You are on page 1of 12

Member of Indika Energy Group

Simply
Reliable
About
in resource development, we operate the third
largest single coal mine in Indonesia”

Established under the


Coal Contract of Work Annual Annual
(CCOW) agreement production production
with the Indonesian share to Indonesian reaches 34 million 32 - 34 million tons
Partners tons
2004 2012 2016 - 2018

2008 2015
commercial Annual Annual production
production at 3 production reaches 39 million tons
million tons per reaches 22 million with capacity over than
year tons 50 million tons per year

• Samarinda

• Balikpapan
Tanah Merah
Coal Terminal Adang Bay
Transshipment Point

Pasir Mine Site

INDONESIA

East
Kalimantan

• Paser

Mining Block Resources Reserves


KIDECO mine is located in Paser Regency,
Roto 379 48 East Kalimantan, Indonesia, about 200 km
south-east of Balikpapan. In our 47,500
Samurangau (SM) 1,193 512 hectares of mining area, we have huge coal
reserves with total resources identied as 1.625
Susubang Uko 41 7 million tons and mineable reserves of 569
million tons at the end of 2017. The gures are
Total * 1,625 569
expected to increase through the continuous
Coal Resource estimates are not precise calculations, being dependent on the interpretation
of limited information on the location, shape and continuity of the occurrence and on the available exploration process.
sampling results. The totals contained in the above table have been rounded to reflect the relative
uncertainty of the estimate.Rounding may cause some computational discrepancies.

1
Why Low Sulfur Content

Kideco • Average sulfur content 0.1%, 1/7


of normal bituminous coal
• Power Plants can comply with the

Coal Quality by either single burning of Kideco


coal (80ppm) or blended burning
of Kideco coal with normal
Low Nitrogent Content bituminous coal (170ppm)

customers to save the capital and
operational costs in construction
and operation of FGD (Flue-gas
desulfurization)

Our Coal Facts:

Parameter Roto Coal SM Coal


Low Ash Content
Total Moisture * 27% 36%
• 3.5% ash content Volatile Matter 41% 38%
• Allow power plants to maintain smaller
area for ash disposal, promising a Ash 3.5% 3%
longer life of the ash pond Total Sulfur 0.1% 0.1%
• Provides lower work-load of
Nitrogen 0.8% 0.8%
electrostatic precipitator
Caloric Value (kcal/kg) ** 4,800 4,150%

* As Received Basis ** Gross As Received

Stable Supply

39Km

Private Hauling Road Sea Barging Transshipment Facility

KIDECO has 39 kilometers KIDECO operates 31 sets of


private road for transporting tug and barge with capacity to load both gearless and
coal from the crushing plant of 8,000-12,000 DWT for geared vessels. KIDECO
to the coal terminal. The road transporting the coal from
has been paved to endure coal terminal to transshipment and 3 FLFs (Floating Loading
Indonesia’s worst rainy season. point. Unlike river barging, the Facility) at the offshore
It is built on private land so it process will not be affected transshipment point, Adang
will not be intervene by the by drought during the dry Bay with loading capacity
local residents season. over 50 million tons per year.

2
Our
Market & Sales

Italy
Slovenia
Spain

India

Having successfully entered into the


domestic and international market,
KIDECO is currently supplying KIDECO coal
to 60 customers in 20 different countries
such as Indonesia, India, China, Japan,
Taiwan, Malaysia, Philippines, Korea, etc.
The majority of coal sales are on a
long-term contract basis and the coal is
mainly used for power generation.

Started the production at 1.1 million tons of


bituminous thermal coal in 1993, KIDECO
continuously expanded production volume
to 40 million tons in 2014.

3
“Many coal red power plants
around the world are enjoying both
environmental and economic benets
allowing them to meet environmental
limits as well as reducing electricity
generation costs”

China
Korea
Japan
Taiwan
Hongkong
Thailand
Philippines

alaysia
Indonesia Production/Sales
(million tons)

40

34 34

32
29

22

18.9
16.9

11.5

8.1

2000 2002 2004 2006 2008 2010 2012 2014 2016 2018
4
1. Overburden removal

KIDECO operates an open-pit mine where the soil is

overburden removal process involves removing the top


soil by using heavy equipment and conveying them to
the waste disposal area located outside the pit.

Our
Green Process
2. Coal production
KIDECO commits to
environmental
preservation by
then transported from rejuvenating the
the pit either to two ROM surrounding to its original
stockpiles, MCCP and SMCP. state. Native trees are
At ROM stockpile, the quality replanted in the areas
management program is that had been
performed to supply proper mined-out and run-off
quality to the customers. water is collected in
settling ponds to protect
the river from pollution

3. Crushing

The coal from ROM stockpiles is put through the


crushing plant where the coal is crushed to a size
under 50 mm. The crushing plant is equipped with
magnetic separators.

