L H Ou TOWER
Heavy Duty Cross Flow Type
PT. LIANG CHI INDONESIAai CHI LH
CONSTRUCTIO!
rs
co ;
eros ie Eee
ae | ovacthas
pieced — | reais
Pes
Pec
Gere eer id
Deo’
TEE
HOT WATER BASN
LOUvER
Ta La a
Ds eda as {
908 Wat
Se
Eee
CN
Reece)
LADDER
SeCOOLING TOWER
In order to meet today’s demand for environmental control, industry has shown a growing
er mec eee Ce Ce Ue ee aCe UC eed
Rte uC Cae ae ue
Liang Chi has started research and development of equipment in this field since 1972.
Per em ee i Cee ee CL Cs ee
Oem eter eee ao a Rr ee ao
specifically suited for industrial process system.
POR Cee eae Coe inte Ue ec aU LSE
cooling tower model LHC is recognized as products meeting the ultimately requirement of today’s
Pe) a ‘2 = a LT 4
COOLING TOWER API
How Liang Chi give an immediate Cooling tower assistance to meet Your requirement qround
Ons
eR tae mec Ue Ch ea)
rage of best reliability and easiest maintenance for air-conditioning and Industrial process.
SSL CR ee Re Ce ee ae aCe CMe Re
See eR Ce Oe Cee Mee eee come Ce ce cy
Pua a cr UCR Cac
With all the benefits of field-erection experience and knowledge for special cooling tower
Applications, our high-trainer team of engineers are ready to meet you future need
Cee ae cura
1.CORP(Prete sun
BU CI LCs
so that economical coli a
Seamer
Prue
Cr occ
cana ets
. Water Outlet Temp: 0C
Pa atm ea =
Meee Rh smear ers
Se eae)
ene Cc Mae tog
ere ned
10. Conditions of Area Surrounding Installation Site.
al Equipment Material Including Fan, Reducer & Drive Shaft
ee ue ci)
Re eure ur Mice ce acs Reale)
RN cun ee US Rec Cas uric
eon
OTHER ITEMS
Ce a a ET
rene aa Ta)
. Capacity of Cold Water Basin
Rete Me actu ic
Rae eg
earn eyCOOLING TOWER . LIANG cH
Po mr CCR Ce a eg eae
RU se ee ee eee
me MN
ee ee ic Mura eae eae Ce ee ee
reinforced polyester and asbestos cement boards. The steel is hot dip galvanized after fabrication
DCU ech
CCR Ce ieee CCRC ae IR a ee eR eT]
eu ah ae
We
rune Oe ae ee eR nec Oe ac
RISC Un aa a ance
3. ECONOMI
(otic) Ge
ATE MEMBERGENERAL DESCRIPTION
MECHANICAL EQUIPMENT
eure MU urate gerade aT
ROR anem Sac anC era ci meu te cy
Dees Cmca Cr eT le ee cus
Reema CMe Uri ae mela cg
CMe eee eeu Cume Mec TSM st MNCL: cite Roa
Bote ee CCR Mea a sn late sind
eek a mC UC NCS Lao MN sass ce
of Gear Reducer(Licensed by Nippon Gear Co,, Ltd, Japan),
Eo eeu a LS Waa cule sae aa
eee sects Sune erode
Ten Mo =
Pe Gale) a4 2
Fiberglass Reinforced polyester fan cylinders Employ
Bocce a rece amu Tee ne enema
lerance on fan blade tip Clearance plus less interference of
air passing Through the tower.
FILLING & GRID =
Ue ee ae
Siete Renee Rec ie mn nmetcer a gs Ee
Geena acu ee Lane arm ny
PEM anc u aR S M UT Cm Cum str TT i
eat A ae Cn nce ee ee
TTA eet eM tT Neer Te eta
NOZZLE
The “Liang Chi Nozzle” metering orifices used in The
Pee gM Sere ret eC
Peco m eee ene era auc R OR Clem emt cic
Cea tne Mem McCue Omni ite) My y 7
weathering damage. The use of these “Liang Chi Nozzle”
Te TM ML Lt OL oC LUV Cc an Co) [
Preis DE ae é re
eed oe
neCOOLING TOWER
GENERAL DESCRIPTION —
PTET Unio) LUAU
aces ec amet eee reece Td
Cerro Renee ey eaten aes emcee
Ere ecient ete ae cca meno
Ree atiaat OCS seeee ae Te eteoreoee
Eee ome ces
gern
FAN MOTOR IP 55, CLASS F, 380V /3PH / SOHZ. IP 56, iP 65, HI-EFFICIENCY MOTOR
FAN BLADE AL ALLOY
FAN CYLINDER FIBER GLASS REINFORCED POLYESTER (F.
FIBER GLASS REINFORCED POLYESTER (F.R.P.) | CONCRETE (FOR CONCRETE FRAMEWORK)
FILLING GRID FIBER GLASS REINFORCED POLYESTER (F.R.P.)
DRIFT ELIMINATOR P.V.C. / TRATED WOOD
LADDER AND HANDRAIL WOOD /#.0.6.S.
METERING ORIFICE POLYPROPYLENE
8
5
z
a
BUYER)
|
cml. C{2} LIANG CHI LH G
17500 74120
DCT
2
3970
80
TDC
23840
9960
aAD-cr
520 080 r 2 16930
500 om axis 3860
EDC on 5 ‘00 E 30000
z 9 13300 3 12400 2% 70000)
Remark: I. Standard design comiton i based on Waterllet 37°C, Water Out 32. Ambient Wet Bull Temp. 27°C
2, Opsatng weit inciling tower bay, water basin with contained wp to LX0ram water level fromthe stom
WyCOOLING TOWER
@ LIANG Ch
16910
33520)
9025
emo
28060)
12340
36120
6240
34120
12340
6240
36000.
30850)
10080)
36000
61700
uss
7520)
10590
T3840)
2700
Remark), standard design condition i taed on W:
2. Open wish inching tower body, ware
CT. CORPORATE MEMBER
+ Inlet 37°C, Water Outlet 32°C, Ambient Wet Bulb Temp. 27°
wih contained up o 150mm water lvel from the BotRENOVATION
yi
a y
A ye
GH
44, sie
JE
2 FeTaa iy
QW
YM ISERVICE