PROJECT : MDC OIL GAS (SK320) LTD MUBADALA PETROLEUM TOPSIDES CPP (PEGAGA PROJECT)

TOTAL SPOOL 396


CLIENT : MUBADALA PETROLEUM FABRICATE 133
JOB NO. : TBA INSTALL 15
TOTAL JOINT 2390

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA SPOOL RECEIVE
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH AT SITE
6"-WW-66032-Z01N_CED Z01N WW 1 1 OF 1 C1 FJ 1 TF 6 2420C

6"-WW-66032-Z01N_CED Z01N WW 1 1 OF 1 C1 FJ 2 TF 6 2420C


1
6"-WW-66032-Z01N_CED Z01N WW 1 1 OF 1 C1 J 3 TF 6 2420C 6 12/7/2019

6"-WW-66032-Z01N_CED Z01N WW 1 1 OF 1 C1 FJ 4 TF 6 2420C

6"-WW-66035-Z01N_CED Z01N WW 1 1 OF 1 C1 J 1 TF 6 2420C 6 12/9/2019

6"-WW-66035-Z01N_CED Z01N WW 1 1 1 OF 1 C1 FJ 2 TF 6 2420C

6"-WW-66035-Z01N_CED Z01N WW 1 1 OF 1 C1 FJ 3 TF 6 2420C

6"-WW-66035-Z01N_CED Z01N WW 2 1 1 OF 1 C1 FJ 4 TF 6 2420C

6"-WW-66035-Z01N_CED Z01N WW 3 1 1 OF 1 C1 FJ 5 TF 6 2420C

6"-WW-66035-Z01N_CED Z01N WW 4 1 OF 1 C1 FJ 6 TF 6 2420C

6"-WW-66035-Z01N_CED Z01N WW 4 1 OF 1 C1 J 7 TF 6 2420C 6 12/9/2019

6"-WW-66035-Z01N_CED Z01N WW 4 1 1 OF 1 C1 J 8 TF 6 2420C 6 12/9/2019

6"-WW-66035-Z01N_CED Z01N WW 4 1 OF 1 C1 J 9 TF 6 2420C 6 12/9/2019

6"-WW-66035-Z01N_CED Z01N WW 4 1 OF 1 C1 J 10 TF 6 2420C 6 12/9/2019

6"-WW-66016-Z01N_CED Y01N WW 1 1 OF 1 C1 J 1 TF 6 2420C

6"-WW-66016-Z01N_CED Y01N WW 1 1 1 OF 1 C1 FJ 2 TF 6 2420C

6"-WW-66016-Z01N_CED Y01N WW 1 1 OF 1 C1 J 3 TF 6 2420C 6 ;9/12/19

6"-WW-66016-Z01N_CED Y01N WW 2 1 OF 1 C2 J 4 TF 6 2420C 6 ;9/12/19

6"-WW-66016-Z01N_CED Y01N WW 2 1 1 OF 1 C2 J 5 TF 6 2420C

6"-WW-66016-Z01N_CED Y01N WW 2 1 OF 1 C2 FJ 6 TF 6 2420C

6"-WW-66016-Z01N_CED Y01N WW 3 1 OF 1 C2 J 7 TF 6 2420C

6"-WW-66016-Z01N_CED Y01N WW 3 1 OF 1 C2 J 8 TF 6 2420C 6 12/9/2019


1
6"-WW-66016-Z01N_CED Y01N WW 3 1 OF 1 C2 J 9 TF 6 2420C

6"-WW-66016-Z01N_CED Y01N WW 3 1 OF 1 C2 J 10 TF 6 2420C 6 12/9/2019

Page 1 of 225
PROJECT : MDC OIL GAS (SK320) LTD MUBADALA PETROLEUM TOPSIDES CPP (PEGAGA PROJECT)
TOTAL SPOOL 396
CLIENT : MUBADALA PETROLEUM FABRICATE 133
JOB NO. : TBA INSTALL 15
TOTAL JOINT 2390

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA SPOOL RECEIVE
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH AT SITE
PROJECT : MDC OIL GAS (SK320) LTD MUBADALA PETROLEUM TOPSIDES CPP (PEGAGA PROJECT)
TOTAL SPOOL 396
CLIENT : MUBADALA PETROLEUM FABRICATE 133
JOB NO. : TBA INSTALL 15
TOTAL JOINT 2390

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA SPOOL RECEIVE
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH AT SITE

Page 3 of 225
PROJECT : MDC OIL GAS (SK320) LTD MUBADALA PETROLEUM TOPSIDES CPP (PEGAGA PROJECT)
TOTAL SPOOL 396
CLIENT : MUBADALA PETROLEUM FABRICATE 133
JOB NO. : TBA INSTALL 15
TOTAL JOINT 2390

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA SPOOL RECEIVE
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH AT SITE
TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 8159 129 718 5922 73 505 2237 55
TOTAL DIA INCH 14782.5 WU 1235 74 395 932 44 305 303 29
FAB DIA INCH 7203 WW 144 8 24 84 4 14 60 4
INSTALL DIA INCH 47 WF 5244.5 185 1296 4219 87 941 1025.5 98
FAB JOINT 1227

DATE JOINT HYDROTEST


REMARK REMARKS
RFI NO. DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE

Page 5 of 225
TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 8159 129 718 5922 73 505 2237 55
TOTAL DIA INCH 14782.5 WU 1235 74 395 932 44 305 303 29
FAB DIA INCH 7203 WW 144 8 24 84 4 14 60 4
INSTALL DIA INCH 47 WF 5244.5 185 1296 4219 87 941 1025.5 98
FAB JOINT 1227

DATE JOINT HYDROTEST


REMARK REMARKS
RFI NO. DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE
TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 8159 129 718 5922 73 505 2237 55
TOTAL DIA INCH 14782.5 WU 1235 74 395 932 44 305 303 29
FAB DIA INCH 7203 WW 144 8 24 84 4 14 60 4
INSTALL DIA INCH 47 WF 5244.5 185 1296 4219 87 941 1025.5 98
FAB JOINT 1227

DATE JOINT HYDROTEST


REMARK REMARKS
RFI NO. DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE

Page 7 of 225
TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 8159 129 718 5922 73 505 2237 55
TOTAL DIA INCH 14782.5 WU 1235 74 395 932 44 305 303 29
FAB DIA INCH 7203 WW 144 8 24 84 4 14 60 4
INSTALL DIA INCH 47 WF 5244.5 185 1296 4219 87 941 1025.5 98
FAB JOINT 1227

DATE JOINT HYDROTEST


REMARK REMARKS
RFI NO. DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE
double

PROJECT : MDC OIL GAS


(SK320) LTD TOTAL SPOOL 491
MUBADALA
CLIENT : MUBADALA PETROLEUM
PETROLEUM FABRICATE 176
JOB NO. :TOPSIDES
TBA CPP INSTALL 1
(PEGAGA PROJECT) TOTAL JOINT 2283

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE REMART
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH
12"-WF-71015-Z01N_MAD2 Z01N WF 1 1 OF 2 C1 J 1 TF 12 2420C

12"-WF-71015-Z01N_MAD2 Z01N WF 1 1 1 OF 2 C1 J 2 TF 12 2420C

12"-WF-71015-Z01N_MAD2 Z01N WF 1 1 OF 2 C1 J 3 TF 12 2420C

12"-WF-71015-Z01N_MAD2 Z01N WF 2 1 1 OF 2 C1 FJ 4 TF 12 2420C

12"-WF-71015-Z01N_MAD2 Z01N WF 3 1 1 OF 2 C1 FJ 5 TF 12 2420C

12"-WF-71015-Z01N_MAD2 Z01N WF 4 1 OF 2 C1 FJ 6 TF 12 2420C

12"-WF-71015-Z01N_MAD2 Z01N WF 4 1 OF 2 C1 J 7 TF 12 2420C


1
12"-WF-71015-Z01N_MAD2 Z01N WF 4 1 OF 2 C1 J 8 TF 12 2420C

12"-WF-71015-Z01N_MAD2 Z01N WF 4 1 OF 2 C1 J 9 TF 12 2420C

12"-WF-71015-Z01N_MAD2 Z01N WF 5 1 OF 2 C1 FJ 10 TF 12 2420C

12"-WF-71015-Z01N_MAD2 Z01N WF 5 1 OF 2 C1 J 11 TF 12 2420C


1
12"-WF-71015-Z01N_MAD2 Z01N WF 5 1 OF 2 C1 J 12 TF 12 2420C

12"-WF-71015-Z01N_MAD2 Z01N WF 5 1 OF 2 C1 FJ 13 TF 12 2420C

12"-WF-71015-Z01N_MAD2 Z01N WF 6 2 OF2 C1 J 14 TF 12 2420C

12"-WF-71015-Z01N_MAD2 Z01N WF 6 2 OF2 C1 J 15 TF 12 2420C


1
12"-WF-71015-Z01N_MAD2 Z01N WF 6 2 OF2 C1 J 16 TF 12 2420C

12"-WF-71015-Z01N_MAD2 Z01N WF 6 2 OF2 C1 J 17 TF 12 2420C

12"-WF-71015-Z01N_MAD2 Z01N WF 7 2 OF2 C1 FJ 18 TF 12 2420C

12"-WF-71015-Z01N_MAD2 Z01N WF 7 2 OF2 C1 J 19 TF 12 2420C

12"-WF-71015-Z01N_MAD2 Z01N WF 7 1 2 OF2 C1 J 20 TF 12 2420C

12"-WF-71015-Z01N_MAD2 Z01N WF 7 2 OF2 C1 J 21 TF 12 2420C

12"-WF-71015-Z01N_MAD2 Z01N WF 7 2 OF2 C1 J 22 TF 12 2420C

12"-WF-71015-Z01N_MAD1 Z01N WF 1 1 OF 2 C1 J 1 TF 12 2420C

12"-WF-71015-Z01N_MAD1 Z01N WF 1 1 1 OF 2 C1 J 2 TF 12 2420C

12"-WF-71015-Z01N_MAD1 Z01N WF 1 1 OF 2 C1 J 3 TF 12 2420C

12"-WF-71015-Z01N_MAD1 Z01N WF 2 1 OF 2 C1 J 4 TF 12 2420C

12"-WF-71015-Z01N_MAD1 Z01N WF 2 1 1 OF 2 C1 FJ 5 TF 12 2420C

Page 9 of 225
double

PROJECT : MDC OIL GAS


(SK320) LTD TOTAL SPOOL 491
MUBADALA
CLIENT : MUBADALA PETROLEUM
PETROLEUM FABRICATE 176
JOB NO. :TOPSIDES
TBA CPP INSTALL 1
(PEGAGA PROJECT) TOTAL JOINT 2283

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM 1 MATE. 1 MATE. 2 DATE REMART
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH
12"-WF-71015-Z01N_MAD1 Z01N WF 2 1 OF 2 C1 J 6 TF 12 2420C

12"-WF-71015-Z01N_MAD1 Z01N WF 3 1 OF 2 C1 FJ 7 TF 12 2420C

12"-WF-71015-Z01N_MAD1 Z01N WF 3 1 OF 2 C1 J 8 TF 12 2420C


1
12"-WF-71015-Z01N_MAD1 Z01N WF 3 1 OF 2 C1 J 9 TF 12 2420C

12"-WF-71015-Z01N_MAD1 Z01N WF 3 1 OF 2 C1 FJ 10 TF 12 2420C

12"-WF-71015-Z01N_MAD1 Z01N WF 4 2 OF2 C1 J 11 TF 12 2420C

12"-WF-71015-Z01N_MAD1 Z01N WF 4 2 OF2 C1 J 12 TF 12 2420C

12"-WF-71015-Z01N_MAD1 Z01N WF 4 2 OF2 C1 J 13 TF 12 2420C


1
12"-WF-71015-Z01N_MAD1 Z01N WF 4 2 OF2 C1 J 14 TF 12 2420C

12"-WF-71015-Z01N_MAD1 Z01N WF 4 2 OF2 C1 J 15 TF 12 2420C

12"-WF-71015-Z01N_MAD1 Z01N WF 4 2 OF2 C1 J 16 TF 12 2420C

12"-WF-71015-Z01N_MAD1 Z01N WF 5 1 2 OF2 C1 FJ 17 TF 12 2420C

12"-WF-71015-Z01N_MAD1 Z01N WF 6 2 OF2 C1 FJ 18 TF 12 2420C

12"-WF-71015-Z01N_MAD1 Z01N WF 6 2 OF2 C1 J 19 TF 12 2420C


1
12"-WF-71015-Z01N_MAD1 Z01N WF 6 2 OF2 C1 J 20 TF 12 2420C

12"-WF-71015-Z01N_MAD1 Z01N WF 6 2 OF2 C1 J 21 TF 12 2420C


double

PROJECT : MDC OIL GAS


(SK320) LTD TOTAL SPOOL 491
MUBADALA
CLIENT : MUBADALA PETROLEUM
PETROLEUM FABRICATE 176
JOB NO. :TOPSIDES
TBA CPP INSTALL 1
(PEGAGA PROJECT) TOTAL JOINT 2283

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE REMART
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH

Page 11 of 225
double

PROJECT : MDC OIL GAS


(SK320) LTD TOTAL SPOOL 491
MUBADALA
CLIENT : MUBADALA PETROLEUM
PETROLEUM FABRICATE 176
JOB NO. :TOPSIDES
TBA CPP INSTALL 1
(PEGAGA PROJECT) TOTAL JOINT 2283

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE REMART
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH
double

PROJECT : MDC OIL GAS


(SK320) LTD TOTAL SPOOL 491
MUBADALA
CLIENT : MUBADALA PETROLEUM
PETROLEUM FABRICATE 176
JOB NO. :TOPSIDES
TBA CPP INSTALL 1
(PEGAGA PROJECT) TOTAL JOINT 2283

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE REMART
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH

Page 13 of 225
double

PROJECT : MDC OIL GAS


(SK320) LTD TOTAL SPOOL 491
MUBADALA
CLIENT : MUBADALA PETROLEUM
PETROLEUM FABRICATE 176
JOB NO. :TOPSIDES
TBA CPP INSTALL 1
(PEGAGA PROJECT) TOTAL JOINT 2283

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE REMART
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH
double

PROJECT : MDC OIL GAS


(SK320) LTD TOTAL SPOOL 491
MUBADALA
CLIENT : MUBADALA PETROLEUM
PETROLEUM FABRICATE 176
JOB NO. :TOPSIDES
TBA CPP INSTALL 1
(PEGAGA PROJECT) TOTAL JOINT 2283

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE REMART
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH

Page 15 of 225
double

PROJECT : MDC OIL GAS


(SK320) LTD TOTAL SPOOL 491
MUBADALA
CLIENT : MUBADALA PETROLEUM
PETROLEUM FABRICATE 176
JOB NO. :TOPSIDES
TBA CPP INSTALL 1
(PEGAGA PROJECT) TOTAL JOINT 2283

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE REMART
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH
double

PROJECT : MDC OIL GAS


(SK320) LTD TOTAL SPOOL 491
MUBADALA
CLIENT : MUBADALA PETROLEUM
PETROLEUM FABRICATE 176
JOB NO. :TOPSIDES
TBA CPP INSTALL 1
(PEGAGA PROJECT) TOTAL JOINT 2283