5
6. Transshipment

Coal barge is towed to the offshore


transshipment point at Adang Bay which is 58
km away from TMCT. Transshipment is either
carried by a crane of the mother vessel, a

with the combined loading capacity over 50


million tons per year.

5. Barge loading

KIDECO operates private


barge loading port called
Tanah Merah Coal Terminal
(TMCT). From the hauler, the
coal is either stored in TMCT
stockyard or directly loaded
onto the barges. Stockyard
capacity of TMCT is 700,000
ton. KIDECO operates 6 coal
loaders with barge loading
capacity up to 150,000 tons
per day. There are automatic
samplers and magnetic
separators on the coal loading
conveyors for stringent quality
control and for analysis of coal
quality assisted by 3 on-site
independent international
surveyors.

4. Hauling

Crushed coal is transported using coal haulers from


the crushing plant to the barge loading port. KIDECO
constructed a 39 km private hauling road that a
stretch of all-weather macadam with minimum
curves and hills. The road stability results in more

mines.

6
We Share
The Love
We believe that improving the quality of life and the sustainability of local communities
surrounding our business activities and operation ultimately leads to the sustainable
development and growth of KIDECO – and therefore is in our best interest. The various
programs and activities in education, health, economy, and infrastructure we design and
carry out in terms of community development are all fundamentaly based upon this belief.

u c a ti o h e a lth o no m y stru c tu
ed n ec fra

re
in
Yayasan Bina
Health Clinic, Integrated
Bersama KIDECO, Power Facilities,
Ambulances, Farming System
Mobile Library, Roads, Bridges,
Doctor Services, (IFS), Home
School Development Religious Facilities,
and Clean Water Industry, and Micro
Program, Scholarship,
Supply Financing
and Student Prize

7
8
We Save
More Our business involves
developing natural
resources in a broad area,
which makes it necessary
for us to disclose our
impact on the ecosystem
Restoration to stakeholders. It’s our
obligation to protect
Descriptions Unit 2015 2016 2017 2018
nature as the habitat
Mine (PIT) Area ha 10,315 10,693 11,205 11,749 of diverse wildlife and
as the livehood of local
Restored Land Area ha 2,163 2,502 2,930 3,357 communities and our
Number of Trees Planted trees 2,396,438 2,673,497 3,019,802 3,362,407 employees. We restores
soil pollution from mining
Ratio of Well Grown Trees % >95 >95 >95 >95 and established mine
closure plans, ultimately
aiming to rehabilitate the
ecosystem into its pre-
mining state in the long
term.

Wastewater
(thousand tons)
Wastewater Quality
147 Standard
66 Parameter Govt. KIDECO Result

65 pH 6.0-9.0 7.0-8.0 7.76


55 TSS (mg/L) 300 200 10
Fe (mg/L) <7.0 <1.0 0.06
Mn (mg/L) <4.0 <0.5 0.03
2015 2016 2017 2018

Waste Management

2015 3,683 2,891

2016 2,901 4,520

2017 3,494 4,355

2018 2,900.54 3,388

Non-B3 Waste (ton) B3 Waste (ton)

2015 168.6 84.28%

2016 231.3 89.18%

2017 245.3 82.23%

2018 184.94 90.19%

Waste per Production (ton/mil. tons) Recycling Rate

9
Our
Achievements
Based on good mining practices, KIDECO achieved and maintain local, national and

and health management systems. Also, KIDECO actively participate in industry associations and

Indonesia Mining Top CSR 2018 Indonesia Taxpayer PROPER


Association Awards Award

The highest award in As a form Performance Rating


Kideco was recognized the 2018 TOP CSR was Program (PROPER)
of goverment
as the 2018 highest given to the president intiated by the
appreciation, especially
percentage of domestic Director of KIDECO as the regional large Government of
marketing obligation (DMO) TOP leader on the 2018 CSR Indonesia under
tax ofce Ministry of Environment
for CCoW holder category commitment regarding the gave awards to encourage
performing beyond the support top management to the largest compliance of
minimum obligation of of KIDECO towards Indonesia taxpayers companies in
supplying our coal to fulll the implementation in 2018 one of environmental
domestic coal requirement. of a very good CSR program. which was kideco. management.

Quality
Management
OHSAS 18001 : 2007
ISO 9001 : 2015
PAS 99 : 2012
ISO 14001 : 2015
ISO 5001 : 2011

10
Member of Indika Energy Group

East Kalimantan Province


INDONESIA
Tel. : +62 543 22522

Graha Mitra, 1st Floor


Jl. Jend. Gatot Subroto Kav. 21
Jakarta 12930, INDONESIA
Tel. : +62 21 525 7626

Komplek Balikpapan Superblock


Block C No. 41
Jl. Jend. Sudirman, Balikpapan 76114
East Kalimantan, INDONESIA
Tel. : +62 542 721 3672

marketing@kideco.co.id http://www.kideco.com

You might also like