7.38
6
0
April May June July Au
12.26 12.41
11.91
11.02
10.28
9.8
10.5 10.4 10.52
9.97
9.43
8.7
Total Rejn %
Prod Parts Rej %
SR NO.PART NAME PART WT. PRODN QTY PRODN WT. TOTAL REJN QTY
2 3DU 5.365 27372 146850.78 3991
4 NGCR BODY 6.017 12000 72204.00 935
12 HUB OPNER 2.721 10328 28102.49 838
1 CR 22 BODY 6.92 3546 24538.32 377
5 TACO 6890 10.736 2848 30576.13 317
21 SPINDLE-CE70 2.96 0 0.00 278
8 KCJ BODY SMA 4.993 648 3235.46 261
39 KCJ BODY BIG 4.857 3672 17834.90 254
3 875 CARRIER 25.473 26 662.30 212
15 TG CASE 302 18.88 837 15802.56 197
11 COVER CARRIE 9.33 912 8508.96 190
14 SIDE HOUSING 12.604 1321 16649.88 188
9 DIPL COVER 17.908 4158 74461.46 170
42 BRAKE PISTON- 5.635 2984 16814.84 168
10 SIDE HOUSING 12.573 1321 16608.93 166
26 Brake piston 5.275 1854 9779.85 166
23 ROCKSHAFT 21 10.522 1467 15435.77 161
6 OIL PAN 21.96 2231 48992.76 146
7 SPINDLE 714 21.105 2214 46726.47 139
13 SIDE HOUSING 14.08 484 6814.72 139
19 SIDE HOUSING 14.037 484 6793.91 110
18 JD COVER 344 8.582 2202 18897.56 100
16 Hub Housing 8.656 1209 10465.10 85
38 HOUSING D60 9.825 1260 12379.50 64
32 HOUSING-CE6 7.272 660 4799.52 61
33 SPINDLE 716 20.775 538 11176.95 56
43 piston 902425 2.378 2152 5117.46 53
36 HSG 602 9.755 0 0.00 52
49 BEARING CAP 1.45 300 435.00 47
29 BRACKET 363 13.9 218 3030.20 46
34 SPRING HOUSI 4.715 738 3479.67 42
58 HUB 569 7.221 1920 13864.32 41
30 Hub 950 31.11 262 8150.82 37
47 DRUM 738 12.11 480 5812.80 37
22 HOUSING 626 25.62 412 10555.44 36
27 TACO 8068 9.497 0 0.00 35
35 FINAL CASE 11.297 670 7568.99 34
45 CARRIER 9260 11.26 864 9728.64 34
40 BRACKET 763 13.74 266 3654.84 30
25 BRAKE COVER 8.92 0 0.00 26
20 HOUSING 643 27.43 236 6473.48 24
65 Basic Housing- 12.84 100 1284.00 24
50 DRUM 748 JD 3.95 426 1682.70 23
28 housing NO601 27.887 457 12744.36 22
37 SPINDLE 728 21.145 646 13659.67 22
51 WHEEL HUB 10 12.24 0 0.00 22
53 DIFF CASE MON 8.545 1084 9262.78 18
17 HUB 640 45.9 0 0.00 17
24 CONNECT COVE 23.445 129 3024.41 17
48 ARM SPRING B 10.255 494 5065.97 15
31 HOUSING 603 28.21 406 11453.26 11
62 IAD COVER 46 6.23 0 0.00 10
46 FRONT MOUNT 12.01 0 0.00 6
64 Basic Housing- 6.31 228 1438.68 4
41 BKT 719 28.033 94 2635.10 3
44 SPINDLE 731 19.61 0 0.00 3
52 JD SHANK BRA 8.41 0 0.00 1
54 BRACKET 277 9.05 0 0.00 0
55 PLANE DIFF CA 12.12 0 0.00 0
56 BRACKET RH(1 26.4 0 0.00 0
57 bracket 278 9.64 0 0.00 0
59 BKT 619 28.323 0 0.00 0
60 BRACKET LH(14 26.8 0 0.00 0
61 HUB 656 4.9 0 0.00 0
63 450 CARRIER 37.5 0 0.00 0
ection (Quantity)
Rejection Weight (kg) Top Defects
Slag
21411.715 BH
Shrinkage
Core Inclusion
Fett Damage
5625.895 Excess Fett
Short Pour
Sand Inclusion
Slag (74)
2608.84 Core shift (47)
Fett Damage (41)
Sand Drop & Blow hole (each 30)
Shrinkage-330
Casting shift-56
Pin Hole-17
BH-191
Less wall-33
Box Leak-28
BH-165
Cold-18
BH-98
Sand drop-45
Core inclusion-29
Slag-69
BH & Excess Fett-each 23
Fett damage-20
Sand drop-17
Top 10
SR NO. PART NAME PART WT. PRODN QTY PRODN WT.