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE REMART
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH

Page 17 of 225
double

PROJECT : MDC OIL GAS


(SK320) LTD TOTAL SPOOL 491
MUBADALA
CLIENT : MUBADALA PETROLEUM
PETROLEUM FABRICATE 176
JOB NO. :TOPSIDES
TBA CPP INSTALL 1
(PEGAGA PROJECT) TOTAL JOINT 2283

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE REMART
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH
double

PROJECT : MDC OIL GAS


(SK320) LTD TOTAL SPOOL 491
MUBADALA
CLIENT : MUBADALA PETROLEUM
PETROLEUM FABRICATE 176
JOB NO. :TOPSIDES
TBA CPP INSTALL 1
(PEGAGA PROJECT) TOTAL JOINT 2283

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE REMART
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH

Page 19 of 225
double

PROJECT : MDC OIL GAS


(SK320) LTD TOTAL SPOOL 491
MUBADALA
CLIENT : MUBADALA PETROLEUM
PETROLEUM FABRICATE 176
JOB NO. :TOPSIDES
TBA CPP INSTALL 1
(PEGAGA PROJECT) TOTAL JOINT 2283

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE REMART
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH
double

PROJECT : MDC OIL GAS


(SK320) LTD TOTAL SPOOL 491
MUBADALA
CLIENT : MUBADALA PETROLEUM
PETROLEUM FABRICATE 176
JOB NO. :TOPSIDES
TBA CPP INSTALL 1
(PEGAGA PROJECT) TOTAL JOINT 2283

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE REMART
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH

Page 21 of 225
double

PROJECT : MDC OIL GAS


(SK320) LTD TOTAL SPOOL 491
MUBADALA
CLIENT : MUBADALA PETROLEUM
PETROLEUM FABRICATE 176
JOB NO. :TOPSIDES
TBA CPP INSTALL 1
(PEGAGA PROJECT) TOTAL JOINT 2283

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE REMART
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH
double

PROJECT : MDC OIL GAS


(SK320) LTD TOTAL SPOOL 491
MUBADALA
CLIENT : MUBADALA PETROLEUM
PETROLEUM FABRICATE 176
JOB NO. :TOPSIDES
TBA CPP INSTALL 1
(PEGAGA PROJECT) TOTAL JOINT 2283

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE REMART
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH

Page 23 of 225
double

PROJECT : MDC OIL GAS


(SK320) LTD TOTAL SPOOL 491
MUBADALA
CLIENT : MUBADALA PETROLEUM
PETROLEUM FABRICATE 176
JOB NO. :TOPSIDES
TBA CPP INSTALL 1
(PEGAGA PROJECT) TOTAL JOINT 2283

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE REMART
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH
double

PROJECT : MDC OIL GAS


(SK320) LTD TOTAL SPOOL 491
MUBADALA
CLIENT : MUBADALA PETROLEUM
PETROLEUM FABRICATE 176
JOB NO. :TOPSIDES
TBA CPP INSTALL 1
(PEGAGA PROJECT) TOTAL JOINT 2283

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE REMART
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH

Page 25 of 225
double

PROJECT : MDC OIL GAS


(SK320) LTD TOTAL SPOOL 491
MUBADALA
CLIENT : MUBADALA PETROLEUM
PETROLEUM FABRICATE 176
JOB NO. :TOPSIDES
TBA CPP INSTALL 1
(PEGAGA PROJECT) TOTAL JOINT 2283

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE REMART
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH
double

PROJECT : MDC OIL GAS


(SK320) LTD TOTAL SPOOL 491
MUBADALA
CLIENT : MUBADALA PETROLEUM
PETROLEUM FABRICATE 176
JOB NO. :TOPSIDES
TBA CPP INSTALL 1
(PEGAGA PROJECT) TOTAL JOINT 2283

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE REMART
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH

Page 27 of 225
double

PROJECT : MDC OIL GAS


(SK320) LTD TOTAL SPOOL 491
MUBADALA
CLIENT : MUBADALA PETROLEUM
PETROLEUM FABRICATE 176
JOB NO. :TOPSIDES
TBA CPP INSTALL 1
(PEGAGA PROJECT) TOTAL JOINT 2283

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE REMART
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH
double

PROJECT : MDC OIL GAS


(SK320) LTD TOTAL SPOOL 491
MUBADALA
CLIENT : MUBADALA PETROLEUM
PETROLEUM FABRICATE 176
JOB NO. :TOPSIDES
TBA CPP INSTALL 1
(PEGAGA PROJECT) TOTAL JOINT 2283

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE REMART
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH

Page 29 of 225
double

PROJECT : MDC OIL GAS


(SK320) LTD TOTAL SPOOL 491
MUBADALA
CLIENT : MUBADALA PETROLEUM
PETROLEUM FABRICATE 176
JOB NO. :TOPSIDES
TBA CPP INSTALL 1
(PEGAGA PROJECT) TOTAL JOINT 2283

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE REMART
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH
double

PROJECT : MDC OIL GAS


(SK320) LTD TOTAL SPOOL 491
MUBADALA
CLIENT : MUBADALA PETROLEUM
PETROLEUM FABRICATE 176
JOB NO. :TOPSIDES
TBA CPP INSTALL 1
(PEGAGA PROJECT) TOTAL JOINT 2283

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE REMART
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH

Page 31 of 225
double

PROJECT : MDC OIL GAS


(SK320) LTD TOTAL SPOOL 491
MUBADALA
CLIENT : MUBADALA PETROLEUM
PETROLEUM FABRICATE 176
JOB NO. :TOPSIDES
TBA CPP INSTALL 1
(PEGAGA PROJECT) TOTAL JOINT 2283

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE REMART
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH
double

PROJECT : MDC OIL GAS


(SK320) LTD TOTAL SPOOL 491
MUBADALA
CLIENT :PETROLEUM
MUBADALA PETROLEUM FABRICATE 176
JOB NO. : TBA
TOPSIDES CPP INSTALL 1
(PEGAGA PROJECT) TOTAL JOINT 2283

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE REMART
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH

Page 33 of 225
TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 2644.5 68 330 1573 22 239 1065.5 44
TOTAL DIA INCH 10935 WU 744 88 399 525 13 287 219 73
FAB DIA INCH 4217 WF 7426.5 330 1545 5076.5 62 1013 2350 268
INSTALL DIA INCH 0 WW 120 5 20 108 3 18 12 2
FAB JOINT 946 VT 0 0 4 0 0 0 0 0

VISUAL HYDROTEST
REMARKS
RFI NO. DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE
TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 2644.5 68 330 1573 22 239 1065.5 44
TOTAL DIA INCH 10935 WU 744 88 399 525 13 287 219 73
FAB DIA INCH 4217 WF 7426.5 330 1545 5076.5 62 1013 2350 268
INSTALL DIA INCH 0 WW 120 5 20 108 3 18 12 2
FAB JOINT 946 VT 0 0 4 0 0 0 0 0

VISUAL HYDROTEST
REMARKS
RFI NO. DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE

Page 35 of 225
TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 2644.5 68 330 1573 22 239 1065.5 44
TOTAL DIA INCH 10935 WU 744 88 399 525 13 287 219 73
FAB DIA INCH 4217 WF 7426.5 330 1545 5076.5 62 1013 2350 268
INSTALL DIA INCH 0 WW 120 5 20 108 3 18 12 2
FAB JOINT 946 VT 0 0 4 0 0 0 0 0

VISUAL HYDROTEST
REMARKS
RFI NO. DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE
TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 2644.5 68 330 1573 22 239 1065.5 44
TOTAL DIA INCH 10935 WU 744 88 399 525 13 287 219 73
FAB DIA INCH 4217 WF 7426.5 330 1545 5076.5 62 1013 2350 268
INSTALL DIA INCH 0 WW 120 5 20 108 3 18 12 2
FAB JOINT 946 VT 0 0 4 0 0 0 0 0

VISUAL HYDROTEST
REMARKS
RFI NO. DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE

Page 37 of 225
TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 2644.5 68 330 1573 22 239 1065.5 44
TOTAL DIA INCH 10935 WU 744 88 399 525 13 287 219 73
FAB DIA INCH 4217 WF 7426.5 330 1545 5076.5 62 1013 2350 268
INSTALL DIA INCH 0 WW 120 5 20 108 3 18 12 2
FAB JOINT 946 VT 0 0 4 0 0 0 0 0

VISUAL HYDROTEST
REMARKS
RFI NO. DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE
TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 2644.5 68 330 1573 22 239 1065.5 44
TOTAL DIA INCH 10935 WU 744 88 399 525 13 287 219 73
FAB DIA INCH 4217 WF 7426.5 330 1545 5076.5 62 1013 2350 268
INSTALL DIA INCH 0 WW 120 5 20 108 3 18 12 2
FAB JOINT 946 VT 0 0 4 0 0 0 0 0

VISUAL HYDROTEST
REMARKS
RFI NO. DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE

Page 39 of 225
TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 2644.5 68 330 1573 22 239 1065.5 44
TOTAL DIA INCH 10935 WU 744 88 399 525 13 287 219 73
FAB DIA INCH 4217 WF 7426.5 330 1545 5076.5 62 1013 2350 268
INSTALL DIA INCH 0 WW 120 5 20 108 3 18 12 2
FAB JOINT 946 VT 0 0 4 0 0 0 0 0

VISUAL HYDROTEST
REMARKS
RFI NO. DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE
TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 2644.5 68 330 1573 22 239 1065.5 44
TOTAL DIA INCH 10935 WU 744 88 399 525 13 287 219 73
FAB DIA INCH 4217 WF 7426.5 330 1545 5076.5 62 1013 2350 268
INSTALL DIA INCH 0 WW 120 5 20 108 3 18 12 2
FAB JOINT 946 VT 0 0 4 0 0 0 0 0

VISUAL HYDROTEST
REMARKS
RFI NO. DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE

Page 41 of 225
TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 2644.5 68 330 1573 22 239 1065.5 44
TOTAL DIA INCH 10935 WU 744 88 399 525 13 287 219 73
FAB DIA INCH 4217 WF 7426.5 330 1545 5076.5 62 1013 2350 268
INSTALL DIA INCH 0 WW 120 5 20 108 3 18 12 2
FAB JOINT 946 VT 0 0 4 0 0 0 0 0

VISUAL HYDROTEST
REMARKS
RFI NO. DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE
TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 2644.5 68 330 1573 22 239 1065.5 44
TOTAL DIA INCH 10935 WU 744 88 399 525 13 287 219 73
FAB DIA INCH 4217 WF 7426.5 330 1545 5076.5 62 1013 2350 268
INSTALL DIA INCH 0 WW 120 5 20 108 3 18 12 2
FAB JOINT 946 VT 0 0 4 0 0 0 0 0

VISUAL HYDROTEST
REMARKS
RFI NO. DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE

Page 43 of 225
TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 2644.5 68 330 1573 22 239 1065.5 44
TOTAL DIA INCH 10935 WU 744 88 399 525 13 287 219 73
FAB DIA INCH 4217 WF 7426.5 330 1545 5076.5 62 1013 2350 268
INSTALL DIA INCH 0 WW 120 5 20 108 3 18 12 2
FAB JOINT 946 VT 0 0 4 0 0 0 0 0

VISUAL HYDROTEST
REMARKS
RFI NO. DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE
TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 2644.5 68 330 1573 22 239 1065.5 44
TOTAL DIA INCH 10935 WU 744 88 399 525 13 287 219 73
FAB DIA INCH 4217 WF 7426.5 330 1545 5076.5 62 1013 2350 268
INSTALL DIA INCH 0 WW 120 5 20 108 3 18 12 2
FAB JOINT 946 VT 0 0 4 0 0 0 0 0

VISUAL HYDROTEST
REMARKS
RFI NO. DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE

Page 45 of 225
TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 2644.5 68 330 1573 22 239 1065.5 44
TOTAL DIA INCH 10935 WU 744 88 399 525 13 287 219 73
FAB DIA INCH 4217 WF 7426.5 330 1545 5076.5 62 1013 2350 268
INSTALL DIA INCH 0 WW 120 5 20 108 3 18 12 2
FAB JOINT 946 VT 0 0 4 0 0 0 0 0

VISUAL HYDROTEST
REMARKS
RFI NO. DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE
TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 2644.5 68 330 1573 22 239 1065.5 44
TOTAL DIA INCH 10935 WU 744 88 399 525 13 287 219 73
FAB DIA INCH 4217 WF 7426.5 330 1545 5076.5 62 1013 2350 268
INSTALL DIA INCH 0 WW 120 5 20 108 3 18 12 2
FAB JOINT 946 VT 0 0 4 0 0 0 0 0

VISUAL HYDROTEST
REMARKS
RFI NO. DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE

Page 47 of 225
TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 2644.5 68 330 1573 22 239 1065.5 44
TOTAL DIA INCH 10935 WU 744 88 399 525 13 287 219 73
FAB DIA INCH 4217 WF 7426.5 330 1545 5076.5 62 1013 2350 268
INSTALL DIA INCH 0 WW 120 5 20 108 3 18 12 2
FAB JOINT 946 VT 0 0 4 0 0 0 0 0

VISUAL HYDROTEST
REMARKS
RFI NO. DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE
TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 2644.5 68 330 1573 22 239 1065.5 44
TOTAL DIA INCH 10935 WU 744 88 399 525 13 287 219 73
FAB DIA INCH 4217 WF 7426.5 330 1545 5076.5 62 1013 2350 268
INSTALL DIA INCH 0 WW 120 5 20 108 3 18 12 2
FAB JOINT 946 VT 0 0 4 0 0 0 0 0

VISUAL HYDROTEST
REMARKS
RFI NO. DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE

Page 49 of 225
TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 2644.5 68 330 1573 22 239 1065.5 44
TOTAL DIA INCH 10935 WU 744 88 399 525 13 287 219 73
FAB DIA INCH 4217 WF 7426.5 330 1545 5076.5 62 1013 2350 268
INSTALL DIA INCH 0 WW 120 5 20 108 3 18 12 2
FAB JOINT 946 VT 0 0 4 0 0 0 0 0

VISUAL HYDROTEST
REMARKS
RFI NO. DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE
TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 2644.5 68 330 1573 22 239 1065.5 44
TOTAL DIA INCH 10935 WU 744 88 399 525 13 287 219 73
FAB DIA INCH 4217 WF 7426.5 330 1545 5076.5 62 1013 2350 268
INSTALL DIA INCH 0 WW 120 5 20 108 3 18 12 2
FAB JOINT 946 VT 0 0 4 0 0 0 0 0

VISUAL HYDROTEST
REMARKS
RFI NO. DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE

Page 51 of 225
TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 2644.5 68 330 1573 22 239 1065.5 44
TOTAL DIA INCH 10935 WU 744 88 399 525 13 287 219 73
FAB DIA INCH 4217 WF 7426.5 330 1545 5076.5 62 1013 2350 268
INSTALL DIA INCH 0 WW 120 5 20 108 3 18 12 2
FAB JOINT 946 VT 0 0 4 0 0 0 0 0

