You are on page 1of 4

No.

COMPONENTS SUB- MATERIALS PROCESSE MATERIALS RISKS SAFTY


COMPONEN S PRECAUTIONS
TS
1. STEAM VALVE POLYPROPYLENE EXTRUSIO BLOW 1. ENSURE THE
LID N MOLDING 1. YOU RISK OPERATOR
BLOW MACHINE HAVING WEARS SUITABLE
MOLDING DERMATITIS INDUSTRAL
AND BEING GLOVES
BURNED BY
HIGH HEAT
CAPACITY AND
MOLTEN
PLASTIC
2. YOU RISK 2.ENSURE THE
BRING OPERATOR
POISONED BY WEARS A GAS
TOXIC FUMES MASK
3. YOU RISK 3.ENSURE THE
BEING INJURED OPERATOR IS
BY MOVING CLOTHED WITH
PARTS ADEQUATE
GUARDING
TO PREVENT THE
OPERATOR
COMING IN
CONTACT WITH
MOVING PARTS
4. YOUR RISK 4. ENSURE THE
BEING DEAF OPERATOR
WEARS HEARING
PROTECTION.
2 STEAM VALVE POLYPROPYLENE INJECTION INJECTION
HOLDER MOLDING MOLDING
MACHINE
3. VENTHOLE POLYPROPYLENE 1. INJECTI 1. INJECTIO
RING SEAL. AND RUBBER ON N MOLDING
MOLDING 2. VULCANI
2. VULCAN ZING
IZING MACHINE
4. BUTTON PVC INJECTION INJECTION
MOLDING MOLDING
MACHINE
5. OUT LID. POLYPROPYLENE
6. HANDLE TOP POYLPROPYLENE
LID.
7 HANDLE INNER POLYPROPYLENE
LID.
8. DEW POLYETHYLENE
COLLECTOR
9. DEW POLYETHYLENE
COLLECTOR
HOLDER
10. FUSE POLYETHYLENE
SUPPORTOR
11. UPPER RING POLYETHYLENE
SEAL
12. BUCKLE SHAFT STAINLESS STEEL 1. COLD CNC 1. YOU RISK 1. ENSURE THE
SPRING WINDING MACHINE BEING INJURED OPERATOR IS
2. HEATIN BY MOVING CLOTHED WITH
G PARTS ADEQUATE
3. GRINDI 2. YOU RISK GUARDING
NG BEING TO PREVENT THE
4. COATIO ELECTRICUTED OPERATOR
NG BY HIGH COMING IN
VOLTAGES CONTACT WITH
3. YOU RISK MOVING PARTS
GOING DEAF 2. ENSURE THE
OPERATOR
WEARS HEARING
PROTECTION.
13. CATCH POLYETHYLENE INJECTION INJECTION 1. YOU RISK
BUTTON MOLDING MOLDING HAVING
SEAT. MACHINE DERMATITIS
AND BEING
BURNED BY
HIGH HEAT
CAPACITY AND
MOLTEN
PLASTIC
14. FEET RUBBER VULCANIZI VALCANIZIN
NG G MACHINE
15.
16. UPPER ALUMINIUM MOLDING MOLDING
ALUMINIUM MACHINE
SEAL
17. GROUNDING BRASS AND FORMING ORBITAL
RIVET STEEL RIVETING
MACHINE
18. GROUNDING CORE COPPER DRAWING DRAWING
WIRE PLATES
INSULATION PVC COATING
BY
EXTRUTIO
N
19. STEAM BOX STEEL HYDROFO HYDROFRO
RMIG(PRE MING
SSING) MACHINE
20. INNER BOX STEEL 1. PRESSF
ORMING
2. POLISHI
NG
3. METAL
CUTTING
4. EMBRO
SSING
16. BODY FRAME ALUMINIUM MOLDING MOLDING
MACHINE
17. OUT POT ALUMINIUM 1. MOLDIN 1. MOLDIN
G G MACHINE
2. TRIMMI 2. LATHE
NG MACHINE
THERMOFUSE
19. TEMPARETURE MAGNETIC
LIMITER STEEL
25. PCB
20. HEATER ALUMINIUM FORMING
PLATE
21. ENCLOSURE POLYPROPYLENE ROTATION MOLDING
AL MACHINE
MOLDING
22. BASE POLYPROYLENE INJECTION
MOLDING
23 POWER CABLE LIVE CABLE COPPER DRAWING

NEUTRAL PVC EMBROSSI


CABLE NG
EARTHING

26 POWER PLUG OUTTER


CASE
CONTACTS

Table 1.2 shows the work plan of an electric pot.


REFFRENCE.

1. Amazon.com
2. Blog.mazitekgh.com/2017/02/how-rice-cooker-appliance-works-and-how.html
3. Workshop Processes, Pactices And Materials. Bruce J. Black ( Chapter 13)
4.

You might also like