TOTAL REJN QTY REJN % TOTAL REJN WT. FDY REJ QTY FDY REJ WT
3991 14.58 21.41 1054 5654.71
935 7.79 5.63 689 4145.71
212 815.38 5.40 5 127.37
197 23.54 3.72 77 1453.76
317 11.13 3.40 152 1631.87
146 6.54 3.21 105 2305.80
170 4.09 3.04 76 1361.01
139 6.28 2.93 39 823.10
377 10.63 2.61 215 1487.80
188 14.23 2.37 51 642.80
838 8.11 2.28 292 794.53
166 12.57 2.09 57 716.66
139 28.72 1.96 64 901.12
190 20.83 1.77 69 643.77
161 10.97 1.69 54 568.19
110 22.73 1.54 37 519.37
261 40.28 1.30 58 289.59
254 6.92 1.23 184 893.69
56 10.41 1.16 22 457.05
37 14.12 1.15 9 279.99
168 5.63 0.95 73 411.35
36 8.74 0.92 24 614.88
166 8.95 0.88 80 422.00
100 4.54 0.86 63 540.67
278 #DIV/0! 0.82 11 32.56
17 #DIV/0! 0.78 0 0.00
85 7.03 0.74 11 95.22
24 10.17 0.66 6 164.58
46 21.10 0.64 30 417.00
64 5.08 0.63 37 363.53
22 4.81 0.61 1 27.89
52 #DIV/0! 0.51 12 117.06
22 3.41 0.47 10 211.45
37 7.71 0.45 11 133.21
61 9.24 0.44 20 145.44
30 11.28 0.41 23 316.02
17 13.18 0.40 2 46.89
34 5.07 0.38 28 316.32
34 3.94 0.38 34 382.84
35 #DIV/0! 0.33 0 0.00
11 2.71 0.31 7 197.47
24 24.00 0.31 24 308.16
41 2.14 0.30 7 50.55
22 #DIV/0! 0.27 0 0.00
26 #DIV/0! 0.23 0 0.00
42 5.69 0.20 27 127.30
15 3.04 0.15 15 153.83
18 1.66 0.15 9 76.91
53 2.46 0.13 5 11.89
23 5.40 0.09 1 3.95
3 3.19 0.08 2 56.07
6 #DIV/0! 0.07 1 12.01
47 15.67 0.07 39 56.55
10 #DIV/0! 0.06 10 62.30
3 #DIV/0! 0.06 0 0.00
4 1.75 0.03 4 25.24
1 #DIV/0! 0.01 0 0.00
0 #DIV/0! 0.00 0 0.00
0 #DIV/0! 0.00 0 0.00
0 #DIV/0! 0.00 0 0.00
0 #DIV/0! 0.00 0 0.00
0 #DIV/0! 0.00 0 0.00
0 #DIV/0! 0.00 0 0.00
0 #DIV/0! 0.00 0 0.00
0 #DIV/0! 0.00 0 0.00
10561 10.65 0.00 3936 31599.002
TOTAL REJN QTY REJN % #VALUE! FDY REJ QTY FDY REJ WT
