Revision # 3.0
Site
Date of analysis
Event date;
Which action were taken? Inspected and confirm HMI controller cards malfunction
Failure cost: -
What was the impact? Can’t change generator priority and display can’t check
MAINTENANCE Document # : GMD-500-03-FMT
Revision # 3.0
When did it happen? When checking daily inspection, found HMI fault
What changed? NA
Draw a flow diagram that is able to register the sequence of the events
MAINTENANCE Document # : GMD-500-03-FMT
Revision # 3.0
Use the failure tree to indicate the possible probable causes of the event.
Confirmed
Classification Category Describe probable cause What started the event? Why do you think this happened?
cause
Failure Tree
OPERATIONS DESIGN/ASSEMBLY EQUIPMENT AND FACILITIES MATERIALS MAINTENANCE ENVIRONMENT SPARE PARTS
inexistent of Not acting in inexistent procurement inadequate inadequate
lack of supervision inadequate concept Periodic wear inexistent procedure temperature
procedure protection procedure supervision identification
Random sudden inadequate procurement inadequate inadequate
failed procedure Training supervisors inadequate execution Corrosion training supervisors humidity
failure procedure procedure specification
undisclosed shift change with inadequate procurement procedure shift change with inadequate inventories
Abrasion Bad adjustment failed procedure storms
procedure miscommunication terminology not fulfilled miscommunication model
frequency of
tool outside induced electric manual language Earthquake /Natural technical acceptance
operator skills inadequate reception oxidation Supplier's competences inadequate
Specification current other than native disaster inadequate
maintenance plan
improper storage
improper handling
Type of action
Confirmed cause Preemptive task Procedure Training Redesign Other
Random sudden Install new HMI
failure HMI - - controller card -
1 controller card
Use the technique 5W1H to realize the planning and follow-up to the defined actions.