You are on page 1of 4

Update Sep.

2019
Work Experience
1- Process Operations Sup. KORRA, Egypt Sep. 2018 - Present
2- Senior Process Operation Eng. WASCO, Egypt Jul. 2017 - Present
3- Operations Engineer WASCO, Egypt Jul. 2011 - Jun. 2017
4- Training Instructor WASCO, Egypt May. 2009 - Present

Education
Muhammad Khaleel
M.Sc. in Petroleum Engineering (Ongoing)
‫ﳏﻤﺪ ﺧﻠﻴﻞ ﺑﻜﺮ‬ Cairo University, Egypt October 2019

Sr. Process Operation B.Sc. in Petroleum Engineering


Engineer, El-Wastani Suez Canal University, Egypt May 2010 V. Good with honor degree
Petroleum Company Project: Raml Field Design (80.01%)
Grade: Excellent ranked (2nd position)
(WASCO),
ABOUT ME Egypt.

DOB: 29st Dec. 1987


Highlights of Expertise
• Process modeling & optimization • Operation Troubleshooting/Debottlenecking
Nationality: Egyptian • Incident Investigation • Plant Performance upgrading
Married with two kids • PL & Network Simulation • Process Control
• Process Safety Studies • Start-up and SD planning
• Project Scope of Work • Conceptual & Detailed Eng. Review
CONTACT ME • Project statement of requirements • Class room/On Job Training
• Construction, Pre-commissioning, Commissioning & startup
Behira, Egypt.
muh.khaleel@gmail.com
Process Operations Supervisor
+2 0122 60 34 680
Korra – Flared Gas Recovery Project Hurghada, Egypt Sep. 2018 –present
SKILLS Fields of Experience: as a Process Operations Supervisor
• Monitor and control the process equipment's performance with all respects including
production units' performance, product specification and chemical usage to achieve
Aspen HYSYS optimum, best economic and cost-effective results.
• Ensure up to date operating envelopes and alarms & trip registers are available.
• Carry out and monitor DCS trending of key process parameters of process units,
AutoCAD P&ID perform preliminary investigations and recommend short term and long-term actions,
• Participate in Incident investigations and prepare reports.
MS Visio • Recommend corrective actions to deal with abnormalities, de-bottlenecking,
upgrading and optimum operating conditions.
• Prepare process performance tests; discuss test procedures with plant operators,
Mac & iOS & WIN collect performance data, and prepare performance tests reports,
• Write daily reports including production figures, done activities, trips & Maintenance
Outstanding Presentation & defects.
Communication Skills • Provide a safe plan for Shutdown and start-up operations.
• Participate in the Health and Safety meetings.
Strong Influences • Participate in HAZOP studies.
Leadership & management • Follow-up construction, pre-commissioning and commissioning operations.
• Develop Risk Assessments for daily activities and operations.
Hard worker, energetic &
self-motivated
Enthusiasm and creativity

PROFILES

Muhammad Khaleel

Page 1 of 4
Muhammad Khaleel C.V.