FR REJ % M/C REJ QTY M/C REJ WT CR REJ %
Slag
3.85 2937 15757.01 10.73 BH
Shrinkage
Core Inclusion
Fett Damage
5.74 246 1480.18 2.05 Excess Fett
Short Pour
Sand Inclusion
BH (70)
9.20 120 2265.60 14.34 Shrinkage (24)
Core Incl (24)
Core shift (19)
FDY REJ QTY FDY REJ WT FR REJ % M/C REJ QTY M/C REJ WT
94 3954.58 30.72 79 3323.53
83 1205.49 4.65 163 2367.41
20 373.34 4.46 130 2426.71
27 503.20 7.03 97 1807.79
36 598.03 5.89 95 1578.14
69 1431.06 46.94 30 622.20
57 369.93 4.16 233 1512.17
46 161.00 5.94 410 1435.00
98 553.70 5.98 140 791.00
31 310.53 36.90 98 981.67
127 712.85 8.43 61 342.39
47 313.02 3.43 94 626.04
11 352.11 25.58 14 448.14
19 77.04 1.61 169 685.30
64 615.04 13.25 0 0.00
64 613.12 13.09 0 0.00
23 548.09 45.10 1 23.83
8 108.56 #DIV/0! 30 407.10
6 219.72 4.23 8 292.96
28 292.60 3.67 11 114.95
25 114.75 2.67 48 220.32
11 266.42 52.38 0 0.00
7 75.39 43.75 16 172.32
20 220.30 12.90 2 22.03
19 166.25 #DIV/0! 6 52.50
16 55.20 1.67 45 155.25
18 159.30 #DIV/0! 5 44.25
8 134.54 2.99 2 33.63
4 151.84 #DIV/0! 0 0.00
59 147.50 8.38 0 0.00
4 24.04 1.92 18 108.18
10 37.70 1.40 3 11.31
0 0.00 0.00 5 47.95
3 18.51 #DIV/0! 3 18.51
5 36.15 6.94 0 0.00
1 5.10 #DIV/0! 5 25.50
3 8.70 6.98 0 0.00
3 6.75 0.35 0 0.00
2 5.74 3.33 0 0.00
2 5.22 #DIV/0! 0 0.00
0 0.00 #DIV/0! 0 0.00
0 0.00 #DIV/0! 0 0.00
0 0.00 #DIV/0! 0 0.00
0 0.00 #DIV/0! 0 0.00
0 0.00 0.00 0 0.00
0 0.00 0.00 0 0.00
CR REJ %
9.14
BH-165
Cold-18
29.02
25.26
15.55 Shrinkage-43
BH-24
Box leak-17
20.41
17.02
52.97
8.54
116.67
CR REJ %
25.82
9.14
29.02
25.26
15.55
20.41
17.02
52.97
8.54
116.67
4.05
6.87
32.56
14.33
0.00
0.00
1.96
#DIV/0!
5.63
1.44
5.13
0.00
100.00
1.29
#DIV/0!
4.69
#DIV/0!
0.75
#DIV/0!
0.00
8.65
0.42
1.28
#DIV/0!