VISUAL HYDROTEST
REMARKS
RFI NO. DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE
TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 2644.5 68 330 1573 22 239 1065.5 44
TOTAL DIA INCH 10935 WU 744 88 399 525 13 287 219 73
FAB DIA INCH 4217 WF 7426.5 330 1545 5076.5 62 1013 2350 268
INSTALL DIA INCH 0 WW 120 5 20 108 3 18 12 2
FAB JOINT 946 VT 0 0 4 0 0 0 0 0

VISUAL HYDROTEST
REMARKS
RFI NO. DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE

Page 53 of 225
TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 2644.5 68 330 1573 22 239 1065.5 44
TOTAL DIA INCH 10935 WU 744 88 399 525 13 287 219 73
FAB DIA INCH 4217 WF 7426.5 330 1545 5076.5 62 1013 2350 268
INSTALL DIA INCH 0 WW 120 5 20 108 3 18 12 2
FAB JOINT 946 VT 0 0 4 0 0 0 0 0

VISUAL HYDROTEST
REMARKS
RFI NO. DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE
TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 2644.5 68 330 1573 22 239 1065.5 44
TOTAL DIA INCH 10935 WU 744 88 399 525 13 287 219 73
FAB DIA INCH 4217 WF 7426.5 330 1545 5076.5 62 1013 2350 268
INSTALL DIA INCH 0 WW 120 5 20 108 3 18 12 2
FAB JOINT 946 VT 0 0 4 0 0 0 0 0

VISUAL HYDROTEST
REMARKS
RFI NO. DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE

Page 55 of 225
TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 2644.5 68 330 1573 22 239 1065.5 44
TOTAL DIA INCH 10935 WU 744 88 399 525 13 287 219 73
FAB DIA INCH 4217 WF 7426.5 330 1545 5076.5 62 1013 2350 268
INSTALL DIA INCH 0 WW 120 5 20 108 3 18 12 2
FAB JOINT 946 VT 0 0 4 0 0 0 0 0

VISUAL HYDROTEST
REMARKS
RFI NO. DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE
TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 2644.5 68 330 1573 22 239 1065.5 44
TOTAL DIA INCH 10935 WU 744 88 399 525 13 287 219 73
FAB DIA INCH 4217 WF 7426.5 330 1545 5076.5 62 1013 2350 268
INSTALL DIA INCH 0 WW 120 5 20 108 3 18 12 2
FAB JOINT 946 VT 0 0 4 0 0 0 0 0

VISUAL HYDROTEST
REMARKS
RFI NO. DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE

Page 57 of 225
TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 2644.5 68 330 1573 22 239 1065.5 44
TOTAL DIA INCH 10935 WU 744 88 399 525 13 287 219 73
FAB DIA INCH 4217 WF 7426.5 330 1545 5076.5 62 1013 2350 268
INSTALL DIA INCH 0 WW 120 5 20 108 3 18 12 2
FAB JOINT 946 VT 0 0 4 0 0 0 0 0

VISUAL HYDROTEST
REMARKS
RFI NO. DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE
PROJECT : MDC OIL GAS (SK320) LTD MUBADALA PETROLEUM TOPSIDES CPP (PEGAGA PROJECT)
TOTAL SPOOL 25
CLIENT : MUBADALA PETROLEUM FABRICATE 9
JOB NO. : TBA INSTALL 0
TOTAL JOINT 127

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE REMARK
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH
8"-WF-71103-Z01N_MZD Z10N WF 1 1 OF 1 C2 FJ 1 TF 10 2420C
1
8"-WF-71103-Z01N_MZD Z10N WF 1 1 OF 1 C2 J 2 TF 10 2420C

Page 59 of 225
TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 385.5 11 76 277.5 7 52 108 4
TOTAL DIA INCH 568 WF 180.5 13 55 111 2 30 69.5 11
FAB DIA INCH 184 WW 0 0 0 0 0 0 0 0
INSTALL DIA INCH 0 WU 2 1 2 1 0 1 1 1
FAB JOINT 44

VISUAL HYDROTEST
REMARKS
RFI NO. DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE
PROJECT : MDC OIL GAS (SK320) LTD MUBADALA PETROLEUM TOPSIDES CPP (PEGAGA PROJECT)
TOTAL SPOOL 93
CLIENT : MUBADALA PETROLEUM FABRICATE 33
JOB NO. : TBA INSTALL 0
TOTAL JOINT 616

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE REMARK
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH
8"-WF-71098-Z01N_UPD Z10N WF 1 1 OF 1 C1 FJ 1 TF 8 2420C

8"-WF-71098-Z01N_UPD Z10N WF 1 1 1 OF 1 C1 J 2 TF 8 2420C

8"-WF-71098-Z01N_UPD Z10N WF 1 1 OF 1 C1 J 3 TF 8 2420C

8"-WF-71098-Z01N_UPD Z10N WF 2 1 1 OF 1 C1 FJ 4 TF 8 2420C

8"-WF-71098-Z01N_UPD Z10N WF 3 1 OF 1 C1 FJ 5 TF 8 2420C

8"-WF-71098-Z01N_UPD Z10N WF 3 1 OF 1 C1 J 6 TF 8 2420C


1
8"-WF-71098-Z01N_UPD Z10N WF 3 1 OF 1 C1 J 7 TF 8 2420C

8"-WF-71098-Z01N_UPD Z10N WF 3 1 OF 1 C1 J 8 TF 8 2420C

8"-WF-71098-Z01N_UPD Z10N WF 4 1 OF 1 C1 FJ 9 TF 8 2420C

8"-WF-71098-Z01N_UPD Z10N WF 4 1 OF 1 C1 J 10 TF 8 2420C

8"-WF-71098-Z01N_UPD Z10N WF 4 1 1 OF 1 C1 J 11 TF 8 2420C

8"-WF-71098-Z01N_UPD Z10N WF 4 1 OF 1 C1 J 12 TF 8 2420C

8"-WF-71098-Z01N_UPD Z10N WF 4 1 OF 1 C1 J 13 TF 8 2420C

Page 61 of 225
TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 0 0 0 0 0 0 0 0
TOTAL DIA INCH 1225.5 WU 60 11 54 49 3 45 11 8
FAB DIA INCH 428 WW 0 0 0 0 0 0 0 0
INSTALL DIA INCH 0 WF 1165.5 82 562 860 18 392 300 63
FAB JOINT 243

VISUAL HYDROTEST
REMARKS
RFI NO. DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE
PROJECT : MDC OIL GAS (SK320) LTD MUBADALA PETROLEUM TOPSIDES CPP (PEGAGA PROJECT)
TOTAL SPOOL 37
CLIENT : MUBADALA PETROLEUM FABRICATE 18
JOB NO. : TBA INSTALL 0
TOTAL JOINT 339

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE REMART
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH

8"-WF-71098-Z01N_SED Z01N WF 1 1 OF 2 C2 FJ 1 TF 8 2420C


1
8"-WF-71098-Z01N_SED Z01N WF 1 1 OF 2 C2 J 2 TF 8 2420C

8"-WF-71098-Z01N_SED Z01N WF 2 1 OF 2 C2 FJ 3 TF 8 2420C

8"-WF-71098-Z01N_SED Z01N WF 2 1 1 OF 2 C2 J 4 TF 8 2420C

8"-WF-71098-Z01N_SED Z01N WF 2 1 OF 2 C2 J 5 TF 8 2420C

Page 63 of 225
TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 0 0 0 0 0 0 0 0
TOTAL DIA INCH 774 WU 40 7 26 28 1 19 12 6
FAB DIA INCH 417 WW 0 0 0 0 0 0 0 0
INSTALL DIA INCH 0 WF 734 30 314 542 4 209 189 26
FAB JOINT 174

VISUAL HYDROTEST
REMARKS
RFI NO. DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE
PROJECT : MDC OIL GAS (SK320) LTD MUBADALA PETROLEUM TOPSIDES CPP (PEGAGA PROJECT)
TOTAL SPOOL 40
CLIENT : MUBADALA PETROLEUM FABRICATE 2
JOB NO. : TBA INSTALL 0
TOTAL JOINT 180

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE REMARK
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH
8"-WF-71103-Z01N_HUC Z01N WF 1 1 OF 1 C1 J 1 TF 8 2420C

8"-WF-71103-Z01N_HUC Z01N WF 1 1 OF 1 C1 J 2 TF 8 2420C

8"-WF-71103-Z01N_HUC Z01N WF 1 1 OF 1 C1 J 3 TF 8 2420C


1
8"-WF-71103-Z01N_HUC Z01N WF 1 1 OF 1 C1 J 4 TF 8 2420C

8"-WF-71103-Z01N_HUC Z01N WF 1 1 OF 1 C1 J 5 TF 8 2420C

8"-WF-71103-Z01N_HUC Z01N WF 1 1 OF 1 C1 J 6 TF 8 2420C

8"-WF-71103-Z01N_HUC Z01N WF 2 1 OF 1 C1 J 7 TF 8 2420C

8"-WF-71103-Z01N_HUC Z01N WF 2 1 OF 1 C1 J 8 TF 8 2420C


1
8"-WF-71103-Z01N_HUC Z01N WF 2 1 OF 1 C1 J 9 TF 8 2420C

8"-WF-71103-Z01N_HUC Z01N WF 2 1 OF 1 C1 J 10 TF 8 2420C

Page 65 of 225
TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 560 6 24 560 6 24 0 0
TOTAL DIA INCH 1326.5 WU 100 9 42 100 9 42 0 0
FAB DIA INCH 46 WW 156 9 26 90 4 15 48 3
INSTALL DIA INCH 0 WF 510.5 16 88 470.5 15 82 40 1
FAB JOINT 9

VISUAL HYDROTEST
REMARKS
RFI NO. DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE
PROJECT : MDC OIL GAS (SK320) LTD MUBADALA PETROLEUM TOPSIDES CPP (PEGAGA PROJECT)
TOTAL SPOOL 9 TOTAL DIA INCH
CLIENT : MUBADALA PETROLEUM FABRICATE 4 FAB DIA INCH
JOB NO. : TBA INSTALL 0 INSTALL DIA INCH
TOTAL JOINT 50 FAB JOINT

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH RFI NO.
2"-WU-50016-Y01N_IPS Y01N WS 1 1 OF 1 C1 J 1 TF 2 2420C

2"-WU-50016-Y01N_IPS Y01N WS 1 1 OF 1 C1 J 2 TF 2 2420C


1
2"-WU-50016-Y01N_IPS Y01N WS 1 1 OF 1 C1 J 3 TF 2 2420C

2"-WU-50016-Y01N_IPS Y01N WS 1 1 OF 1 C1 J 4 TF 2 2420C

2"-WU-50017-Y01N_IPS Y01N WS 1 1 OF 1 C1 J 1 TF 2 2420C

2"-WU-50017-Y01N_IPS Y01N WS 1 1 OF 1 C1 J 2 TF 2 2420C

2"-WU-50017-Y01N_IPS Y01N WS 1 1 OF 1 C1 J 3 TF 2 2420C


1
2"-WU-50017-Y01N_IPS Y01N WS 1 1 OF 1 C1 J 4 TF 2 2420C

2"-WU-50017-Y01N_IPS Y01N WS 1 1 OF 1 C1 J 5 TF 2 2420C

2"-WU-50017-Y01N_IPS Y01N WS 1 1 OF 1 C1 J 6 TF 2 2420C

4"-WU-50101-Y01N_IPS Y01N WS 1 1 OF 1 C1 J 1 TF 4 2420C

4"-WU-50101-Y01N_IPS Y01N WS 1 1 OF 1 C1 J 2 TF 4 2420C

4"-WU-50101-Y01N_IPS Y01N WS 1 1 OF 1 C1 J 3 TF 4 2420C


1
4"-WU-50101-Y01N_IPS Y01N WS 1 1 OF 1 C1 J 4 TF 4 2420C

4"-WU-50101-Y01N_IPS Y01N WS 1 1 OF 1 C1 J 5 TF 4 2420C

4"-WU-50101-Y01N_IPS Y01N WS 1 1 OF 1 C1 J 6 TF 4 2420C

6"-WF-50028-Y01N_IPS Y01N WF 1 1 OF 1 C1 J 1 TF 6 2420C 6 12/5/2019

6"-WF-70028-Y01N_IPS Y01N WF 1 1 OF 1 C1 J 2 TF 6 2420C 6 12/5/2019

6"-WF-70028-Y01N_IPS Y01N WF 1 1 OF 1 C1 J 3 TF 6 2420C 6 12/5/2019

6"-WF-70028-Y01N_IPS Y01N WF 1 1 OF 1 C1 J 4 TF 6 2420C 6 12/5/2019


1
6"-WF-70028-Y01N_IPS Y01N WF 1 1 OF 1 C1 J 5 TF 6 2420C 6 12/5/2019

6"-WF-70028-Y01N_IPS Y01N WF 1 1 OF 1 C1 J 6 TF 6 2420C 6 12/5/2019

6"-WF-70028-Y01N_IPS Y01N WF 1 1 OF 1 C1 J 7 TF 6 2420C 6 12/5/2019

6"-WF-70028-Y01N_IPS Y01N WF 1 1 OF 1 C1 J 8 TF 6 2420C 6 12/5/2019

6"-WF-71029-Y01N_IPS Y01N WF 1 1 OF 1 C1 J 1 TF 6 2420C 6 4/12/2019

6"-WF-71029-Y01N_IPS Y01N WF 1 1 OF 1 C1 J 2 TF 6 2420C 6 4/12/2019

6"-WF-71029-Y01N_IPS Y01N WF 1 1 OF 1 C1 J 3 TF 6 2420C 6 5/12/19

Page 67 of 225
PROJECT : MDC OIL GAS (SK320) LTD MUBADALA PETROLEUM TOPSIDES CPP (PEGAGA PROJECT)
TOTAL SPOOL 9 TOTAL DIA INCH
CLIENT : MUBADALA PETROLEUM FABRICATE 4 FAB DIA INCH
JOB NO. : TBA INSTALL 0 INSTALL DIA INCH
TOTAL JOINT 50 FAB JOINT

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH RFI NO.
6"-WF-71029-Y01N_IPS Y01N WF 1 1 OF 1 C1 J 4 TF 6 2420C 6 4/12/2019
1
6"-WF-71029-Y01N_IPS Y01N WF 1 1 OF 1 C1 J 5 TF 6 2420C 6 5/12/2019

