ANNEXURE- F

OPENING OF NEWLY CONSTRUCTED 3RD LINE


FROM KENDPOSI STATION (NEW PT. KM 345.252 AT TABU END)
TO MALUKA STATION (NEW PT. KM 357.054 AT DPS END)
OF RAJKHARSWAN-DANGOAPOSI 3RD LINE PROJECT OF CHAKRADHARPUR DIVISION.

AVERAGE RAIN FALL PARTICULARS OF THE SECTION IN MM.

Length : 11.802 Km.( Km. 345.252 to Km. 357.054) Gauge : 1676 mm

Sl.
Year JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Total Remarks
No.
1 2012 108.00 58.00 0.00 66.00 13.00 385.00 174.00 980.00 560.00 216.00 58.00 49.00 2667.00

2 2013 9.00 20.00 20.00 149.00 211.00 305.00 811.00 686.00 644.00 418.00 0.00 0.00 3273.00

3 2014 0.00 29.99 77.13 31.00 147.26 172.29 426.84 371.23 180.98 86.85 0.00 0.00 1523.57

4 2015 36.41 27.14 8.56 127.83 92.13 360.66 513.08 91.93 242.98 23.57 0.00 45.41 1569.70

5 2016 0.00 52.85 0.00 0.00 229.98 110.99 601.37 567.37 359.54 26.99 0.00 0.00 1949.09

6 2017 0.00 0.00 18.00 0.00 131.41 405.74 849.92 501.38 368.55 159.97 0.00 0.00 2434.97

7 2018 0.00 0.00 0.00 198.54 89.28 239.94 609.63 630.5 414.81 63.57 2246.27

Total 15663.60

otal Rain fall of this section (for 6.833 Year)= 15663.60 Average Rain fall per Year = 2292.35

(K.Hansda) (H. Goyal)


Dy.Chief Engineer(Con) Chief Engineer/Con/I
S.E Railway,Tatanagar S.E Railway, Garden Reach
APR MAY JUN JUL AUG SEP OCT
51.42 28.57 122.85 27.14 4.14 12 35
12.85 13.57 1.4 9.28 41.42 32.85 28.57
47.14 47.14 15.71 75.71 71.42 12.85
42.85 21.42 23.57 10 56.42
11.42 25 83.57 4.28 4.28
27.86 42.14 37.14 48.57 39.28
5 2.14 14.28 2.85 6
9.28 19.28 5 143.57
8.57 25 24
4.28 7.14 62.85
27.85 15.71 20.71
128.57 26.42
38.97 50
10 145.71
10 50
10 8.57
63.57 12.14
17.85 50.71
24.28
27.14
198.54 89.28 239.94 609.63 630.5 414.81 63.57