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0.00
0.00
at Foundry stage at M
Sr No Defects name No. Of defectives Contributors Sr No
388- 3DU
110- Hub opener
1 SLAG 961 1
64- LUV CARRIER 23498
46-SPACER DRAW BAR-2097
168-NGCR body
100- KCJ Big bore
2 FETT, DAMAGE 602 2
84- 3DU
50- CR22 body
53-NGCR Body
51-Taco 6890
3 SAND DROP 550 3
45-PADMINI 147200100
41- Housing 2001
6 SHRINKAGE 315 6
10 COLD 162 10
997- 3DU
348- Hub Opener
BLOW HOLE 3062 1 BLOW HOLE
237- Spindle CE701
191- Carrier 510
676- 3DU
SLAG 1343 68- CR22 3 SHRINKAGE
57- Rockshaft 2154
SHORT POUR
Top 10 Defects (Foundry + M/C)
No. Of defectives Contributors
1004- 3DU
350- Hub Opener
3292
237- Spindle CE701
191- Carrier 510
3000
330- Chiana Carrier
209- 3DU
1773
193- 875 Carrier 2500
73-SIDE HOUSING RH (84) NEW 2304
60-NGCR Body
0
616 51-Taco 6890
45-PADMINI 147200100 LE AG
E E N G OP
HO SL K AG AG SIO
TLIN
DR
N M U T C
61-3DU OW HRI , DA NCL FE ND LD
BL S T T E I SS SA O
299 39- Bearing cap FE R CE M
37- Brake Piston 212 CO EX
48- CR22
288
42- 3DU
92- NGCR body
257
87- 3DU
252
Top 10 Defects (Foundry + M/C)
73
No. Of defectives
1005 1002
898
616
E
AG
N
IN
G OP AC
K FT N
M USIO
TL DR R SHI USIO
T C
DA CL E D E CL
T, E IN SSF SAN O LD COR IN
R CE M ND
CO EX SA
SR NO. PART WT. PRODN QTY PRODN WT. TOTAL REJN QTY REJN % PART NAME
1 5.365 27372 146850.78 3991 14.58 3DU
2 6.017 12000 72204.00 935 7.79 NGCR BODY
3 25.473 26 662.30 212 20.00 875 CARRIER
4 18.88 837 15802.56 197 23.54 TG CASE 302
5 10.736 2848 30576.13 317 11.13 TACO 6890
6 21.96 2231 48992.76 146 6.54 OIL PAN
7 17.908 4158 74461.46 170 4.09 DIPL COVER
8 21.105 2214 46726.47 139 6.28 SPINDLE 714
9 6.92 3546 24538.32 377 10.63 CR 22 BODY
10 12.604 1321 16649.88 188 14.23 SIDE HOUSING LH (83) NEW
15.00
10.00
5.63 5.40 TOTAL REJN WT.
5.00 3.72 3.40 3.21 3.04 2.93 2.61 2.37
0.00
U ER 2 0 AN R 14
3D DY RI 30 89 VE 7 DY NE
W
BO R E 6 LP O LE BO 3)
CR CA CA
S O OI LC D 22
5 AC DI
P IN (8
NG 8 7 TG T SP CR LH
G
SIN
U
E HO
SID
TOTAL REJN WT. FDY REJ QTY FDY REJ WT FR REJ % M/C REJ QTY M/C REJ WT CR REJ % Cost
21.41 1054 5654.71 3.85 2937 15757.01 10.73 446.9
5.63 689 4145.71 5.74 246 1480.18 2.05 386
5.40 5 127.37 19.23 207 5272.91 796.15 2366.4
3.72 77 1453.76 9.20 120 2265.60 14.34 1347.4
3.40 152 1631.87 5.34 165 1771.44 5.79 1009
3.21 105 2305.80 4.71 41 900.36 1.84 1814.4
3.04 76 1361.01 1.83 94 1683.35 2.26 1236.7
2.93 39 823.10 1.76 100 2110.50 4.52 1755.1