6"-WF-71029-Y01N_IPS Y01N WF 1 1 OF 1 C1 J 6 TF 6 2420C 6 4/12/2019

6"-WF-71029-Y01N_IPS Y01N WF 1 1 OF 1 C1 J 7 TF 6 2420C 6 5/12/19

6"-WF-71029-Y01N_IPS Y01N WF 1 1 OF 1 C1 J 8 TF 6 2420C 6 5/12/19

6"-WW-66016-Y01N_IPS Y01N WW 1 1 OF 1 C1 J 1 TF 6 2420C 6 12/7/2019

6"-WW-66016-Y01N_IPS Y01N WW 1 1 OF 1 C1 J 2 TF 6 2420C 6 12/7/2019


1 1
6"-WW-66016-Y01N_IPS Y01N WW 1 1 OF 1 C1 J 3 TF 6 2420C 6 12/7/2019

6"-WW-66016-Y01N_IPS Y01N WW 1 1 OF 1 C1 J 4 TF 6 2420C 6 12/7/2019

6"-WW-66015-Y01N_IPS Y01N WW 1 1 OF 1 C1 J 1 TF 6 2420C 6 12/7/2019

6"-WW-66015-Y01N_IPS Y01N WW 1 1 OF 1 C1 J 2 TF 6 2420C 6 12/7/2019


1 1
6"-WW-66015-Y01N_IPS Y01N WW 1 1 OF 1 C1 J 3 TF 6 2420C 6 12/7/2019

6"-WW-66015-Y01N_IPS Y01N WW 1 1 OF 1 C1 J 4 TF 6 2420C 6 12/7/2019

6"-WW-66016-Y01N_IPS Y01N WU 1 1 OF 1 C1 J 1 TF 2 2420C 2 12/12/2019

6"-WW-66016-Y01N_IPS Y01N WU 1 1 OF 1 C1 J 2 TF 2 2420C 2 12/12/2019


1 1
6"-WW-66016-Y01N_IPS Y01N WU 1 1 OF 1 C1 J 3 TF 2 2420C 2 12/12/2019

6"-WW-66016-Y01N_IPS Y01N WU 1 1 OF 1 C1 J 4 TF 2 2420C 2 12/12/2019

6"-WW-66015-Y01N_IPS Y01N WU 1 1 OF 1 C1 J 1 TF 2 2420C 2 12/21/2019

6"-WW-66017-Y01N_IPS Y01N WU 1 1 OF 1 C1 J 2 TF 2 2420C 2 12/21/2019

6"-WW-66017-Y01N_IPS Y01N WU 1 1 OF 1 C1 J 3 TF 2 2420C 2 12/21/2019


1 1
6"-WW-66017-Y01N_IPS Y01N WU 1 1 OF 1 C1 J 4 TF 2 2420C 2 12/21/2019

6"-WW-66017-Y01N_IPS Y01N WU 1 1 OF 1 C1 J 5 TF 2 2420C 2 12/21/2019

6"-WW-66017-Y01N_IPS Y01N WU 1 1 OF 1 C1 J 6 TF 2 2420C 2 12/21/2019


PROJECT : MDC OIL GAS (SK320) LTD MUBADALA PETROLEUM TOPSIDES CPP (PEGAGA PROJECT)
TOTAL SPOOL 9 TOTAL DIA INCH
CLIENT : MUBADALA PETROLEUM FABRICATE 4 FAB DIA INCH
JOB NO. : TBA INSTALL 0 INSTALL DIA INCH
TOTAL JOINT 50 FAB JOINT

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH RFI NO.

Page 69 of 225
PROJECT : MDC OIL GAS (SK320) LTD MUBADALA PETROLEUM TOPSIDES CPP (PEGAGA PROJECT)
TOTAL SPOOL 9 TOTAL DIA INCH
CLIENT : MUBADALA PETROLEUM FABRICATE 4 FAB DIA INCH
JOB NO. : TBA INSTALL 0 INSTALL DIA INCH
TOTAL JOINT 50 FAB JOINT

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH RFI NO.
PROJECT : MDC OIL GAS (SK320) LTD MUBADALA PETROLEUM TOPSIDES CPP (PEGAGA PROJECT)
TOTAL SPOOL 9 TOTAL DIA INCH
CLIENT : MUBADALA PETROLEUM FABRICATE 4 FAB DIA INCH
JOB NO. : TBA INSTALL 0 INSTALL DIA INCH
TOTAL JOINT 50 FAB JOINT

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH RFI NO.

Page 71 of 225
PROJECT : MDC OIL GAS (SK320) LTD MUBADALA PETROLEUM TOPSIDES CPP (PEGAGA PROJECT)
TOTAL SPOOL 9 TOTAL DIA INCH
CLIENT : MUBADALA PETROLEUM FABRICATE 4 FAB DIA INCH
JOB NO. : TBA INSTALL 0 INSTALL DIA INCH
TOTAL JOINT 50 FAB JOINT

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH RFI NO.
PROJECT : MDC OIL GAS (SK320) LTD MUBADALA PETROLEUM TOPSIDES CPP (PEGAGA PROJECT)
TOTAL SPOOL 9 TOTAL DIA INCH
CLIENT : MUBADALA PETROLEUM FABRICATE 4 FAB DIA INCH
JOB NO. : TBA INSTALL 0 INSTALL DIA INCH
TOTAL JOINT 50 FAB JOINT

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH RFI NO.

Page 73 of 225
PROJECT : MDC OIL GAS (SK320) LTD MUBADALA PETROLEUM TOPSIDES CPP (PEGAGA PROJECT)
TOTAL SPOOL 9 TOTAL DIA INCH
CLIENT : MUBADALA PETROLEUM FABRICATE 4 FAB DIA INCH
JOB NO. : TBA INSTALL 0 INSTALL DIA INCH
TOTAL JOINT 50 FAB JOINT

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH RFI NO.
PROJECT : MDC OIL GAS (SK320) LTD MUBADALA PETROLEUM TOPSIDES CPP (PEGAGA PROJECT)
TOTAL SPOOL 9 TOTAL DIA INCH
CLIENT : MUBADALA PETROLEUM FABRICATE 4 FAB DIA INCH
JOB NO. : TBA INSTALL 0 INSTALL DIA INCH
TOTAL JOINT 50 FAB JOINT

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH RFI NO.

Page 75 of 225
PROJECT : MDC OIL GAS (SK320) LTD MUBADALA PETROLEUM TOPSIDES CPP (PEGAGA PROJECT)
TOTAL SPOOL 9 TOTAL DIA INCH
CLIENT : MUBADALA PETROLEUM FABRICATE 4 FAB DIA INCH
JOB NO. : TBA INSTALL 0 INSTALL DIA INCH
TOTAL JOINT 50 FAB JOINT

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH RFI NO.
PROJECT : MDC OIL GAS (SK320) LTD MUBADALA PETROLEUM TOPSIDES CPP (PEGAGA PROJECT)
TOTAL SPOOL 9 TOTAL DIA INCH
CLIENT : MUBADALA PETROLEUM FABRICATE 4 FAB DIA INCH
JOB NO. : TBA INSTALL 0 INSTALL DIA INCH
TOTAL JOINT 50 FAB JOINT

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH RFI NO.

Page 77 of 225
PROJECT : MDC OIL GAS (SK320) LTD MUBADALA PETROLEUM TOPSIDES CPP (PEGAGA PROJECT)
TOTAL SPOOL 9 TOTAL DIA INCH
CLIENT : MUBADALA PETROLEUM FABRICATE 4 FAB DIA INCH
JOB NO. : TBA INSTALL 0 INSTALL DIA INCH
TOTAL JOINT 50 FAB JOINT

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH RFI NO.
PROJECT : MDC OIL GAS (SK320) LTD MUBADALA PETROLEUM TOPSIDES CPP (PEGAGA PROJECT)
TOTAL SPOOL 9 TOTAL DIA INCH
CLIENT : MUBADALA PETROLEUM FABRICATE 4 FAB DIA INCH
JOB NO. : TBA INSTALL 0 INSTALL DIA INCH
TOTAL JOINT 50 FAB JOINT

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH RFI NO.

Page 79 of 225
PROJECT : MDC OIL GAS (SK320) LTD MUBADALA PETROLEUM TOPSIDES CPP (PEGAGA PROJECT)
TOTAL SPOOL 9 TOTAL DIA INCH
CLIENT : MUBADALA PETROLEUM FABRICATE 4 FAB DIA INCH
JOB NO. : TBA INSTALL 0 INSTALL DIA INCH
TOTAL JOINT 50 FAB JOINT

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH RFI NO.
PROJECT : MDC OIL GAS (SK320) LTD MUBADALA PETROLEUM TOPSIDES CPP (PEGAGA PROJECT)
TOTAL SPOOL 9 TOTAL DIA INCH
CLIENT : MUBADALA PETROLEUM FABRICATE 4 FAB DIA INCH
JOB NO. : TBA INSTALL 0 INSTALL DIA INCH
TOTAL JOINT 50 FAB JOINT

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH RFI NO.

Page 81 of 225
PROJECT : MDC OIL GAS (SK320) LTD MUBADALA PETROLEUM TOPSIDES CPP (PEGAGA PROJECT)
TOTAL SPOOL 9 TOTAL DIA INCH
CLIENT : MUBADALA PETROLEUM FABRICATE 4 FAB DIA INCH
JOB NO. : TBA INSTALL 0 INSTALL DIA INCH
TOTAL JOINT 50 FAB JOINT

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH RFI NO.
PROJECT : MDC OIL GAS (SK320) LTD MUBADALA PETROLEUM TOPSIDES CPP (PEGAGA PROJECT)
TOTAL SPOOL 9 TOTAL DIA INCH
CLIENT : MUBADALA PETROLEUM FABRICATE 4 FAB DIA INCH
JOB NO. : TBA INSTALL 0 INSTALL DIA INCH
TOTAL JOINT 50 FAB JOINT

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH RFI NO.

Page 83 of 225
PROJECT : MDC OIL GAS (SK320) LTD MUBADALA PETROLEUM TOPSIDES CPP (PEGAGA PROJECT)
TOTAL SPOOL 9 TOTAL DIA INCH
CLIENT : MUBADALA PETROLEUM FABRICATE 4 FAB DIA INCH
JOB NO. : TBA INSTALL 0 INSTALL DIA INCH
TOTAL JOINT 50 FAB JOINT

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH RFI NO.
PROJECT : MDC OIL GAS (SK320) LTD MUBADALA PETROLEUM TOPSIDES CPP (PEGAGA PROJECT)
TOTAL SPOOL 9 TOTAL DIA INCH
CLIENT : MUBADALA PETROLEUM FABRICATE 4 FAB DIA INCH
JOB NO. : TBA INSTALL 0 INSTALL DIA INCH
TOTAL JOINT 50 FAB JOINT

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH RFI NO.

Page 85 of 225
PROJECT : MDC OIL GAS (SK320) LTD MUBADALA PETROLEUM TOPSIDES CPP (PEGAGA PROJECT)
TOTAL SPOOL 9 TOTAL DIA INCH
CLIENT : MUBADALA PETROLEUM FABRICATE 4 FAB DIA INCH
JOB NO. : TBA INSTALL 0 INSTALL DIA INCH
TOTAL JOINT 50 FAB JOINT

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH RFI NO.
PROJECT : MDC OIL GAS (SK320) LTD MUBADALA PETROLEUM TOPSIDES CPP (PEGAGA PROJECT)
TOTAL SPOOL 9 TOTAL DIA INCH
CLIENT : MUBADALA PETROLEUM FABRICATE 4 FAB DIA INCH
JOB NO. : TBA INSTALL 0 INSTALL DIA INCH
TOTAL JOINT 50 FAB JOINT

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH RFI NO.

Page 87 of 225
PROJECT : MDC OIL GAS (SK320) LTD MUBADALA PETROLEUM TOPSIDES CPP (PEGAGA PROJECT)
TOTAL SPOOL 9 TOTAL DIA INCH
CLIENT : MUBADALA PETROLEUM FABRICATE 4 FAB DIA INCH
JOB NO. : TBA INSTALL 0 INSTALL DIA INCH
TOTAL JOINT 50 FAB JOINT

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH RFI NO.
PROJECT : MDC OIL GAS (SK320) LTD MUBADALA PETROLEUM TOPSIDES CPP (PEGAGA PROJECT)
TOTAL SPOOL 9 TOTAL DIA INCH
CLIENT : MUBADALA PETROLEUM FABRICATE 4 FAB DIA INCH
JOB NO. : TBA INSTALL 0 INSTALL DIA INCH
TOTAL JOINT 50 FAB JOINT

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH RFI NO.

Page 89 of 225
PROJECT : MDC OIL GAS (SK320) LTD MUBADALA PETROLEUM TOPSIDES CPP (PEGAGA PROJECT)
TOTAL SPOOL 9 TOTAL DIA INCH
CLIENT : MUBADALA PETROLEUM FABRICATE 4 FAB DIA INCH
JOB NO. : TBA INSTALL 0 INSTALL DIA INCH
TOTAL JOINT 50 FAB JOINT

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH RFI NO.
PROJECT : MDC OIL GAS (SK320) LTD MUBADALA PETROLEUM TOPSIDES CPP (PEGAGA PROJECT)
TOTAL SPOOL 9 TOTAL DIA INCH
CLIENT : MUBADALA PETROLEUM FABRICATE 4 FAB DIA INCH
JOB NO. : TBA INSTALL 0 INSTALL DIA INCH
TOTAL JOINT 50 FAB JOINT

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH RFI NO.

Page 91 of 225
PROJECT : MDC OIL GAS (SK320) LTD MUBADALA PETROLEUM TOPSIDES CPP (PEGAGA PROJECT)
TOTAL SPOOL 9 TOTAL DIA INCH
CLIENT : MUBADALA PETROLEUM FABRICATE 4 FAB DIA INCH
JOB NO. : TBA INSTALL 0 INSTALL DIA INCH
TOTAL JOINT 50 FAB JOINT

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH RFI NO.
PROJECT : MDC OIL GAS (SK320) LTD MUBADALA PETROLEUM TOPSIDES CPP (PEGAGA PROJECT)
TOTAL SPOOL 9 TOTAL DIA INCH
CLIENT : MUBADALA PETROLEUM FABRICATE 4 FAB DIA INCH
JOB NO. : TBA INSTALL 0 INSTALL DIA INCH
TOTAL JOINT 50 FAB JOINT

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH RFI NO.

Page 93 of 225
PROJECT : MDC OIL GAS (SK320) LTD MUBADALA PETROLEUM TOPSIDES CPP (PEGAGA PROJECT)
TOTAL SPOOL 9 TOTAL DIA INCH
CLIENT : MUBADALA PETROLEUM FABRICATE 4 FAB DIA INCH
JOB NO. : TBA INSTALL 0 INSTALL DIA INCH
TOTAL JOINT 50 FAB JOINT

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH RFI NO.
PROJECT : MDC OIL GAS (SK320) LTD MUBADALA PETROLEUM TOPSIDES CPP (PEGAGA PROJECT)
TOTAL SPOOL 9 TOTAL DIA INCH
CLIENT : MUBADALA PETROLEUM FABRICATE 4 FAB DIA INCH
JOB NO. : TBA INSTALL 0 INSTALL DIA INCH
TOTAL JOINT 50 FAB JOINT

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH RFI NO.

Page 95 of 225
PROJECT : MDC OIL GAS (SK320) LTD MUBADALA PETROLEUM TOPSIDES CPP (PEGAGA PROJECT)
TOTAL SPOOL 9 TOTAL DIA INCH
CLIENT : MUBADALA PETROLEUM FABRICATE 4 FAB DIA INCH
JOB NO. : TBA INSTALL 0 INSTALL DIA INCH
TOTAL JOINT 50 FAB JOINT

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH RFI NO.
PROJECT : MDC OIL GAS (SK320) LTD MUBADALA PETROLEUM TOPSIDES CPP (PEGAGA PROJECT)
TOTAL SPOOL 9 TOTAL DIA INCH
CLIENT : MUBADALA PETROLEUM FABRICATE 4 FAB DIA INCH
JOB NO. : TBA INSTALL 0 INSTALL DIA INCH
TOTAL JOINT 50 FAB JOINT

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH RFI NO.

