Professional Documents
Culture Documents
Name of Work: Supply of the plumbing fittings, carpentry and building materials at AIIMS Bhopal
Major Head Minor Head Detailed Head
//Report//
History: - This detailed estimate amounting Rs 32,93,613/-( Rupees thirty two lack ninety three
thousand six hundred thirteen only ) including 5 % contingencies been framed to cover the probable
cost of above mentioned work to accord technical sanction of the competent authority.
Detailed estimate has been prepared to full fill requirement of plumbing fittings, carpentry items and
other building materials for day to day maintenance work at AIIMS Bhopal.
The estimate has been framed based on the availability of materials at ABEU stores and to prevent
any hampering in day to day maintenance work due to non availability of the materials.
Specifications: Civil: The work shall be carried out as per CPWD specifications.
Cost : Rs 32,93,613/-( Rupees thirty two lack ninety three thousand six hundred thirteen only )
including 5 % contingencies
Time : 1 months
Er S.k. Tiwari
Executive Engineer(Civil)
AIIMS , Bhopal