2.61 215 1487.80 6.06 162 1121.04 4.57 471.4
2.37 51 642.80 3.86 137 1726.75 10.37 1229.9
53.72
0.00
Apr/21 May/21 Jun/21 Jul/21 Aug/21 Sep/21 Oct/21
BH 1004
9 FUSED SAND 0 0.00 100.00
Shrinkage 209
11 K/O DAMAGE 0 0.00 100.00
20 CORE SHIFT 0 0.00 100.00
21 LESS WALL/rusty 0 0.00 100.00
3991
16.46 % Rej
14.58
ep/21 Oct/21
200 100.00
90.15 92.06
86.02 88.20
83.01 90.00
000 79.33
75.65 80.00
70.41
70.00
800
60.00
51.82
600 50.00 Defectives
%Rej
40.00
Cum %
400 26.66 30.00
20.00
200
26.66 25.16
18.59 10.00
5.24 3.68 3.68 3.01 2.18 1.95 1.90
0 0.00
Defect
Root cause analysis Action Taken Effectiveness
contribution
100.00
90.00
80.00
70.00
60.00
50.00 Defectives
%Rej
40.00
Cum %
30.00
20.00
10.00
0.00
14.58%
10.00%
Target
Decided10%
NGCR
Month % Rej
Dec-20 % Rej
Jan-21
Feb-21 140.00
116.67
Mar-21 120.00
Apr-21 8.50
100.00
May-21
Jun-21 116.67 80.00 % Rej
Jul-21 4.33 60.00
Aug-21 7.82
Sep-21 4.75 40.00
Oct-21 7.79 20.00 8.50 7.82 7.79
4.33 4.75
0.00
Apr/21 May/21 Jun/21 Jul/21 Aug/21 Sep/21 Oct/21
Fett
247+121=
Damage +
368
Excess Fett
75 7.79
p/21 Oct/21
0 95.08 100.00
91.34
86.63 90.00
81.39
0
74.97 80.00
68.34
70.00
0 61.60
60.00
51.76
0 50.00 Defectives
39.36 %Rej
40.00
Cum %
0 26.42 30.00
20.00
0
26.42
10.00
12.94 12.41 9.84 6.74 6.63 6.42 5.24 4.71 3.74
0 0.00
Defect Current
Root cause analysis Action Taken Effectiveness
contribution rejection %
Rejection % targeted
in month Nov 2021
5%
5%
875 Carrier
Month % Rej
Dec-20 % Rej
Jan-21
Feb-21 900.00 815.3
Mar-21 800.00
Apr-21 18.20 700.00
May-21 10.50 600.00
Jun-21 233.00 500.00
Jul-21 13.15 400.00
Aug-21 9.11 300.00 233.00
Sep-21 36.00 200.00
Oct-21 815.38
100.00 18.20 10.50 13.15 9.11 36.00
0.00
Apr/21 May/21 Jun/21 Jul/21 Aug/21 Sep/21 Oct/2
Shrinkage 193
19 CORE INCLUSION 0 0.00 100.00
BH 10
20 CORE SHIFT 0 0.00 100.00
21 LESS WALL/rusty 0 0.00 100.00
23 EXCESS FETTLING 0 0.00 100.00
24 FETT, DAMAGE 0 0.00 100.00
212
% Rej
815.38
% Rej
15 9.11 36.00
0 120.00
80.00
0
60.00 Defectives
%Rej
0 91.04 Cum %
40.00
0
20.00
0 4.72 2.36 0.94 0.94 0.00 0.00 0.00 0.00 0.00 0.00
SHRINK BH LOW BHN SLAG CUT SAND
AGE SECTION DROP
Defect Current
Root cause analysis Action Taken Effectiveness
contribution rejection %
Hot spot generates in Trial to be planned on 27-10-
91.04 Gatting system changed 815.38%
groove area. 2021
Rejection % targeted
in month Nov 2021
12%
TG CASE 302
Month % Rej
Dec-20 % Rej
Jan-21
Feb-21 30.00
26.40
Mar-21 24.86
25.00 23.32 23.