Page 97 of 225
PROJECT : MDC OIL GAS (SK320) LTD MUBADALA PETROLEUM TOPSIDES CPP (PEGAGA PROJECT)
TOTAL SPOOL 9 TOTAL DIA INCH
CLIENT : MUBADALA PETROLEUM FABRICATE 4 FAB DIA INCH
JOB NO. : TBA INSTALL 0 INSTALL DIA INCH
TOTAL JOINT 50 FAB JOINT

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH RFI NO.
PROJECT : MDC OIL GAS (SK320) LTD MUBADALA PETROLEUM TOPSIDES CPP (PEGAGA PROJECT)
TOTAL SPOOL 9 TOTAL DIA INCH
CLIENT : MUBADALA PETROLEUM FABRICATE 4 FAB DIA INCH
JOB NO. : TBA INSTALL 0 INSTALL DIA INCH
TOTAL JOINT 50 FAB JOINT

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH RFI NO.

Page 99 of 225
PROJECT : MDC OIL GAS (SK320) LTD MUBADALA PETROLEUM TOPSIDES CPP (PEGAGA PROJECT)
TOTAL SPOOL 9 TOTAL DIA INCH
CLIENT : MUBADALA PETROLEUM FABRICATE 4 FAB DIA INCH
JOB NO. : TBA INSTALL 0 INSTALL DIA INCH
TOTAL JOINT 50 FAB JOINT

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH RFI NO.
PROJECT : MDC OIL GAS (SK320) LTD MUBADALA PETROLEUM TOPSIDES CPP (PEGAGA PROJECT)
TOTAL SPOOL 9 TOTAL DIA INCH
CLIENT : MUBADALA PETROLEUM FABRICATE 4 FAB DIA INCH
JOB NO. : TBA INSTALL 0 INSTALL DIA INCH
TOTAL JOINT 50 FAB JOINT

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH RFI NO.

Page 101 of 225


PROJECT : MDC OIL GAS (SK320) LTD MUBADALA PETROLEUM TOPSIDES CPP (PEGAGA PROJECT)
TOTAL SPOOL 9 TOTAL DIA INCH
CLIENT : MUBADALA PETROLEUM FABRICATE 4 FAB DIA INCH
JOB NO. : TBA INSTALL 0 INSTALL DIA INCH
TOTAL JOINT 50 FAB JOINT

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH RFI NO.
PROJECT : MDC OIL GAS (SK320) LTD MUBADALA PETROLEUM TOPSIDES CPP (PEGAGA PROJECT)
TOTAL SPOOL 9 TOTAL DIA INCH
CLIENT : MUBADALA PETROLEUM FABRICATE 4 FAB DIA INCH
JOB NO. : TBA INSTALL 0 INSTALL DIA INCH
TOTAL JOINT 50 FAB JOINT

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH RFI NO.

Page 103 of 225


PROJECT : MDC OIL GAS (SK320) LTD MUBADALA PETROLEUM TOPSIDES CPP (PEGAGA PROJECT)
TOTAL SPOOL 9 TOTAL DIA INCH
CLIENT : MUBADALA PETROLEUM FABRICATE 4 FAB DIA INCH
JOB NO. : TBA INSTALL 0 INSTALL DIA INCH
TOTAL JOINT 50 FAB JOINT

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH RFI NO.
PROJECT : MDC OIL GAS (SK320) LTD MUBADALA PETROLEUM TOPSIDES CPP (PEGAGA PROJECT)
TOTAL SPOOL 9 TOTAL DIA INCH
CLIENT : MUBADALA PETROLEUM FABRICATE 4 FAB DIA INCH
JOB NO. : TBA INSTALL 0 INSTALL DIA INCH
TOTAL JOINT 50 FAB JOINT

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH RFI NO.

Page 105 of 225


PROJECT : MDC OIL GAS (SK320) LTD MUBADALA PETROLEUM TOPSIDES CPP (PEGAGA PROJECT)
TOTAL SPOOL 9 TOTAL DIA INCH
CLIENT : MUBADALA PETROLEUM FABRICATE 4 FAB DIA INCH
JOB NO. : TBA INSTALL 0 INSTALL DIA INCH
TOTAL JOINT 50 FAB JOINT

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH RFI NO.
PROJECT : MDC OIL GAS (SK320) LTD MUBADALA PETROLEUM TOPSIDES CPP (PEGAGA PROJECT)
TOTAL SPOOL 9 TOTAL DIA INCH
CLIENT : MUBADALA PETROLEUM FABRICATE 4 FAB DIA INCH
JOB NO. : TBA INSTALL 0 INSTALL DIA INCH
TOTAL JOINT 50 FAB JOINT

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH RFI NO.

Page 107 of 225


PROJECT : MDC OIL GAS (SK320) LTD MUBADALA PETROLEUM TOPSIDES CPP (PEGAGA PROJECT)
TOTAL SPOOL 9 TOTAL DIA INCH
CLIENT : MUBADALA PETROLEUM FABRICATE 4 FAB DIA INCH
JOB NO. : TBA INSTALL 0 INSTALL DIA INCH
TOTAL JOINT 50 FAB JOINT

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH RFI NO.
PROJECT : MDC OIL GAS (SK320) LTD MUBADALA PETROLEUM TOPSIDES CPP (PEGAGA PROJECT)
TOTAL SPOOL 9 TOTAL DIA INCH
CLIENT : MUBADALA PETROLEUM FABRICATE 4 FAB DIA INCH
JOB NO. : TBA INSTALL 0 INSTALL DIA INCH
TOTAL JOINT 50 FAB JOINT

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH RFI NO.

Page 109 of 225


PROJECT : MDC OIL GAS (SK320) LTD MUBADALA PETROLEUM TOPSIDES CPP (PEGAGA PROJECT)
TOTAL SPOOL 9 TOTAL DIA INCH
CLIENT : MUBADALA PETROLEUM FABRICATE 4 FAB DIA INCH
JOB NO. : TBA INSTALL 0 INSTALL DIA INCH
TOTAL JOINT 50 FAB JOINT

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH RFI NO.
PROJECT : MDC OIL GAS (SK320) LTD MUBADALA PETROLEUM TOPSIDES CPP (PEGAGA PROJECT)
TOTAL SPOOL 9 TOTAL DIA INCH
CLIENT : MUBADALA PETROLEUM FABRICATE 4 FAB DIA INCH
JOB NO. : TBA INSTALL 0 INSTALL DIA INCH
TOTAL JOINT 50 FAB JOINT

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH RFI NO.

Page 111 of 225


PROJECT : MDC OIL GAS (SK320) LTD MUBADALA PETROLEUM TOPSIDES CPP (PEGAGA PROJECT)
TOTAL SPOOL 9 TOTAL DIA INCH
CLIENT : MUBADALA PETROLEUM FABRICATE 4 FAB DIA INCH
JOB NO. : TBA INSTALL 0 INSTALL DIA INCH
TOTAL JOINT 50 FAB JOINT

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH RFI NO.
PROJECT : MDC OIL GAS (SK320) LTD MUBADALA PETROLEUM TOPSIDES CPP (PEGAGA PROJECT)
TOTAL SPOOL 9 TOTAL DIA INCH
CLIENT : MUBADALA PETROLEUM FABRICATE 4 FAB DIA INCH
JOB NO. : TBA INSTALL 0 INSTALL DIA INCH
TOTAL JOINT 50 FAB JOINT

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH RFI NO.

Page 113 of 225


PROJECT : MDC OIL GAS (SK320) LTD MUBADALA PETROLEUM TOPSIDES CPP (PEGAGA PROJECT)
TOTAL SPOOL 9 TOTAL DIA INCH
CLIENT : MUBADALA PETROLEUM FABRICATE 4 FAB DIA INCH
JOB NO. : TBA INSTALL 0 INSTALL DIA INCH
TOTAL JOINT 50 FAB JOINT

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH RFI NO.
PROJECT : MDC OIL GAS (SK320) LTD MUBADALA PETROLEUM TOPSIDES CPP (PEGAGA PROJECT)
TOTAL SPOOL 9 TOTAL DIA INCH
CLIENT : MUBADALA PETROLEUM FABRICATE 4 FAB DIA INCH
JOB NO. : TBA INSTALL 0 INSTALL DIA INCH
TOTAL JOINT 50 FAB JOINT

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH RFI NO.

Page 115 of 225


PROJECT : MDC OIL GAS (SK320) LTD MUBADALA PETROLEUM TOPSIDES CPP (PEGAGA PROJECT)
TOTAL SPOOL 9 TOTAL DIA INCH
CLIENT : MUBADALA PETROLEUM FABRICATE 4 FAB DIA INCH
JOB NO. : TBA INSTALL 0 INSTALL DIA INCH
TOTAL JOINT 50 FAB JOINT

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH RFI NO.
PROJECT : MDC OIL GAS (SK320) LTD MUBADALA PETROLEUM TOPSIDES CPP (PEGAGA PROJECT)
TOTAL SPOOL 9 TOTAL DIA INCH
CLIENT : MUBADALA PETROLEUM FABRICATE 4 FAB DIA INCH
JOB NO. : TBA INSTALL 0 INSTALL DIA INCH
TOTAL JOINT 50 FAB JOINT

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH RFI NO.

Page 117 of 225


PROJECT : MDC OIL GAS (SK320) LTD MUBADALA PETROLEUM TOPSIDES CPP (PEGAGA PROJECT)
TOTAL SPOOL 9 TOTAL DIA INCH
CLIENT : MUBADALA PETROLEUM FABRICATE 4 FAB DIA INCH
JOB NO. : TBA INSTALL 0 INSTALL DIA INCH
TOTAL JOINT 50 FAB JOINT

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH RFI NO.
PROJECT : MDC OIL GAS (SK320) LTD MUBADALA PETROLEUM TOPSIDES CPP (PEGAGA PROJECT)
TOTAL SPOOL 9 TOTAL DIA INCH
CLIENT : MUBADALA PETROLEUM FABRICATE 4 FAB DIA INCH
JOB NO. : TBA INSTALL 0 INSTALL DIA INCH
TOTAL JOINT 50 FAB JOINT

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH RFI NO.

Page 119 of 225


PROJECT : MDC OIL GAS (SK320) LTD MUBADALA PETROLEUM TOPSIDES CPP (PEGAGA PROJECT)
TOTAL SPOOL 9 TOTAL DIA INCH
CLIENT : MUBADALA PETROLEUM FABRICATE 4 FAB DIA INCH
JOB NO. : TBA INSTALL 0 INSTALL DIA INCH
TOTAL JOINT 50 FAB JOINT

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH RFI NO.
PROJECT : MDC OIL GAS (SK320) LTD MUBADALA PETROLEUM TOPSIDES CPP (PEGAGA PROJECT)
TOTAL SPOOL 9 TOTAL DIA INCH
CLIENT : MUBADALA PETROLEUM FABRICATE 4 FAB DIA INCH
JOB NO. : TBA INSTALL 0 INSTALL DIA INCH
TOTAL JOINT 50 FAB JOINT

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH RFI NO.

Page 121 of 225


PROJECT : MDC OIL GAS (SK320) LTD MUBADALA PETROLEUM TOPSIDES CPP (PEGAGA PROJECT)
TOTAL SPOOL 9 TOTAL DIA INCH
CLIENT : MUBADALA PETROLEUM FABRICATE 4 FAB DIA INCH
JOB NO. : TBA INSTALL 0 INSTALL DIA INCH
TOTAL JOINT 50 FAB JOINT

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH RFI NO.
PROJECT : MDC OIL GAS (SK320) LTD MUBADALA PETROLEUM TOPSIDES CPP (PEGAGA PROJECT)
TOTAL SPOOL 9 TOTAL DIA INCH
CLIENT : MUBADALA PETROLEUM FABRICATE 4 FAB DIA INCH
JOB NO. : TBA INSTALL 0 INSTALL DIA INCH
TOTAL JOINT 50 FAB JOINT

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH RFI NO.

Page 123 of 225


PROJECT : MDC OIL GAS (SK320) LTD MUBADALA PETROLEUM TOPSIDES CPP (PEGAGA PROJECT)
TOTAL SPOOL 9 TOTAL DIA INCH
CLIENT : MUBADALA PETROLEUM FABRICATE 4 FAB DIA INCH
JOB NO. : TBA INSTALL 0 INSTALL DIA INCH
TOTAL JOINT 50 FAB JOINT

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH RFI NO.
PROJECT : MDC OIL GAS (SK320) LTD MUBADALA PETROLEUM TOPSIDES CPP (PEGAGA PROJECT)
TOTAL SPOOL 9 TOTAL DIA INCH
CLIENT : MUBADALA PETROLEUM FABRICATE 4 FAB DIA INCH
JOB NO. : TBA INSTALL 0 INSTALL DIA INCH
TOTAL JOINT 50 FAB JOINT

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH RFI NO.

Page 125 of 225


PROJECT : MDC OIL GAS (SK320) LTD MUBADALA PETROLEUM TOPSIDES CPP (PEGAGA PROJECT)
TOTAL SPOOL 9 TOTAL DIA INCH
CLIENT : MUBADALA PETROLEUM FABRICATE 4 FAB DIA INCH
JOB NO. : TBA INSTALL 0 INSTALL DIA INCH
TOTAL JOINT 50 FAB JOINT

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH RFI NO.
PROJECT : MDC OIL GAS (SK320) LTD MUBADALA PETROLEUM TOPSIDES CPP (PEGAGA PROJECT)
TOTAL SPOOL 9 TOTAL DIA INCH
CLIENT : MUBADALA PETROLEUM FABRICATE 4 FAB DIA INCH
JOB NO. : TBA INSTALL 0 INSTALL DIA INCH
TOTAL JOINT 50 FAB JOINT

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH RFI NO.

Page 127 of 225


PROJECT : MDC OIL GAS (SK320) LTD MUBADALA PETROLEUM TOPSIDES CPP (PEGAGA PROJECT)
TOTAL SPOOL 9 TOTAL DIA INCH
CLIENT : MUBADALA PETROLEUM FABRICATE 4 FAB DIA INCH
JOB NO. : TBA INSTALL 0 INSTALL DIA INCH
TOTAL JOINT 50 FAB JOINT

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH RFI NO.
PROJECT : MDC OIL GAS (SK320) LTD MUBADALA PETROLEUM TOPSIDES CPP (PEGAGA PROJECT)
TOTAL SPOOL 9 TOTAL DIA INCH
CLIENT : MUBADALA PETROLEUM FABRICATE 4 FAB DIA INCH
JOB NO. : TBA INSTALL 0 INSTALL DIA INCH
TOTAL JOINT 50 FAB JOINT

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH RFI NO.

Page 129 of 225


PROJECT : MDC OIL GAS (SK320) LTD MUBADALA PETROLEUM TOPSIDES CPP (PEGAGA PROJECT)
TOTAL SPOOL 9 TOTAL DIA INCH
CLIENT : MUBADALA PETROLEUM FABRICATE 4 FAB DIA INCH
JOB NO. : TBA INSTALL 0 INSTALL DIA INCH
TOTAL JOINT 50 FAB JOINT

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH RFI NO.
PROJECT : MDC OIL GAS (SK320) LTD MUBADALA PETROLEUM TOPSIDES CPP (PEGAGA PROJECT)
TOTAL SPOOL 9 TOTAL DIA INCH
CLIENT : MUBADALA PETROLEUM FABRICATE 4 FAB DIA INCH
JOB NO. : TBA INSTALL 0 INSTALL DIA INCH
TOTAL JOINT 50 FAB JOINT

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH RFI NO.

