Professional Documents
Culture Documents
Bakan - MGEI 2015 - Final PDF
Bakan - MGEI 2015 - Final PDF
2014 EXPLORATION RESULTS UPDATE
Balikpapan, October 5th 2015
PT. J Resources Bolaang
J Resources – September 2011 Mongondow
Presentation Outline
2
J Resources – September 2011
Access and Location
No. B. 143/Pres/3/1997
covering area about 58,150 Ha
Consist of two block :
1. Lanut : Kab. Bol‐Mong Timur
2. Bakan: Kab. Bol‐Mong &
Kab. Bol‐Mong Selatan
Feasibility :
Gubernur Sulawesi Utara No: 272
Tahun 2012
Construction :
Kementerian ESDM No :
1815/31.02/DBM/2012
Production :
Kementrian ESDM No.
233.K/40.00.DJG/2004
44.4m @0.52g/t Au
89.4m @0.69g/t Au
34.4m @0.57g/t Au
31.2m @ 1.12g/t Au
22.6m @0.44g/t Au
22.5m @ 0.68g/t Au
80.6m @ 0.88g/tAu
36.8m @1.85 g/tAu
56.1m @ 0.6g/t Au
68m @2.4g/tAu
32m @1.62g/tAu
28m @1.88g/t Au
7.8m @1.26g/tAu
31m @1.01g/tAu 35m @ 1.19g/tAu1
33.7m @1.54g/tAu
18.8m@1.42g/tAu
39m @ 0.82g/tAu
11.9m @5.22g/tAu
Mineral resource Estimate at 0.3 g/t Au Cut‐Off Grade (AMC, 2011)
Deposit Resource Category Tonne(Jt) Au(g/t) Ag(g/t) Au KOz Ag KOz
DURIAN Tertunjuk (Indicated) 16 0.73 3.70 376 1,903
Tereka (Inferred) 1.9 0.41 2.80 25 171
Sub‐total 18 0.70 3.60 405 2,083
OSELA Tertunjuk (Indicated) 5.1 1.00 4.80 164 787
Tereka (Inferred) 1.9 0.69 2.70 42 165
Sub‐total 7 0.93 4.20 209 945
TOTAL 25 0.76 3.80 610 3,054
Tota l ma y not a ppea r to be the s um of da ta due to roundi ng
J Resources – September 2011
October 2015
Bakan Mineral Resources 2012