Apr-21 26.40
May-21 18.20 20.00 18.20 17.25
Jun-21 12.71
15.00 12.71
Jul-21 23.32
Aug-21 24.86 10.00
Sep-21 17.25
Oct-21 23.54 5.00
0.00
Apr/21 May/21 Jun/21 Jul/21 Aug/21 Sep/21 Oct
Blow Hole 75
17 HIGH BHN 0 0.00 100.00
18 LOW BHN 0 0.00 100.00
20 CORE SHIFT 0 0.00 100.00
197
% Rej
24.86
2 23.54
17.25
% Rej
80 120.00
70
92.89 94.42 95.43 100.00
90.86
87.31
60
81.22
73.10 80.00
50
62.44
40 60.00 Defectives
50.25
%Rej
30 38.07 Cum %
40.00
20
38.07 20.00
10
12.18 12.18 10.66 8.12 6.09 3.55 2.03 1.52 1.02
0 0.00
Defect Current
Root cause analysis Action Taken Effectiveness
contribution rejection %
23.54%
To escape the gas, vents are Trial to be taken before 31-10-
35.29% Excess core moisture. Target
provided on cores by drilling 2021
Decided15%
Defectives
%Rej
Cum %
Rejection % targeted
in month Nov 2021
15.00%
TACO 6890
Month % Rej
Dec-20 % Rej
Jan-21
Feb-21 30.00
Mar-21 24.23
25.00
Apr-21
May-21 20.00
16.30
Jun-21 16.30
15.00 13.37
Jul-21 10.29 11.13
10.29
Aug-21 13.37 10.00
Sep-21 24.23
Oct-21 11.13 5.00
0.00
Apr/21 May/21 Jun/21 Jul/21 Aug/21 Sep/21 Oct/2
Sand Drop 51
24.23
% Rej
13.37
9 11.13
120.00
96.21 97.79
92.74 94.64 100.00
88.64
84.23
78.23
71.61 80.00
64.98
60.00 Defectives
48.90 %Rej
Cum %
40.00
48.90
20.00
16.09
6.62 6.62 5.99 4.42 4.10 1.89 1.58 1.58 0.00
Defect Current
Root cause analysis Action Taken Effectiveness
contribution rejection %
1)Core oven temp maintained
on 170˚C for 90min
2)SG boring avoided in a Rejection contribution was
48.90% Gas Entrapment charge mix (old charge mix 66.40% in the month of
used) September,21
3)Graphite paint used at 11.13%
specific location Target Decided
12%
Rejection % targeted
in month Nov 2021
8%
Oil Pan
Month % Rej
Dec-20 % Rej
Jan-21
7.00 6.54
Feb-21
5.85
Mar-21 6.00 5.60 5.50
Apr-21 4.90 4.90
5.00
May-21 5.60
Jun-21 5.50 4.00 3.54
3.27
Jul-21 3.54 3.00
Aug-21 5.85
Sep-21 3.27 2.00
Oct-21 6.54 1.00
0.00
Apr/21 May/21 Jun/21 Jul/21 Aug/21 Sep/21 Oct/21
K/O
33 22.60%
Damage
18 LOW BHN 0 0.00 100.00
Shourt
27 18.49%
pour
19 CORE INCLUSION 0 0.00 100.00
20 CORE SHIFT 0 0.00 100.00
21 LESS WALL/rusty 0 0.00 100.00
22 CUT SECTION 0 0.00 100.00
146
6.54
% Rej
3.27
Sep/21 Oct/21
93.15 100.00
90.41
87.67
84.25 90.00
80.14
75.34 80.00
68.49
70.00
58.22
60.00
50.00 Defectives
41.10
%Rej
40.00
Cum %
30.00
.60
20.00
.60 18.49 10.00
17.12
10.27 6.85 4.79 4.11 3.42 2.74 2.74 0.00
Current
Root cause analysis Action Taken Effectiveness
rejection %
Because of less
Need to strengthen the pads by Date to be decided with
thickness resting pad
modifying shape development team
becoming weak
6.54%
Target
C/S area of down sprue Decided3%
100% visual inspection of down
getting reduced due to To be observed in November
sprue
sand fall
Defectives
%Rej
Cum %
Rejection % targeted
in month Nov 2021
3%
DIPL cover
Month % Rej
Dec-20 % Rej
Jan-21
10.00 9.36
Feb-21
9.00
Mar-21
8.00
Apr-21 1.00
7.00
May-21 2.50
6.00
Jun-21 2.63
5.00 4.09
Jul-21 3.81 3.81
4.00
