Experience Summary
Having 6+ years of experience in SAP Plant Maintenance (PM) with Implementation, Support,
Roll Out projects.
Configuration of PM Organizational Structure.
Expertise in understanding business process and mapping in SAP as per client requirement.
Good logical skills suitable for Business process design, development & implementation.
Configuration of Master data settings and Maintenance Process Settings for SAP PM.
Preparation of Functional Specs for new developments to reach the client requirements for
reports which are not in standard SAP.
Good communication and interpersonal skills.
Strong team orientation, hard working and enthusiastic.
Higher Education
Bachelor of Engineering in ECE from S.K.D Engg College (JNT University)
Experience
Page 1 / 6
Project Duration: April 2018 to Till Date
Responsibilities: Uploading Mass data uploads based on client requirement via
LSMW in Production client.
Resolving incidents created in .
Configured order types (Corrective Maintenance, Breakdown
Maintenance, Preventive Maintenance, Calibration and
Refurbishment Process).
Created master data & manual configurations as per the
business requirement in testing systems for unit testing, SIT &
UAT.
Prepared the test scripts executed the business scenarios.
Collected all the dependency data from other team filled the
data sheet templates to execute the Integration test scenario.
Worked as a Lead Consultant in ITC InfoTech India from September 2017 to April 2018.
Page 2 / 6
Collected all the dependency data from other team filled the
data sheet templates to execute the Integration test scenario.
Worked as a Consultant in Capgemini Technology Services India Limited from Dec 2014 to Aug 2017.
Page 3 / 6
Role: SAP PM Consultant
Worked as a Software Engineer in IBM India Pvt Ltd., (through Collabera) from July 2013 to October
2014.
SAP PM Consultant
Role:
Duration: April 2014 to Oct 2014
Responsibilities: Collected master Data with the business and did the
configuration.
Page 4 / 6
Configured order types (Break down, preventive and
refurbishment).
Identified the maintenance items and configured strategies,
maintenance plans (Time and condition based) and scheduling
parameters.
Configuration for Master Data of technical objects, Maintenance
order planning, Maintenance order Processing.
Created master data as per the business requirement in testing
system for unit testing ITC & prepared the test scripts &
uploaded in HPQC tool executed the business scenarios.
Collected all the dependency data from other team filled the
data sheet templates to execute the ITC business scenario.
Involved in manual Build process.
SAP PM Consultant
Role:
Duration: July 2013 to March 2014
Responsibilities: Collected the KDS (Key Data Structure) with the business and did
the configuration as per KDS & created configuration Document
as per KDS for each config nodes.
Created master data as per the business requirement in testing
system for unit testing ITC & prepared the test scripts &
uploaded in HPQC tool executed the business scenarios.
Configured order types (Break down, preventive and
refurbishment).
Collected all the dependency data from other team (MM, FICO
etc...) filled the data sheet templates to execute the ITC business
scenario.
For ITC1 & ITC2 (Integration Testing) Prepared the test scripts &
uploaded in HPQC and executed the business scenarios.
CAT (Confirmation from business Acceptance Testing)
coordinated and guided the business local deploy team in
execution of business scenarios.
TC1, TC2, TC3 (Trial Conversion) Activities: Data cleansing and
master data upload strategy cutover Activities:-Create the
cutover plan and set the date for all task and according these
task we do all the activities.
Take the Triangle Call Every Week: In this call, I will take care of
local deploy Business and understand their difficulty in SAP and
Page 5 / 6
give suggestion and solved their problems and Upload it into
GLL Links.
Monitoring and error handling of interfaces through AIT.
Given Training to new Employee from business local deploy
team.
Changes in configuration based on requirements of client with
change in Business Processes if required.