Page 131 of 225


PROJECT : MDC OIL GAS (SK320) LTD MUBADALA PETROLEUM TOPSIDES CPP (PEGAGA PROJECT)
TOTAL SPOOL 9 TOTAL DIA INCH
CLIENT : MUBADALA PETROLEUM FABRICATE 4 FAB DIA INCH
JOB NO. : TBA INSTALL 0 INSTALL DIA INCH
TOTAL JOINT 50 FAB JOINT

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH RFI NO.
PROJECT : MDC OIL GAS (SK320) LTD MUBADALA PETROLEUM TOPSIDES CPP (PEGAGA PROJECT)
TOTAL SPOOL 9 TOTAL DIA INCH
CLIENT : MUBADALA PETROLEUM FABRICATE 4 FAB DIA INCH
JOB NO. : TBA INSTALL 0 INSTALL DIA INCH
TOTAL JOINT 50 FAB JOINT

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH RFI NO.

Page 133 of 225


PROJECT : MDC OIL GAS (SK320) LTD MUBADALA PETROLEUM TOPSIDES CPP (PEGAGA PROJECT)
TOTAL SPOOL 9 TOTAL DIA INCH
CLIENT : MUBADALA PETROLEUM FABRICATE 4 FAB DIA INCH
JOB NO. : TBA INSTALL 0 INSTALL DIA INCH
TOTAL JOINT 50 FAB JOINT

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH RFI NO.
PROJECT : MDC OIL GAS (SK320) LTD MUBADALA PETROLEUM TOPSIDES CPP (PEGAGA PROJECT)
TOTAL SPOOL 9 TOTAL DIA INCH
CLIENT : MUBADALA PETROLEUM FABRICATE 4 FAB DIA INCH
JOB NO. : TBA INSTALL 0 INSTALL DIA INCH
TOTAL JOINT 50 FAB JOINT

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH RFI NO.

Page 135 of 225


PROJECT : MDC OIL GAS (SK320) LTD MUBADALA PETROLEUM TOPSIDES CPP (PEGAGA PROJECT)
TOTAL SPOOL 9 TOTAL DIA INCH
CLIENT : MUBADALA PETROLEUM FABRICATE 4 FAB DIA INCH
JOB NO. : TBA INSTALL 0 INSTALL DIA INCH
TOTAL JOINT 50 FAB JOINT

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH RFI NO.
PROJECT : MDC OIL GAS (SK320) LTD MUBADALA PETROLEUM TOPSIDES CPP (PEGAGA PROJECT)
TOTAL SPOOL 9 TOTAL DIA INCH
CLIENT : MUBADALA PETROLEUM FABRICATE 4 FAB DIA INCH
JOB NO. : TBA INSTALL 0 INSTALL DIA INCH
TOTAL JOINT 50 FAB JOINT

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH RFI NO.

Page 137 of 225


PROJECT : MDC OIL GAS (SK320) LTD MUBADALA PETROLEUM TOPSIDES CPP (PEGAGA PROJECT)
TOTAL SPOOL 9 TOTAL DIA INCH
CLIENT : MUBADALA PETROLEUM FABRICATE 4 FAB DIA INCH
JOB NO. : TBA INSTALL 0 INSTALL DIA INCH
TOTAL JOINT 50 FAB JOINT

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH RFI NO.
PROJECT : MDC OIL GAS (SK320) LTD MUBADALA PETROLEUM TOPSIDES CPP (PEGAGA PROJECT)
TOTAL SPOOL 9 TOTAL DIA INCH
CLIENT : MUBADALA PETROLEUM FABRICATE 4 FAB DIA INCH
JOB NO. : TBA INSTALL 0 INSTALL DIA INCH
TOTAL JOINT 50 FAB JOINT

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH RFI NO.

Page 139 of 225


PROJECT : MDC OIL GAS (SK320) LTD MUBADALA PETROLEUM TOPSIDES CPP (PEGAGA PROJECT)
TOTAL SPOOL 9 TOTAL DIA INCH
CLIENT : MUBADALA PETROLEUM FABRICATE 4 FAB DIA INCH
JOB NO. : TBA INSTALL 0 INSTALL DIA INCH
TOTAL JOINT 50 FAB JOINT

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH RFI NO.
PROJECT : MDC OIL GAS (SK320) LTD MUBADALA PETROLEUM TOPSIDES CPP (PEGAGA PROJECT)
TOTAL SPOOL 9 TOTAL DIA INCH
CLIENT : MUBADALA PETROLEUM FABRICATE 4 FAB DIA INCH
JOB NO. : TBA INSTALL 0 INSTALL DIA INCH
TOTAL JOINT 50 FAB JOINT

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH RFI NO.

Page 141 of 225


PROJECT : MDC OIL GAS (SK320) LTD MUBADALA PETROLEUM TOPSIDES CPP (PEGAGA PROJECT)
TOTAL SPOOL 9 TOTAL DIA INCH
CLIENT : MUBADALA PETROLEUM FABRICATE 4 FAB DIA INCH
JOB NO. : TBA INSTALL 0 INSTALL DIA INCH
TOTAL JOINT 50 FAB JOINT

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH RFI NO.
TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 44 3 16 44 3 16 0 0
TOTAL DIA INCH 208 WU 20 2 10 20 2 10 0 0
FAB DIA INCH 164 WW 48 2 8 48 2 8 0 0
INSTALL DIA INCH 0 WF 96 2 16 96 2 16 0 0
34

VISUAL HYDROTEST
REMARKS
DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE

Page 143 of 225


TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 44 3 16 44 3 16 0 0
TOTAL DIA INCH 208 WU 20 2 10 20 2 10 0 0
FAB DIA INCH 164 WW 48 2 8 48 2 8 0 0
INSTALL DIA INCH 0 WF 96 2 16 96 2 16 0 0
34

VISUAL HYDROTEST
REMARKS
DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE
TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 44 3 16 44 3 16 0 0
TOTAL DIA INCH 208 WU 20 2 10 20 2 10 0 0
FAB DIA INCH 164 WW 48 2 8 48 2 8 0 0
INSTALL DIA INCH 0 WF 96 2 16 96 2 16 0 0
34

VISUAL HYDROTEST
REMARKS
DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE

Page 145 of 225


TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 44 3 16 44 3 16 0 0
TOTAL DIA INCH 208 WU 20 2 10 20 2 10 0 0
FAB DIA INCH 164 WW 48 2 8 48 2 8 0 0
INSTALL DIA INCH 0 WF 96 2 16 96 2 16 0 0
34

VISUAL HYDROTEST
REMARKS
DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE
TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 44 3 16 44 3 16 0 0
TOTAL DIA INCH 208 WU 20 2 10 20 2 10 0 0
FAB DIA INCH 164 WW 48 2 8 48 2 8 0 0
INSTALL DIA INCH 0 WF 96 2 16 96 2 16 0 0
34

VISUAL HYDROTEST
REMARKS
DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE

Page 147 of 225


TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 44 3 16 44 3 16 0 0
TOTAL DIA INCH 208 WU 20 2 10 20 2 10 0 0
FAB DIA INCH 164 WW 48 2 8 48 2 8 0 0
INSTALL DIA INCH 0 WF 96 2 16 96 2 16 0 0
34

VISUAL HYDROTEST
REMARKS
DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE
TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 44 3 16 44 3 16 0 0
TOTAL DIA INCH 208 WU 20 2 10 20 2 10 0 0
FAB DIA INCH 164 WW 48 2 8 48 2 8 0 0
INSTALL DIA INCH 0 WF 96 2 16 96 2 16 0 0
34

VISUAL HYDROTEST
REMARKS
DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE

Page 149 of 225


TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 44 3 16 44 3 16 0 0
TOTAL DIA INCH 208 WU 20 2 10 20 2 10 0 0
FAB DIA INCH 164 WW 48 2 8 48 2 8 0 0
INSTALL DIA INCH 0 WF 96 2 16 96 2 16 0 0
34

VISUAL HYDROTEST
REMARKS
DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE
TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 44 3 16 44 3 16 0 0
TOTAL DIA INCH 208 WU 20 2 10 20 2 10 0 0
FAB DIA INCH 164 WW 48 2 8 48 2 8 0 0
INSTALL DIA INCH 0 WF 96 2 16 96 2 16 0 0
34

VISUAL HYDROTEST
REMARKS
DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE

Page 151 of 225


TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 44 3 16 44 3 16 0 0
TOTAL DIA INCH 208 WU 20 2 10 20 2 10 0 0
FAB DIA INCH 164 WW 48 2 8 48 2 8 0 0
INSTALL DIA INCH 0 WF 96 2 16 96 2 16 0 0
34

VISUAL HYDROTEST
REMARKS
DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE
TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 44 3 16 44 3 16 0 0
TOTAL DIA INCH 208 WU 20 2 10 20 2 10 0 0
FAB DIA INCH 164 WW 48 2 8 48 2 8 0 0
INSTALL DIA INCH 0 WF 96 2 16 96 2 16 0 0
34

VISUAL HYDROTEST
REMARKS
DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE

Page 153 of 225


TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 44 3 16 44 3 16 0 0
TOTAL DIA INCH 208 WU 20 2 10 20 2 10 0 0
FAB DIA INCH 164 WW 48 2 8 48 2 8 0 0
INSTALL DIA INCH 0 WF 96 2 16 96 2 16 0 0
34

VISUAL HYDROTEST
REMARKS
DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE
TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 44 3 16 44 3 16 0 0
TOTAL DIA INCH 208 WU 20 2 10 20 2 10 0 0
FAB DIA INCH 164 WW 48 2 8 48 2 8 0 0
INSTALL DIA INCH 0 WF 96 2 16 96 2 16 0 0
34

VISUAL HYDROTEST
REMARKS
DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE

Page 155 of 225


TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 44 3 16 44 3 16 0 0
TOTAL DIA INCH 208 WU 20 2 10 20 2 10 0 0
FAB DIA INCH 164 WW 48 2 8 48 2 8 0 0
INSTALL DIA INCH 0 WF 96 2 16 96 2 16 0 0
34

VISUAL HYDROTEST
REMARKS
DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE
TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 44 3 16 44 3 16 0 0
TOTAL DIA INCH 208 WU 20 2 10 20 2 10 0 0
FAB DIA INCH 164 WW 48 2 8 48 2 8 0 0
INSTALL DIA INCH 0 WF 96 2 16 96 2 16 0 0
34

VISUAL HYDROTEST
REMARKS
DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE

Page 157 of 225


TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 44 3 16 44 3 16 0 0
TOTAL DIA INCH 208 WU 20 2 10 20 2 10 0 0
FAB DIA INCH 164 WW 48 2 8 48 2 8 0 0
INSTALL DIA INCH 0 WF 96 2 16 96 2 16 0 0
34

VISUAL HYDROTEST
REMARKS
DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE
TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 44 3 16 44 3 16 0 0
TOTAL DIA INCH 208 WU 20 2 10 20 2 10 0 0
FAB DIA INCH 164 WW 48 2 8 48 2 8 0 0
INSTALL DIA INCH 0 WF 96 2 16 96 2 16 0 0
34

VISUAL HYDROTEST
REMARKS
DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE

Page 159 of 225


TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 44 3 16 44 3 16 0 0
TOTAL DIA INCH 208 WU 20 2 10 20 2 10 0 0
FAB DIA INCH 164 WW 48 2 8 48 2 8 0 0
INSTALL DIA INCH 0 WF 96 2 16 96 2 16 0 0
34

VISUAL HYDROTEST
REMARKS
DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE
TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 44 3 16 44 3 16 0 0
TOTAL DIA INCH 208 WU 20 2 10 20 2 10 0 0
FAB DIA INCH 164 WW 48 2 8 48 2 8 0 0
INSTALL DIA INCH 0 WF 96 2 16 96 2 16 0 0
34

VISUAL HYDROTEST
REMARKS
DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE

Page 161 of 225


TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 44 3 16 44 3 16 0 0
TOTAL DIA INCH 208 WU 20 2 10 20 2 10 0 0
FAB DIA INCH 164 WW 48 2 8 48 2 8 0 0
INSTALL DIA INCH 0 WF 96 2 16 96 2 16 0 0
34

VISUAL HYDROTEST
REMARKS
DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE
TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 44 3 16 44 3 16 0 0
TOTAL DIA INCH 208 WU 20 2 10 20 2 10 0 0
FAB DIA INCH 164 WW 48 2 8 48 2 8 0 0
INSTALL DIA INCH 0 WF 96 2 16 96 2 16 0 0
34

VISUAL HYDROTEST
REMARKS
DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE

Page 163 of 225


TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 44 3 16 44 3 16 0 0
TOTAL DIA INCH 208 WU 20 2 10 20 2 10 0 0
FAB DIA INCH 164 WW 48 2 8 48 2 8 0 0
INSTALL DIA INCH 0 WF 96 2 16 96 2 16 0 0
34

VISUAL HYDROTEST
REMARKS
DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE
TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 44 3 16 44 3 16 0 0
TOTAL DIA INCH 208 WU 20 2 10 20 2 10 0 0
FAB DIA INCH 164 WW 48 2 8 48 2 8 0 0
INSTALL DIA INCH 0 WF 96 2 16 96 2 16 0 0
34

VISUAL HYDROTEST
REMARKS
DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE

Page 165 of 225


TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 44 3 16 44 3 16 0 0
TOTAL DIA INCH 208 WU 20 2 10 20 2 10 0 0
FAB DIA INCH 164 WW 48 2 8 48 2 8 0 0
INSTALL DIA INCH 0 WF 96 2 16 96 2 16 0 0
34

VISUAL HYDROTEST
REMARKS
DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE

deleted deleted deleted deleted deleted deleted deleted


TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 44 3 16 44 3 16 0 0
TOTAL DIA INCH 208 WU 20 2 10 20 2 10 0 0
FAB DIA INCH 164 WW 48 2 8 48 2 8 0 0
INSTALL DIA INCH 0 WF 96 2 16 96 2 16 0 0
34

VISUAL HYDROTEST
REMARKS
DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE

Page 167 of 225


TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 44 3 16 44 3 16 0 0
TOTAL DIA INCH 208 WU 20 2 10 20 2 10 0 0
FAB DIA INCH 164 WW 48 2 8 48 2 8 0 0
INSTALL DIA INCH 0 WF 96 2 16 96 2 16 0 0
34

VISUAL HYDROTEST
REMARKS
DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE
TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 44 3 16 44 3 16 0 0
TOTAL DIA INCH 208 WU 20 2 10 20 2 10 0 0
FAB DIA INCH 164 WW 48 2 8 48 2 8 0 0
INSTALL DIA INCH 0 WF 96 2 16 96 2 16 0 0
34

VISUAL HYDROTEST
REMARKS
DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE

Page 169 of 225


TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 44 3 16 44 3 16 0 0
TOTAL DIA INCH 208 WU 20 2 10 20 2 10 0 0
FAB DIA INCH 164 WW 48 2 8 48 2 8 0 0
INSTALL DIA INCH 0 WF 96 2 16 96 2 16 0 0
34