Aug-21 9.36 2.63 2.67
3.00 2.50
Sep-21 2.67
2.00 1.00
Oct-21 4.09
1.00
0.00
Apr/21 May/21 Jun/21 Jul/21 Aug/21 Sep/21 Oct/21
BH 44
10 PIN HOLE 0 0.00 100.00
Excess SB 39
% Rej
1 4.09
2.67
50 120.00
45
95.88 97.06 100.00
94.12
40 90.00
85.29
35 80.00
74.12 80.00
30
62.35
25 60.00 Defectives
48.82 %Rej
20
Cum %
40.00
15
25.88
10
20.00
5 25.88 22.94
13.53 11.76
5.88 5.29 4.71 4.12 1.76 1.18
0 0.00
BH Exess S/B SLAG FETT, SHORT CORE
DAMAGE POUR SHIFT
Defect Current
Root cause analysis Action Taken Effectiveness
contribution rejection %
4.09%
Newly occurred
in top 10
4.09%
1)Castings not to be shot Newly occurred
blasted until cooled down to in top 10
room temp In process
22.94 Negligence
2)Shot blasting timing & shot
level to be strictly monitored at
starting of each shift
Defectives
%Rej
Cum %
Rejection % targeted
in month Nov 2021
3%
3%
Spindle 714
Month % Rej
Dec-20 % Rej
Jan-21
Feb-21 8.00 7.30 7.19
Mar-21 7.00 6.28
6.00 5.99 6.04
Apr-21 6.00 6.00
May-21 7.30 4.97
5.00
Jun-21 7.19
4.00
Jul-21 5.99
Aug-21 4.97 3.00
Sep-21 6.04 2.00
Oct-21 6.28 1.00
0.00
Apr/21 May/21 Jun/21 Jul/21 Aug/21 Sep/21 Oct/2
Slag +
42+27 =69
Shrinkage
18 LOW BHN 0 0.00 100.00
20 CORE SHIFT 0 0.00 100.00
21 LESS WALL/rusty 0 0.00 100.00
23 EXCESS FETTLING 0 0.00 100.00
139
% Rej
6.04 6.28
4.97
% Rej
45 120.00
40 98.56
96.40 97.84
94.96 100.00
92.09
35 86.33
80.58
30 80.00
65.47
25
60.00 Defectives
20 49.64
%Rej
Cum %
15 40.00
30.22
10
20.00
5 30.22
19.42 15.83 15.11
5.76 5.76 2.88 1.44 1.44 0.72
0 0.00
Defect Current
Root cause analysis Action Taken Effectiveness
contribution rejection %
6.28%
30.22+19.42 New Laddle design
Under process Under monitering Target Decided
=49.64% implimented from 23 oct-21
5%
Defectives
%Rej
Cum %
Rejection % targeted
in month Nov 2021
5.00%
CR-22
Month % Rej
Dec-20 6.94 % Rej
Jan-21 8.68
Feb-21 9.70 14.00
11.90
Mar-21 9.60 12.00 11.00
10.20 10.63
Apr-21 11.00 10.00
10.00 9.31
May-21 10.00
7.65
Jun-21 11.90 8.00
Jul-21 10.20 6.00
Aug-21 7.65
Sep-21 9.31 4.00
Oct-21 10.63 2.00
0.00
Apr/21 May/21 Jun/21 Jul/21 Aug/21 Sep/21 Oct/21
% Rej
Sep/21 Oct/21
100.00
90.98
88.59
85.15 90.00
80.37
75.33 80.00
67.37 70.00
58.62
60.00
49.60
50.00 Defectives
36.87 %Rej
40.00
Cum %
30.00
.69
20.00
Current
Root cause analysis Action Taken Effectiveness
rejection %
10.63%
To be monitored in November Target Decided
6%
10.63%
1)Casting handling awareness To be monitored in November Target Decided
1)Improper handling given to workers 6%
2)Negligence 2)Amount debited from the
respective contractor’s account
From July PPT
Defectives
%Rej
Cum %
Rejection % targeted
in month Nov 2021
6.00%
6.00%
SIDE HOUSING LH (83) NEW
Month % Rej
Dec-20 % Rej
Jan-21
Feb-21 16.00
14.23
Mar-21 14.00
Apr-21 12.00
May-21 9.79
10.00 8.50
Jun-21 7.05 7.75
8.00 7.05
Jul-21 9.79
Aug-21 7.75 6.00
Sep-21 8.50 4.00
Oct-21 14.23 2.00
0.00
Apr/21 May/21 Jun/21 Jul/21 Aug/21 Sep/21 Oct/21
Shrinkage 67
18 LOW BHN 0 0.00 100.00
Excess Fett 26
