Professional Documents
Culture Documents
CODE CONTROL Pada DESTILATE
CODE CONTROL Pada DESTILATE
Pressure Gauge
Open Safety Valve
O
Vacuum/Pressure Gauge
Regulating Valve
S
Salinity Sensor
KETERANGAN
Sea water pipe
A B Sence of Flow
Vapour
STARTING PROSEDURE
1. Open valves on the suction and discharge side of the ejector pump.
5. When there is a minimum of 90% vacuum, open hot water inlet and
outlet valves / from jacket cooling system/.
7. Switch on salinometer.
COMPARATOR
B
D C
ERROR
PIVOT
NILAI ( LEVEL ) YG DI
KEHENDAKI (DV)
A I
F
VALVE
IN OUT
CONTROL UNIT
E F A
I + C PROSES
B D CV
PELAMPUNG