VISUAL HYDROTEST
REMARKS
DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE
TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 44 3 16 44 3 16 0 0
TOTAL DIA INCH 208 WU 20 2 10 20 2 10 0 0
FAB DIA INCH 164 WW 48 2 8 48 2 8 0 0
INSTALL DIA INCH 0 WF 96 2 16 96 2 16 0 0
34

VISUAL HYDROTEST
REMARKS
DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE

Page 171 of 225


TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 44 3 16 44 3 16 0 0
TOTAL DIA INCH 208 WU 20 2 10 20 2 10 0 0
FAB DIA INCH 164 WW 48 2 8 48 2 8 0 0
INSTALL DIA INCH 0 WF 96 2 16 96 2 16 0 0
34

VISUAL HYDROTEST
REMARKS
DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE
TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 44 3 16 44 3 16 0 0
TOTAL DIA INCH 208 WU 20 2 10 20 2 10 0 0
FAB DIA INCH 164 WW 48 2 8 48 2 8 0 0
INSTALL DIA INCH 0 WF 96 2 16 96 2 16 0 0
34

VISUAL HYDROTEST
REMARKS
DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE

2/5/2012 FW-063X 544

Page 173 of 225


TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 44 3 16 44 3 16 0 0
TOTAL DIA INCH 208 WU 20 2 10 20 2 10 0 0
FAB DIA INCH 164 WW 48 2 8 48 2 8 0 0
INSTALL DIA INCH 0 WF 96 2 16 96 2 16 0 0
34

VISUAL HYDROTEST
REMARKS
DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE
TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 44 3 16 44 3 16 0 0
TOTAL DIA INCH 208 WU 20 2 10 20 2 10 0 0
FAB DIA INCH 164 WW 48 2 8 48 2 8 0 0
INSTALL DIA INCH 0 WF 96 2 16 96 2 16 0 0
34

VISUAL HYDROTEST
REMARKS
DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE

Page 175 of 225


TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 44 3 16 44 3 16 0 0
TOTAL DIA INCH 208 WU 20 2 10 20 2 10 0 0
FAB DIA INCH 164 WW 48 2 8 48 2 8 0 0
INSTALL DIA INCH 0 WF 96 2 16 96 2 16 0 0
34

VISUAL HYDROTEST
REMARKS
DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE
TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 44 3 16 44 3 16 0 0
TOTAL DIA INCH 208 WU 20 2 10 20 2 10 0 0
FAB DIA INCH 164 WW 48 2 8 48 2 8 0 0
INSTALL DIA INCH 0 WF 96 2 16 96 2 16 0 0
34

VISUAL HYDROTEST
REMARKS
DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE

Page 177 of 225


TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 44 3 16 44 3 16 0 0
TOTAL DIA INCH 208 WU 20 2 10 20 2 10 0 0
FAB DIA INCH 164 WW 48 2 8 48 2 8 0 0
INSTALL DIA INCH 0 WF 96 2 16 96 2 16 0 0
34

VISUAL HYDROTEST
REMARKS
DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE
TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 44 3 16 44 3 16 0 0
TOTAL DIA INCH 208 WU 20 2 10 20 2 10 0 0
FAB DIA INCH 164 WW 48 2 8 48 2 8 0 0
INSTALL DIA INCH 0 WF 96 2 16 96 2 16 0 0
34

VISUAL HYDROTEST
REMARKS
DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE

Page 179 of 225


TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 44 3 16 44 3 16 0 0
TOTAL DIA INCH 208 WU 20 2 10 20 2 10 0 0
FAB DIA INCH 164 WW 48 2 8 48 2 8 0 0
INSTALL DIA INCH 0 WF 96 2 16 96 2 16 0 0
34

VISUAL HYDROTEST
REMARKS
DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE
TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 44 3 16 44 3 16 0 0
TOTAL DIA INCH 208 WU 20 2 10 20 2 10 0 0
FAB DIA INCH 164 WW 48 2 8 48 2 8 0 0
INSTALL DIA INCH 0 WF 96 2 16 96 2 16 0 0
34

VISUAL HYDROTEST
REMARKS
DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE

Page 181 of 225


TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 44 3 16 44 3 16 0 0
TOTAL DIA INCH 208 WU 20 2 10 20 2 10 0 0
FAB DIA INCH 164 WW 48 2 8 48 2 8 0 0
INSTALL DIA INCH 0 WF 96 2 16 96 2 16 0 0
34

VISUAL HYDROTEST
REMARKS
DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE
TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 44 3 16 44 3 16 0 0
TOTAL DIA INCH 208 WU 20 2 10 20 2 10 0 0
FAB DIA INCH 164 WW 48 2 8 48 2 8 0 0
INSTALL DIA INCH 0 WF 96 2 16 96 2 16 0 0
34

VISUAL HYDROTEST
REMARKS
DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE

Page 183 of 225


TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 44 3 16 44 3 16 0 0
TOTAL DIA INCH 208 WU 20 2 10 20 2 10 0 0
FAB DIA INCH 164 WW 48 2 8 48 2 8 0 0
INSTALL DIA INCH 0 WF 96 2 16 96 2 16 0 0
34

VISUAL HYDROTEST
REMARKS
DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE
TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 44 3 16 44 3 16 0 0
TOTAL DIA INCH 208 WU 20 2 10 20 2 10 0 0
FAB DIA INCH 164 WW 48 2 8 48 2 8 0 0
INSTALL DIA INCH 0 WF 96 2 16 96 2 16 0 0
34

VISUAL HYDROTEST
REMARKS
DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE

Page 185 of 225


TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 44 3 16 44 3 16 0 0
TOTAL DIA INCH 208 WU 20 2 10 20 2 10 0 0
FAB DIA INCH 164 WW 48 2 8 48 2 8 0 0
INSTALL DIA INCH 0 WF 96 2 16 96 2 16 0 0
34

VISUAL HYDROTEST
REMARKS
DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE
TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 44 3 16 44 3 16 0 0
TOTAL DIA INCH 208 WU 20 2 10 20 2 10 0 0
FAB DIA INCH 164 WW 48 2 8 48 2 8 0 0
INSTALL DIA INCH 0 WF 96 2 16 96 2 16 0 0
34

VISUAL HYDROTEST
REMARKS
DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE

Page 187 of 225


TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 44 3 16 44 3 16 0 0
TOTAL DIA INCH 208 WU 20 2 10 20 2 10 0 0
FAB DIA INCH 164 WW 48 2 8 48 2 8 0 0
INSTALL DIA INCH 0 WF 96 2 16 96 2 16 0 0
34

VISUAL HYDROTEST
REMARKS
DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE
TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 44 3 16 44 3 16 0 0
TOTAL DIA INCH 208 WU 20 2 10 20 2 10 0 0
FAB DIA INCH 164 WW 48 2 8 48 2 8 0 0
INSTALL DIA INCH 0 WF 96 2 16 96 2 16 0 0
34

VISUAL HYDROTEST
REMARKS
DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE

Page 189 of 225


TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 44 3 16 44 3 16 0 0
TOTAL DIA INCH 208 WU 20 2 10 20 2 10 0 0
FAB DIA INCH 164 WW 48 2 8 48 2 8 0 0
INSTALL DIA INCH 0 WF 96 2 16 96 2 16 0 0
34

VISUAL HYDROTEST
REMARKS
DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE
TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 44 3 16 44 3 16 0 0
TOTAL DIA INCH 208 WU 20 2 10 20 2 10 0 0
FAB DIA INCH 164 WW 48 2 8 48 2 8 0 0
INSTALL DIA INCH 0 WF 96 2 16 96 2 16 0 0
34

VISUAL HYDROTEST
REMARKS
DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE

Page 191 of 225


TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 44 3 16 44 3 16 0 0
TOTAL DIA INCH 208 WU 20 2 10 20 2 10 0 0
FAB DIA INCH 164 WW 48 2 8 48 2 8 0 0
INSTALL DIA INCH 0 WF 96 2 16 96 2 16 0 0
34

VISUAL HYDROTEST
REMARKS
DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE
TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 44 3 16 44 3 16 0 0
TOTAL DIA INCH 208 WU 20 2 10 20 2 10 0 0
FAB DIA INCH 164 WW 48 2 8 48 2 8 0 0
INSTALL DIA INCH 0 WF 96 2 16 96 2 16 0 0
34

VISUAL HYDROTEST
REMARKS
DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE

Page 193 of 225


TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 44 3 16 44 3 16 0 0
TOTAL DIA INCH 208 WU 20 2 10 20 2 10 0 0
FAB DIA INCH 164 WW 48 2 8 48 2 8 0 0
INSTALL DIA INCH 0 WF 96 2 16 96 2 16 0 0
34

VISUAL HYDROTEST
REMARKS
DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE
TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 44 3 16 44 3 16 0 0
TOTAL DIA INCH 208 WU 20 2 10 20 2 10 0 0
FAB DIA INCH 164 WW 48 2 8 48 2 8 0 0
INSTALL DIA INCH 0 WF 96 2 16 96 2 16 0 0
34

VISUAL HYDROTEST
REMARKS
DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE

Page 195 of 225


TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 44 3 16 44 3 16 0 0
TOTAL DIA INCH 208 WU 20 2 10 20 2 10 0 0
FAB DIA INCH 164 WW 48 2 8 48 2 8 0 0
INSTALL DIA INCH 0 WF 96 2 16 96 2 16 0 0
34

VISUAL HYDROTEST
REMARKS
DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE
TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 44 3 16 44 3 16 0 0
TOTAL DIA INCH 208 WU 20 2 10 20 2 10 0 0
FAB DIA INCH 164 WW 48 2 8 48 2 8 0 0
INSTALL DIA INCH 0 WF 96 2 16 96 2 16 0 0
34

VISUAL HYDROTEST
REMARKS
DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE

Page 197 of 225


TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 44 3 16 44 3 16 0 0
TOTAL DIA INCH 208 WU 20 2 10 20 2 10 0 0
FAB DIA INCH 164 WW 48 2 8 48 2 8 0 0
INSTALL DIA INCH 0 WF 96 2 16 96 2 16 0 0
34

VISUAL HYDROTEST
REMARKS
DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE
TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 44 3 16 44 3 16 0 0
TOTAL DIA INCH 208 WU 20 2 10 20 2 10 0 0
FAB DIA INCH 164 WW 48 2 8 48 2 8 0 0
INSTALL DIA INCH 0 WF 96 2 16 96 2 16 0 0
34

VISUAL HYDROTEST
REMARKS
DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE

Page 199 of 225


TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 44 3 16 44 3 16 0 0
TOTAL DIA INCH 208 WU 20 2 10 20 2 10 0 0
FAB DIA INCH 164 WW 48 2 8 48 2 8 0 0
INSTALL DIA INCH 0 WF 96 2 16 96 2 16 0 0
34

VISUAL HYDROTEST
REMARKS
DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE
TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 44 3 16 44 3 16 0 0
TOTAL DIA INCH 208 WU 20 2 10 20 2 10 0 0
FAB DIA INCH 164 WW 48 2 8 48 2 8 0 0
INSTALL DIA INCH 0 WF 96 2 16 96 2 16 0 0
34

VISUAL HYDROTEST
REMARKS
DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE

Page 201 of 225


TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 44 3 16 44 3 16 0 0
TOTAL DIA INCH 208 WU 20 2 10 20 2 10 0 0
FAB DIA INCH 164 WW 48 2 8 48 2 8 0 0
INSTALL DIA INCH 0 WF 96 2 16 96 2 16 0 0
34

VISUAL HYDROTEST
REMARKS
DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE
TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 44 3 16 44 3 16 0 0
TOTAL DIA INCH 208 WU 20 2 10 20 2 10 0 0
FAB DIA INCH 164 WW 48 2 8 48 2 8 0 0
INSTALL DIA INCH 0 WF 96 2 16 96 2 16 0 0
34

VISUAL HYDROTEST
REMARKS
DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE

25/07/11 340 FW-091X

Page 203 of 225


TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 44 3 16 44 3 16 0 0
TOTAL DIA INCH 208 WU 20 2 10 20 2 10 0 0
FAB DIA INCH 164 WW 48 2 8 48 2 8 0 0
INSTALL DIA INCH 0 WF 96 2 16 96 2 16 0 0
34

VISUAL HYDROTEST
REMARKS
DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE
TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 44 3 16 44 3 16 0 0
TOTAL DIA INCH 208 WU 20 2 10 20 2 10 0 0
FAB DIA INCH 164 WW 48 2 8 48 2 8 0 0
INSTALL DIA INCH 0 WF 96 2 16 96 2 16 0 0
34

VISUAL HYDROTEST
REMARKS
DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE

Page 205 of 225


TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 44 3 16 44 3 16 0 0
TOTAL DIA INCH 208 WU 20 2 10 20 2 10 0 0
FAB DIA INCH 164 WW 48 2 8 48 2 8 0 0
INSTALL DIA INCH 0 WF 96 2 16 96 2 16 0 0
34

VISUAL HYDROTEST
REMARKS
DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE
TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 44 3 16 44 3 16 0 0
TOTAL DIA INCH 208 WU 20 2 10 20 2 10 0 0
FAB DIA INCH 164 WW 48 2 8 48 2 8 0 0
INSTALL DIA INCH 0 WF 96 2 16 96 2 16 0 0
34

VISUAL HYDROTEST
REMARKS
DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE

Page 207 of 225


TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 44 3 16 44 3 16 0 0
TOTAL DIA INCH 208 WU 20 2 10 20 2 10 0 0
FAB DIA INCH 164 WW 48 2 8 48 2 8 0 0
INSTALL DIA INCH 0 WF 96 2 16 96 2 16 0 0
34

VISUAL HYDROTEST
REMARKS
DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE

3/1/2012 574 WS-045X

3/1/2012 574 WS-045X


TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 44 3 16 44 3 16 0 0
TOTAL DIA INCH 208 WU 20 2 10 20 2 10 0 0
FAB DIA INCH 164 WW 48 2 8 48 2 8 0 0
INSTALL DIA INCH 0 WF 96 2 16 96 2 16 0 0
34

VISUAL HYDROTEST
REMARKS
DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE

Page 209 of 225


TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 44 3 16 44 3 16 0 0
TOTAL DIA INCH 208 WU 20 2 10 20 2 10 0 0
FAB DIA INCH 164 WW 48 2 8 48 2 8 0 0
INSTALL DIA INCH 0 WF 96 2 16 96 2 16 0 0
34

VISUAL HYDROTEST
REMARKS
DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE
TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 44 3 16 44 3 16 0 0
TOTAL DIA INCH 208 WU 20 2 10 20 2 10 0 0
FAB DIA INCH 164 WW 48 2 8 48 2 8 0 0
INSTALL DIA INCH 0 WF 96 2 16 96 2 16 0 0
34

VISUAL HYDROTEST
REMARKS
DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE

Page 211 of 225


TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 44 3 16 44 3 16 0 0
TOTAL DIA INCH 208 WU 20 2 10 20 2 10 0 0
FAB DIA INCH 164 WW 48 2 8 48 2 8 0 0
INSTALL DIA INCH 0 WF 96 2 16 96 2 16 0 0
34