20 CORE SHIFT 0 0.00 100.00
Sand Drop 23
21 LESS WALL/rusty 0 0.00 100.00
22 CUT SECTION 0 0.00 100.00
188
% Rej
14.23
9
8.50 % Rej
7.75
80 120.00
35.64 20.00
10
13.83 12.23 10.11 10.11 8.51 5.85 1.60 1.06 0.53
0 0.00
SHRINK EXCESS SAND COLD FETT, SLAG
AGE FETTLING DROP DAMAGE
Defect
Root cause analysis Action Taken Effectiveness
contribution
99.47
100.00
80.00
60.00 Defectives
%Rej
Cum %
40.00
20.00
0.53 0.00
14.23%
Newly occurred 9.00%
in top 10
Month No. Of Complaints
April 8
May 8
June 12
July 12
August 14
September 4
October 4
Customer Complaints
16
14
14
12 12
12
10
8 8
8 No. Of Complaints
6
4 4
4
2
0
ril ay ne Ju
ly us
t
be
r
be
r
Ap M Ju g m to
Au pt
e O c
Se
Defective Defect
Part Name Defect Root cause analysis
qty contribution
1) Ladle changing
Slag, Core 1064+742= 26.66+18.59=
frequency was 35
Inclusion 1806 45.25%
treatment.
3DU
Fett
247+121= 26.42+12.94= 1)Improper handling
Damage +
368 39.36% 2)Negligence
NGCR Excess Fett
Taco 6890
1)Low compatibility
Sand Drop 51 16.09% (40-42)
2)Improper Crush pad
Because of less
K/O
33 22.60% thickness resting pad
Damage
becoming weak
Oil Pan
Oil Pan
C/S area of down sprue
Shourt pour 27 18.49% getting reduced due to
sand fall
Dipl Cover
Excess SB 39 22.94 Negligence
Slag + 30.22+19.42
Spindle 714 Shrinkage
42+27 =69
=49.64%
Under process
SLAG/
78 20.69% Turbulent flow
inclusion
CR 22 Body
Fett 1)Improper handling
61 16.18%
Damage 2)Negligence
Contractor negligence
Side hsg LH(83) New Excess Fett 26 13.83%
Dry sand
Sand Drop 23 12.23%
Current Rejection % targeted
Action Taken Effectiveness in month Nov 2021
rejection %
6.28%
New Laddle design
Under monitering Target Decided 5.00%
implimented from 23 oct-21
5%
10.63%
1)Casting handling awareness To be monitored in November Target Decided 6.00%
given to workers 6%
2)Amount debited from the
respective contractor’s account
1) Ladle changing
Slag, Core 1064+742= 26.66+18.59=
frequency was 35
Inclusion 1806 45.25%
treatment.
3DU
Fett
247+121= 26.42+12.94= 1)Improper handling
Damage +
368 39.36% 2)Negligence
NGCR Excess Fett
Taco 6890
1)Low compatibility
Sand Drop 51 16.09% (40-42)
2)Improper Crush pad
Because of less
K/O
33 22.60% thickness resting pad
Damage
becoming weak
Oil Pan
Oil Pan
C/S area of down sprue
Shourt pour 27 18.49% getting reduced due to
sand fall
Dipl Cover
Excess SB 39 22.94 Negligence
Slag + 30.22+19.42
Spindle 714 Shrinkage
42+27 =69
=49.64%
Under process
SLAG/
78 20.69% Turbulent flow
inclusion
CR 22 Body
Fett 1)Improper handling
61 16.18%
Damage 2)Negligence
Contractor negligence
Side hsg LH(83) New Excess Fett 26 13.83%
Dry sand
Sand Drop 23 12.23%
Current Rejection % targeted
Action Taken Effectiveness in month Nov 2021
rejection %
6.28%
New Laddle design
Under monitering Target Decided 5.00%
implimented from 23 oct-21
5%
10.63%
1)Casting handling awareness To be monitored in November Target Decided 6.00%
given to workers 6%
2)Amount debited from the
respective contractor’s account