El-Wastani Petroleum Company (WASCO) Damietta, Egypt / Jul. 2017 – Present


WASCO has two gas plants which processes Rich/Dry gas to produce Natural Gas, Stabilized Condensate and Liquefied
Petroleum Gas L.P.G through the following processes:
• Physical Separation,
• MRU, MEG (Mono Ethylene Glycol) Recovery unit,
• Hydrocarbon Dew point control unit,
• Mechanical Refrigeration system,
• MSU, Molecular Sieve Unit (Temperature Swing Adsorption Dehydration Process),
• Glycol Dehydration Process (Absorption Dehydration Process by TEG – Tri Ethylene Glycol),
• CSU, Condensate Stabilization unit,
• LPG Recovery system, including Turbo-Expander / J.T valve, Plate Fins Exchanger (Cold Box) and Fractionation Towers
(De-Ethanizer & De-Butanizer Units),
• Storage and Shipping Facilities (Condensate fixed roof tanks & LPG Bullets),
• CPI, Corrugated Plates Intercepts (Produced Water treatment unit),
• Gas Compression station (Reciprocating Compressors),
• Utilities; Instrument air, Inert gas, Hot Oil Heating systems.
Fields of Experience: as a Senior Process Operation Engineer
• Leading the fields' process / operation team, demonstrating effective process / operation engineering leadership.
• Behaving with high commitment to follow systems for reporting, investigating, and lessons-learned with primary focus on
undesired incidents and accidents.
• Promoting safe and efficient operation of plant equipment to meet or exceed targeted On-Stream, Availability and
Reliability.
• Assessing problem situations to identify causes, gathering and processing relevant information, generating possible
solutions, and making recommendations and/or resolving the problem.
• Developing new and unique ways to improve and optimize plant operations using process simulation programs such as
Aspen HYSYS.
• Strongly commit to comply with the Management of Changes (MOC) procedure to address all the plant modifications and
new projects as a part of Process Safety Management (PSM) system.
• Evaluating the bidders’ offers for the new projects.
• Performing material & energy balance of the gas plant and estimating the products recoveries to detect the plant
performance.
• Review of various conceptual & detailed engineering deliverables (Drawings & Documents) such as PFDs, P&IDs,
Process Datasheets, Equipment Specifications, Cause & Effect Diagrams, Hazardous Area Classifications, Control
Philosophies, Shutdown Philosophies, HAZID, HAZOP & SIL studies & reports, Operation Manuals, etc.; to comply with
the process & safety requirements of the company, Legislation, Standards, Codes of Practice and good engineering
principles to agreed time, cost and quality.
• Providing process expertise and leadership during plant Process Hazards Analysis (PHA) and HAZID, HAZOP, LOPA
and SIL assessment studies to ensure safest, most reliable and effective control of processes.
• Leading new projects commissioning, start-up & performance tests activities to maintain safe work procedures.
• Following up plant daily activities and job requests through a Computerized Maintenance Management System (CMMS).
• Preliminary sizing for new gas pipelines and deciding the required diameters, thickness and lengths from remote sites to
the plant by using Aspen HYSYS/PIPESIM simulators.
• Reviewing design of new well's pipelines, manifold and network to comply with flow assurance requirements of the
company and standards.
Fields of Experience: as a Shut-Down Coordinator – Plant Reliability Enhancement Shut-Down June, 2017
• Assist in the scope of work planning
• Ensure that all required resources are identified.
• Track material deliveries and develop contingency plans for critical items.
• Prepare, update and publish shutdown project charts detailing planned/proposed shutdown work across the site.
• Provide isolation plan/philosophy to ensure that all activities are implemented safely.
• Provide nitrogen purge plan to ensure that cutting/welding operations are safely implemented.
• Provide regular reporting to senior management on the progress of the shutdown.

Page 2
Muhammad Khaleel C.V.

Projects:
• Engineering Review, Commissioning, start-up and Performance test of SEM Utilization Project (May, 2018).
• El Wastani Central Processing Facilities (CPF) Mercury Removal Project (July 2017 – present).
• Tendering, Basic & detailed engineering, Construction and Commissioning of new open drain system (Jan 2018 – Present).
• Action tracking and close out of Plant Re-HAZOP study (2017 – present).
• Process leader for HAZID study of New Sales Gas Compressor K-409 Project (Sep. 2017).
• Construction, Commissioning, start-up and Performance test of Plant Reliability Enhancement Project (June, 2017).
• Engineering review & Performance test of " Increasing Plant Capacity Utilizing Existing Stand-by JT plant" (2016).
• Engineering Review for Faraskur Nodal Compression Station (2016).
• Process leader for HAZOP of Faraskur Nodal Compression Station (2016).
Achievements:
• Provide nitrogen purge plan for Plant Reliability Enhancement Shut-Down (June, 2017), reducing fire incident cases from 12
cases as per previous shut-down (May 2014) to Zero incident as per Shut- Down (June, 2017).
• Drew and updated the missing and outdated drawings for Phase-III to be used in Plant Re-HAZOP study.