VISUAL HYDROTEST
REMARKS
DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE
TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 44 3 16 44 3 16 0 0
TOTAL DIA INCH 208 WU 20 2 10 20 2 10 0 0
FAB DIA INCH 164 WW 48 2 8 48 2 8 0 0
INSTALL DIA INCH 0 WF 96 2 16 96 2 16 0 0
34

VISUAL HYDROTEST
REMARKS
DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE

Page 213 of 225


TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 44 3 16 44 3 16 0 0
TOTAL DIA INCH 208 WU 20 2 10 20 2 10 0 0
FAB DIA INCH 164 WW 48 2 8 48 2 8 0 0
INSTALL DIA INCH 0 WF 96 2 16 96 2 16 0 0
34

VISUAL HYDROTEST
REMARKS
DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE
TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 44 3 16 44 3 16 0 0
TOTAL DIA INCH 208 WU 20 2 10 20 2 10 0 0
FAB DIA INCH 164 WW 48 2 8 48 2 8 0 0
INSTALL DIA INCH 0 WF 96 2 16 96 2 16 0 0
34

VISUAL HYDROTEST
REMARKS
DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE

3/7/2012 584 WS-071X

Page 215 of 225


TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 44 3 16 44 3 16 0 0
TOTAL DIA INCH 208 WU 20 2 10 20 2 10 0 0
FAB DIA INCH 164 WW 48 2 8 48 2 8 0 0
INSTALL DIA INCH 0 WF 96 2 16 96 2 16 0 0
34

VISUAL HYDROTEST
REMARKS
DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE

3/7/2012 584 WS-015X


TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 44 3 16 44 3 16 0 0
TOTAL DIA INCH 208 WU 20 2 10 20 2 10 0 0
FAB DIA INCH 164 WW 48 2 8 48 2 8 0 0
INSTALL DIA INCH 0 WF 96 2 16 96 2 16 0 0
34

VISUAL HYDROTEST
REMARKS
DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE

Page 217 of 225


TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 44 3 16 44 3 16 0 0
TOTAL DIA INCH 208 WU 20 2 10 20 2 10 0 0
FAB DIA INCH 164 WW 48 2 8 48 2 8 0 0
INSTALL DIA INCH 0 WF 96 2 16 96 2 16 0 0
34

VISUAL HYDROTEST
REMARKS
DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE

3/8/2012 585 WS-010X


PROJECT : MDC OIL GAS (SK320) LTD MUBADALA PETROLEUM TOPSIDES CPP (PEGAGA PROJECT)
TOTAL SPOOL 44
CLIENT : MUBADALA PETROLEUM FABRICATE 19
JOB NO. : TBA INSTALL 0
TOTAL JOINT 185

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE REMART
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH
1"-WF-71110-Z01N_IMD Z01N WF 1 1 OF 1 C2 J 1 QL 1 7000M 1 11-Jan

1"-WF-71110-Z01N_IMD Z01N WF 1 1 1 1 OF 1 C2 J 2 QL 1 7000M 1 15-Jan

1"-WF-71110-Z01N_IMD Z01N WF 1 1 OF 1 C2 J 3 QL 1 7000M 1 15-Jan

1"-WF-71110-Z01N_IMD Z01N WF 2 1 OF 1 C1 FJ 4 QL 1 7000M

1"-WF-71110-Z01N_IMD Z01N WF 2 1 OF 1 C2 J 5 QL 1 7000M 1 10-Jan

1"-WF-71110-Z01N_IMD Z01N WF 2 1 1 1 OF 1 C2 J 6 QL 1 7000M 1 15-Jan

1"-WF-71110-Z01N_IMD Z01N WF 2 1 OF 1 C2 J 7 QL 1 7000M 1 15-Jan

1"-WF-71110-Z01N_IMD Z01N WF 2 1 OF 1 C2 J 8 QL 1 7000M 1 15-Jan

1"-WF-71110-Z01N_IMD Z01N WF 3 1 OF 1 C1 FJ 9 QL 1 7000M

1"-WF-71110-Z01N_IMD Z01N WF 3 1 OF 1 C2 J 10 QL 1 7000M 1 10-Jan


1 1
1"-WF-71110-Z01N_IMD Z01N WF 3 1 OF 1 C2 J 11 QL 1 7000M 1 10-Jan

1"-WF-71110-Z01N_IMD Z01N WF 3 1 OF 1 C2 J 12 QL 1 7000M 1 10-Jan

1"-WF-71110-Z01N_IMD Z01N WF 4 1 1 OF 1 C1 FJ 13 QL 1 7000M

1"-WF-71110-Z01N_IMD Z01N WF 5 1 OF 1 C1 FJ 14 QL 1 7000M

1"-WF-71110-Z01N_IMD Z01N WF 5 1 OF 1 C2 J 15 QL 1 7000M 1 11-Jan

1"-WF-71110-Z01N_IMD Z01N WF 5 1 OF 1 C2 J 16 QL 1 7000M 1 11-Jan


1 1
1"-WF-71110-Z01N_IMD Z01N WF 5 1 OF 1 C2 J 17 QL 1 7000M 1 11-Jan

1"-WF-71110-Z01N_IMD Z01N WF 5 1 OF 1 C2 J 18 QL 1 7000M 1 11-Jan

1"-WF-71110-Z01N_IMD Z01N WF 5 1 OF 1 C1 FJ 19 QL 1 7000M

1"-WF-71109-Z01N_IMD Z01N WF 1 1 OF 1 C1 J 1 QL 1 7000M HOLD

1"-WF-71109-Z01N_IMD Z01N WF 1 1 1 OF 1 C1 J 2 QL 1 7000M HOLD

1"-WF-71109-Z01N_IMD Z01N WF 1 1 OF 1 C1 J 3 QL 1 7000M HOLD

1"-WF-71109-Z01N_IMD Z01N WF 2 1 OF 1 C1 FJ 4 QL 1 7000M HOLD


1
1"-WF-71109-Z01N_IMD Z01N WF 2 1 OF 1 C1 J 5 QL 1 7000M HOLD

1"-WF-71109-Z01N_IMD Z01N WF 3 1 OF 1 C1 FJ 6 QL 1 7000M HOLD


1 1
1"-WF-71109-Z01N_IMD Z01N WF 3 1 OF 1 C2 J 7 QL 1 7000M 1 13-Jan

1"-WF-71109-Z01N_IMD Z01N WF 4 1 1 OF 1 C1 FJ 8 QL 1 7000M

Page 219 of 225


PROJECT : MDC OIL GAS (SK320) LTD MUBADALA PETROLEUM TOPSIDES CPP (PEGAGA PROJECT)
TOTAL SPOOL 44
CLIENT : MUBADALA PETROLEUM FABRICATE 19
JOB NO. : TBA INSTALL 0
TOTAL JOINT 185

PIPING SPOOL SPOOL FAB INST JOINT MATE. FAB DIA INST DIA
DRAWING & SPOOL NO. SYSTEM MATE. 1 MATE. 2 DATE REMART
CLASS NO QTY SHEET REV. J/FJ NO.JOINT TYPE SIZE (INCH) GRADE INCH INCH
1"-WF-71109-Z01N_IMD Z01N WF 5 1 1 OF 1 C1 FJ 9 QL 1 7000M

1"-WF-71109-Z01N_IMD Z01N WF 6 1 1 OF 1 C1 FJ 10 QL 1 7000M

1"-WF-71109-Z01N_IMD Z01N WF 7 1 1 OF 1 C1 FJ 11 QL 1 7000M

1"-WF-71109-Z01N_IMD Z01N WF 8 1 OF 1 C1 FJ 12 QL 1 7000M

1"-WF-71109-Z01N_IMD Z01N WF 8 1 OF 1 C2 J 13 QL 1 7000M 1 13-Jan

1"-WF-71109-Z01N_IMD Z01N WF 8 1 1 1 OF 1 C2 J 14 QL 1 7000M 1 11-Jan

1"-WF-71109-Z01N_IMD Z01N WF 8 1 OF 1 C2 J 15 QL 1 7000M 1 11-Jan

1"-WF-71109-Z01N_IMD Z01N WF 8 1 OF 1 C2 J 16 QL 1 7000M 1 11-Jan


TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 0 0 0 0 0 0 0 0
TOTAL DIA INCH 564 WU 193 16 87 147 6 65 46 10
FAB DIA INCH 251 WW 144 7 24 114 2 19 30 5
INSTALL DIA INCH 0 WF 219 20 67 163 5 49 56 15
FAB JOINT 73 VT 8 1 8 8 1 8 0 0

VISUAL HYDROTEST
REMARKS
RFI NO. DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE

Page 221 of 225


TOTAL FAB INSTALL
SERVICE DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL
WS 0 0 0 0 0 0 0 0
TOTAL DIA INCH 564 WU 193 16 87 147 6 65 46 10
FAB DIA INCH 251 WW 144 7 24 114 2 19 30 5
INSTALL DIA INCH 0 WF 219 20 67 163 5 49 56 15
FAB JOINT 73 VT 8 1 8 8 1 8 0 0

VISUAL HYDROTEST
REMARKS
RFI NO. DATE RPT. NO. DATE R1 RFI NO. R2 DATE DATE
AMERSTRAND ENGINEERING SDN. BHD.
GRE PIPING
JOINT SUMMARY ( PIPING )

PROJECT : MDC OIL GAS (SK320) LTD MUBADALA PETROLEUM TOPSIDES CPP (PEGAGA PROJECT)
CLIENT : MUBADALA PETROLEUM SDN. BHD.
JOB NO. :
DATE : 12 SEPT 2019

TOTAL FABRICATE INSTALL


MODULE SERVICE
DIA INCH SPOOL JOINT DIA INCH SPOOL JOINT DIA INCH SPOOL JOINT
WS 8159 129 718
WU 1235 74 395
CED
WW 144 8 24
WF 5244.5 185 1296
WS 2644.5 68 330
WU 744 88 399
MAD
WF 7426.5 330 1545
WW 120 5 20
WS 385.5 11 76
WF 180.5 13 55
MZD
WU 0 0 0
WW 2 1 2
WS 0 0 0
WU 60 11 54
UPD
WW 0 0 0
WF 1165.5 82 562
WS 0 0 0
WU 40 7 26
SERVICE DECK
WW 0 0 0
WF 627 31 281
WS 560 6 24
WU 100 9 42
HUD
WF 156 9 26
WW 510.5 16 88
WS 44 3 16
WU 20 2 10
IPS
WW 48 2 8
WF 96 2 16
WS 0 0 0
WU 193 16 87
IMD
WF 144 7 24
WW 219 20 67

30,269 1,135 6,191 0 0 0 0 0 0

DIA INCH SPOOL JOINT


WS 11793 217 1164
WU 2392 207 1013
WW 1043.5 52 209
WF 15040 659 3805
AMERSTRAND ENGINEERING SDN. BHD.
GRE PIPING
JOINT SUMMARY ( PIPING )

PROJECT : MDC OIL GAS (SK320) LTD MUBADALA PETROLEUM TOPSIDES CPP (PEGAGA PROJECT)
CLIENT : MUBADALA PETROLEUM SDN. BHD.
JOB NO. :
DATE 3/27/2020

FABRICATION PROGRESS

TOTAL PREVIOUS PROGRESS LATEST PROGRESS ACCUMMULATED PROGRESS TOTAL BALANCE


MODULE SERVICE
PERCENTAGE (DIA
SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH
INCH)

WS 73 505 5922 14 292 3292 14 292 3292 55.59% 59 213 2630


WU 44 305 932 21 238 706 21 238 706 75.75% 23 67 226
CED
WW 4 14 84 0 10 60 0 10 60 71.43% 4 4 24
WF 87 941 4219 45 669 3090 45 669 3090 73.24% 42 272 1129
WS 22 239 1573 4 81 762 4 81 762 48.44% 18 158 811
WU 13 287 525 4 230 398 4 230 398 75.81% 9 57 127
MAD WF 62 1013 5076.5 26 605 2920 26 605 2920 57.52% 36 408 2156.5
WW 3 18 108 3 12 72 3 12 72 66.67% 0 6 36
VT 0 0 0 0 0 0 0 0 0 #DIV/0! 0 0 0
WS 2 30 111 2 17 31 2 17 31 27.93% 0 13 80
MZD
WF 7 52 277.5 0 25 150 0 25 150 54.05% 7 27 127.5
WF 18 392 860 4 201 386 4 201 386 44.88% 14 191 474
UPD
WU 3 45 49 1 41 41 1 41 41 83.67% 2 4 8
WF 4 209 542 2 159 397 2 159 397 73.25% 2 50 145
SERVICE DECK
WU 1 19 28 0 10 10 0 10 10 35.71% 1 9 18
WF 15 82 470.5 0 0 0 0 0 0 0.00% 15 82 470.5
WS 6 24 560 0 0 0 0 0 0 0.00% 6 24 560
HUD
WU 9 42 100 0 2 4 0 2 4 4.00% 9 40 96
WW 4 15 90 1 3 18 1 3 18 20.00% 3 12 72
WF 2 16 96 0 16 96 0 16 96 100.00% 2 0 0
IPS WS 3 16 44 0 0 0 0 0 0 0.00% 3 16 44
WW 2 8 48 2 8 48 2 8 48 100.00% 0 0 0
VT 1 8 8 0 0 0 0 0 0 0.00% 1 8 8
WF 5 49 163 4 45 159 4 45 159 97.55% 1 4 4
IMD
WU 6 65 147 0 18 36 0 18 36 24.49% 6 47 111
WW 2 19 114 0 9 54 0 9 54 47.37% 2 10 60

TOTAL 398 4,413 22,148 0 0 0 133 2,691 12,730 133 2,691 12,730 57% 265 1,722 9,418

INSTALLATION PROGRESS

TOTAL PREVIOUS PROGRESS LATEST PROGRESS ACCUMMULATED PROGRESS TOTAL BALANCE


MODULE SERVICE
PERCENTAGE (DIA
SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH SPOOL JOINT DIA-INCH
INCH)

WS 55 169 2237 0 0 0 0 0 0 0.00% 55 169 2237


WU 29 87 303 0 0 0 0 0 0 0.00% 29 87 303
CED
WW 4 10 60 0 0 0 0 0 0 0.00% 4 10 60
WF 98 354 1025.5 53 18 55 53 18 55 5.36% 45 336 970.5
WS 44 84 1065.5 6 0 0 6 0 0 0.00% 38 84 1065.5
WU 73 109 219 44 6 7 44 6 7 3.20% 29 103 212
MAD WF 268 527 2350 87 12 58 87 12 58 2.47% 181 515 2292
WW 2 2 12 1 0 0 1 0 0 0.00% 1 2 12
VT 0 0 0 0 0 0 0 0 0 #DIV/0! 0 0 0
WS 11 25 69.5 5 2 3 5 2 3 4.32% 6 23 66.5
MZD
WF 4 18 108 2 0 0 2 0 0 0.00% 2 18 108
WF 63 165 300 24 0 0 24 0 0 0.00% 39 165 300
UPD
WU 8 9 11 3 1 1 3 1 1 9.09% 5 8 10
WF 26 101 189 16 5 10 16 5 10 5.29% 10 96 179
SERVICE DECK
WU 6 7 12 0 0 0 0 0 0 0.00% 6 7 12
WF 1 6 40 0 0 0 0 0 0 0.00% 1 6 40
HUD
WW 3 8 48 1 3 18 1 3 18 37.50% 2 5 30