. on site
- Traffic controllers are to be on duty
-Do not use Dump or soil trucks to
transport material.
5c. Soil / earth spillage S/E -Housekeeping -Ensure vehicles are not overfilled and
no spills occur
7.Backfilling by 5a.uncontrolled movement S/H -Personal injury -Keep a safe distance between man - Stop the work and report to
EU4M Project 2017 5
Document no :
TBK-E4M-JHA-001
JOB HAZARD ANALYSIS Rev: 0
Page 6 of 7
machine of machineries/ equipment -Equipment Damage and machine. CCB for emergency via CH 5
-Work area is barricaded and with -Evacuate to safe area follow
warning signboards upwind direction
-Traffic controller available and in - Contact Nearest First Aider
control of traffic. on site
- Ensure all vehicles lights and reverse
alarm are installed and switched on
8.Compaction 8a.High noise level H -personal injury -Ear plug/muff shall be used by - Stop the work and report to
compactor operator CCB via emergency via CH 5
-Evacuate to safe area follow
8b.Vibration H - Prolonged usage leading to - Rotation of workers(Rest time) upwind direction
Musculoskeletal disorders -Provide sufficient recuperating time - Contact Nearest First Aider
( MSDs on site
9. Demobilization 9a. Vehicle accident. H/S - Personal injury. - Pre-Start talk to be conducted prior - Stop the work and report to
of excavation - Spark from exhaust. to demobilization. CCB for emergency via CH 5
equipment - Damage to equipment. - Ensure vehicle fitted with spark -Contact to nearest first aider
- Material falling over arrestor. on site
- If spark arrestor cannot be fitted on
exhaust pipe, replace it with wire
mesh and secure it.
- Ensure vehicle and equipment are
certified with “Safe For Use” tag.
- Place vehicle at designated
location.
- Use Wheel Stoppers
- Adhere to refinery speed limit
25km/h
- Securing of tools/ materials during
transportation
Ensure that towing connection is
adequately secured with safety pin and
avoid making sharp turn
9b. Obstruction of access S - Unable to access during - To divert to alternate route
way. emergency - Mount and dismount vehicle using access way
proper access way - Remove the equipment
- Proper storage at laydown area from the emergency access
way
10. Housekeeping 10a. slippery ground. H/S -Slip and fall -Ensure work area is clean - Stop the work and report to
-Personal injury. -Conduct regular / daily housekeeping. CCB for emergency via CH 5
-Contact to nearest first aider
on site.