You are on page 1of 11
L H Ou TOWER Heavy Duty Cross Flow Type PT. LIANG CHI INDONESIA ai CHI LH CONSTRUCTIO! rs co ; eros ie Eee ae | ovacthas pieced — | reais Pes Pec Gere eer id Deo’ TEE HOT WATER BASN LOUvER Ta La a Ds eda as { 908 Wat Se Eee CN Reece) LADDER Se COOLING TOWER In order to meet today’s demand for environmental control, industry has shown a growing er mec eee Ce Ce Ue ee aCe UC eed Rte uC Cae ae ue Liang Chi has started research and development of equipment in this field since 1972. Per em ee i Cee ee CL Cs ee Oem eter eee ao a Rr ee ao specifically suited for industrial process system. POR Cee eae Coe inte Ue ec aU LSE cooling tower model LHC is recognized as products meeting the ultimately requirement of today’s Pe) a ‘2 = a LT 4 COOLING TOWER API How Liang Chi give an immediate Cooling tower assistance to meet Your requirement qround Ons eR tae mec Ue Ch ea) rage of best reliability and easiest maintenance for air-conditioning and Industrial process. SSL CR ee Re Ce ee ae aCe CMe Re See eR Ce Oe Cee Mee eee come Ce ce cy Pua a cr UCR Cac With all the benefits of field-erection experience and knowledge for special cooling tower Applications, our high-trainer team of engineers are ready to meet you future need Cee ae cura 1.CORP( Prete sun BU CI LCs so that economical coli a Seamer Prue Cr occ cana ets . Water Outlet Temp: 0C Pa atm ea = Meee Rh smear ers Se eae) ene Cc Mae tog ere ned 10. Conditions of Area Surrounding Installation Site. al Equipment Material Including Fan, Reducer & Drive Shaft ee ue ci) Re eure ur Mice ce acs Reale) RN cun ee US Rec Cas uric eon OTHER ITEMS Ce a a ET rene aa Ta) . Capacity of Cold Water Basin Rete Me actu ic Rae eg earn ey COOLING TOWER . LIANG cH Po mr CCR Ce a eg eae RU se ee ee eee me MN ee ee ic Mura eae eae Ce ee ee reinforced polyester and asbestos cement boards. The steel is hot dip galvanized after fabrication DCU ech CCR Ce ieee CCRC ae IR a ee eR eT] eu ah ae We rune Oe ae ee eR nec Oe ac RISC Un aa a ance 3. ECONOMI (otic) Ge ATE MEMBER GENERAL DESCRIPTION MECHANICAL EQUIPMENT eure MU urate gerade aT ROR anem Sac anC era ci meu te cy Dees Cmca Cr eT le ee cus Reema CMe Uri ae mela cg CMe eee eeu Cume Mec TSM st MNCL: cite Roa Bote ee CCR Mea a sn late sind eek a mC UC NCS Lao MN sass ce of Gear Reducer(Licensed by Nippon Gear Co,, Ltd, Japan), Eo eeu a LS Waa cule sae aa eee sects Sune erode Ten Mo = Pe Gale) a4 2 Fiberglass Reinforced polyester fan cylinders Employ Bocce a rece amu Tee ne enema lerance on fan blade tip Clearance plus less interference of air passing Through the tower. FILLING & GRID = Ue ee ae Siete Renee Rec ie mn nmetcer a gs Ee Geena acu ee Lane arm ny PEM anc u aR S M UT Cm Cum str TT i eat A ae Cn nce ee ee TTA eet eM tT Neer Te eta NOZZLE The “Liang Chi Nozzle” metering orifices used in The Pee gM Sere ret eC Peco m eee ene era auc R OR Clem emt cic Cea tne Mem McCue Omni ite) My y 7 weathering damage. The use of these “Liang Chi Nozzle” Te TM ML Lt OL oC LUV Cc an Co) [ Preis DE ae é re eed oe ne COOLING TOWER GENERAL DESCRIPTION — PTET Unio) LUAU aces ec amet eee reece Td Cerro Renee ey eaten aes emcee Ere ecient ete ae cca meno Ree atiaat OCS seeee ae Te eteoreoee Eee ome ces gern FAN MOTOR IP 55, CLASS F, 380V /3PH / SOHZ. IP 56, iP 65, HI-EFFICIENCY MOTOR FAN BLADE AL ALLOY FAN CYLINDER FIBER GLASS REINFORCED POLYESTER (F. FIBER GLASS REINFORCED POLYESTER (F.R.P.) | CONCRETE (FOR CONCRETE FRAMEWORK) FILLING GRID FIBER GLASS REINFORCED POLYESTER (F.R.P.) DRIFT ELIMINATOR P.V.C. / TRATED WOOD LADDER AND HANDRAIL WOOD /#.0.6.S. METERING ORIFICE POLYPROPYLENE 8 5 z a BUYER) | cml. C {2} LIANG CHI LH G 17500 74120 DCT 2 3970 80 TDC 23840 9960 aAD-cr 520 080 r 2 16930 500 om axis 3860 EDC on 5 ‘00 E 30000 z 9 13300 3 12400 2% 70000) Remark: I. Standard design comiton i based on Waterllet 37°C, Water Out 32. Ambient Wet Bull Temp. 27°C 2, Opsatng weit inciling tower bay, water basin with contained wp to LX0ram water level fromthe stom Wy COOLING TOWER @ LIANG Ch 16910 33520) 9025 emo 28060) 12340 36120 6240 34120 12340 6240 36000. 30850) 10080) 36000 61700 uss 7520) 10590 T3840) 2700 Remark), standard design condition i taed on W: 2. Open wish inching tower body, ware CT. CORPORATE MEMBER + Inlet 37°C, Water Outlet 32°C, Ambient Wet Bulb Temp. 27° wih contained up o 150mm water lvel from the Bot RENOVATION yi a y A ye GH 44, sie JE 2 FeTaa iy QW YM I SERVICE

You might also like