Operation Engineer
El-Wastani Petroleum Company (WASCO Damietta, Egypt Jul. 2011 – Jun. 2017
Fields of Experience: as an Operation Engineer
• Monitor and control the process equipment's performance with all respects including production units' performance,
product specification and chemical usage to achieve optimum, best economic and cost-effective results.
• Ensure up to date operating envelopes and alarms & trip registers are available.
• Carry out and monitor DCS trending of key process parameters of process units, perform preliminary investigations and
recommend short term and long-term actions,
• Participate in Incident investigations and prepare reports.
• Recommend corrective actions to deal with abnormalities, de-bottlenecking, upgrading and optimum operating conditions.
• Prepare process performance tests; discuss test procedures with plant operators, collect performance data, and prepare
performance tests reports,
• Write daily reports including production figures, done activities, trips & Maintenance defects.
• Provide a safe plan for Shutdown and start-up operations.
• Participate in the Health and Safety meetings.
• Participate in HAZOP studies.
• Follow-up construction, pre-commissioning and commissioning operations.
Fields of Experience: as Shut-Down Coordinator - PH-III increasing Capacity Project Shutdown, 2014
• Prepare, update and publish shutdown project charts detailing planned/proposed shutdown work across the site.
• Establish manpower planning, to achieve maintenance/shutdown schedule compliance.
• Coordinate with all stakeholders to create an integrated shutdown schedule.
• Prepare start-up and Shutdown procedures.
• Provide isolation plan/philosophy to ensure that all activities are implemented safely.
• Provide nitrogen purge plan to ensure that cutting/welding operations are safely implemented.
Projects:
• Commissioning/Start-up team leader for El-Bassant Nodal Compression station (Oct. 2014).
• Construction, Commissioning, start-up and Performance test of El-Wastani gas plant for implementation of CPF
increasing capacity project required modifications (March 2014).
• Commissioning/Start-up for El-Wastani-II Nodal-II Compression station (Aug. 2011).
Achievements:
Training Instructor team of El-Bassant Nodal compression plant, minimizing scheduled time to put the plant
• Led commissioning/start-up
on production before the targeted date and without recording any incident.
• Provide outstanding techniques to overcome some repeated operational problems like; hydrate formation problems
inside LTS facilities, Vessel blockage with sludge & low differential pressure of lube oil pumps, which are considered
and followed later in operational philosophy.

Page 3
Muhammad Khaleel C.V.
Training Instructor
Working for AUC (American University in Cairo – School of Business), OGS (Oil and Gas Skills company), ENPPI Academy,
Talent & BIC (British International Center for training and Consultancy) as technical training instructor on part time basis for;
Classroom, On-Job & Competency based Training (CBT) programs including the following courses: (2014 – present)
• Natural Gas Processing Fundamentals.
• Gas processing plants operation & troubleshooting.
• Fundamentals of LPG production technology.
• Advanced LPG Technology, start-up, shut-down and troubleshooting.
• Surface Production Facilities.
• Planned Shut-down & Start-up.
• Process Hand Calculations.
• Process Safety Fundamentals, HAZOP.
• Management of Change.
• Process Equipment Operations; Compressors & Pumps.
• Over pressure control and flare system design.
• Process Plants Simulation, using Aspen HYSYS.

Training Projects: ZOHR foundation training program.


The program was intended to train about new hired operations engineers for the big field constructed in Egypt (ZOHR)
under consultancy of OGS with Cooperation of AUC, started from July, 2017 and finished at the end of March 2018.

Training Courses (Attendee)*


§ PIPESIM, Steady-state Multiphase Flow Simulator (Schlumberger Information Solutions, NEXT)
§ Pressure relief and flare systems, operation, start-up, troubleshooting & shutdown (Oil and Gas Skills)
§ Process safety analysis, HAZOP studies, SIL determination and verification (Oil and Gas Skills)
§ Safety Instrumented Function (SIS) (Oil and Gas Skills)
§ Process Safety Fundamental (Dana Gas, Egypt)
§ International General Certificate (IGC) in Occupational Health & Safety (NEBOSH, Distinction)
§ Distillation Processes, Calculations and Multivariable Process Control (Oil and Gas Skills)
§ HAZOP Application for Petroleum Industry Level I (Oil and Gas Skills)
§ RS View-32, Project Development (Automation management solutions, AMSOL)

Languages
ARABIC Mother Tongue ENGLISH

* Certificates are available upon request.


Happy to be one of you

Page 4

You might also like