1 Akhusingh 29 Chandaka 56 Kharagprasad 82 Ranasinghpur
2 Anandpur 30 Chandikhole 57 Khariar 83 Rawmet Ferrous
3 Angul 31 Chhatrapur 58 Khurda 84 Rayagada
4 Arati Steels 32 Chhend 59 Maheswari Ispat 85 Rengali
5 Arya Iron 33 Choudwar 60 Mendhasal 86 Rourkela
6 Aryan Viraj 34 Cuttack 61(i) Meramundali 400kV 87 Saintala
7 Aska 35 Dhenkanal 61(ii) Meramundali 220kV 88 Salipur
8 Balasore 36 Digapahandi 62 Mohana 89 Sambalpur
9 Balimela 37 Duburi 63 Narendrapur 90 Shree Ganesh Metaliks
10 Balugaon 38 Ganjam 64 Nayagarh 91 Shyam DRI
11 Bargarh 39 ICCL 65(i) New Bolangir 220kV 92 Somanathpur
12 Baripada 40 Jabamayee Ferro 65(ii) New Bolangir 132kV 93 Sonepur
13 Barkote 41 Jagatsinghpur 66 New Duburi 94 Soro
14 Barpali 42 Jajpur Road 67 Nimapara 95 Sunabeda
15 Basta 43 Jajpur Town 68 Nuapatna 96 Sundargarh
16 Bee Kay Steel 44 Jaleswar 69 OCL 97 Tarkera
17 Berhampur 45(i) Jayanagar 220kV 70 OPCL 98 Tentulikhunti
18(i) Bhadrak 220kV 45(ii) Jayanagar 132kV 71 Palasponga 99 Therubali
18(ii) Bhadrak 132kV 46 Jharsuguda 72(i) Paradeep 220kV 100 Vedant Alumina
19 Bhanjanagar 47 Joda 72(ii) Paradeep 132kV
20 Bhubaneswar 48 Junagarh 73 Paralakhemundi
21 Bidanasi 49 Kalarangi 74 Patnagarh
22 Boinda 50 Kamakhyanagar 75 Pattamundai
23 Bolangir 51 Karanjia 76 Phulbani
24 Bolani 52(i) Katapali 220kV 77 Phulnakhara
25 Brajarajnagar 52(ii) Katapali 132kV 78 Puri
26 BRPL 53 Kendrapara 79 Rairakhole
27 Budhipadar 54 Kesinga 80 Rairangpur
28 Chainpal 55 Kesura 81 Rajgangpur

Compiled by the O/O - CGM (O&M), OPTCL E-Book is available for download at www.optcl.co.in
Page 1
Page 2
Page 3
Page 4
Page 5
Page 6
Page 7
Page 8
Page 9
Page 10
Page 11
Page 12
Page 13
Page 14
Page 15
Page 16
Page 17
Page 18 (i)
Page 18 (ii)
Page 19
Page 20
Page 21
Page 22
Page 23
Page 24
Page 25
Page 26
Page 27
Page 28
Page 29
Page 30
Page 31
Page 32
Page 33
Page 34
Page 35
Page 36
Page 37
Page 38
Page 39
Page 40
Page 41
Page 42
Page 43
Page 44
Page 45 (i)
Page 45 (ii)
Page 46
Page 47
Page 48
Page 49
Page 50
Page 51
Page 52 (i)
Page 52 (ii)
Page 53
Page 54
Page 55
Page 56
Page 57
Page 58
Page 59
Page 60
Page 61 (i)
Page 61 (ii)
Page 62
Page 63
Page 64
Page 65 (i)
Page 65 (ii)
Page 66
Page 67
Page 68
Page 69
Page 70
Page 71
Page 72 (i)
Page 72 (ii)
Page 73
Page 74
Page 75
Page 76
Page 77
Page 78
Page 79
Page 80
Page 81
Page 82
Page 83
Page 84
Page 85
Page 86
Page 87
Page 88
Page 89
Page 90
Page 91
Page 92
Page 93
Page 94
Page 95
Page 96
Page 97
Page 98
Page 99
Page 100
Sl. Page
Contents
No. No.
1 State & Central Sector Generators with Installed Capacities 1
2 List of IPPs / CPPs connected in OPTCL System 2-3
3 Industries with Contract Demands 4-6
4 Traction Substations with Contract Demands 7
5 EHV Substations with MVA Capacities 8-10
6 Census of EHV Transformers in OPTCL System 11
7 EHT Lines with Circuit kms. 12-19
8 Inter-Regional Lines in OPTCL System 20
9 Miscellaneous Schematic Drawings
 Single Line Diagram of OPTCL Network
 Major Generating Stations with Inter-State Tie Lines
 Inter-State Power Exchange Points
 Traction Points in OPTCL System
 Single Line Diagram of ER Transmission System
 Transmission Map of OPTCL
 Eastern Region Power Map
 Power Map of India
STATE & CENTRAL SECTOR GENERATORS WITH INSTALLED CAPACITIES
Sl. No. Name of Generating Station Installed Capacity (MW)

State Sector (HYDRO) - OHPC


2x49.5
1 Burla Power House 2x32 275.5
3x37.5
2 Chiplima Power House 3x24 72
3 Balimela Power House 6x60 + 2x75 510
4 Rengali Power House 5x50 250
5 Upper Kolab Power House 4x80 320
6 Indravati Power House 4x150 600
Machhkund Power House
7 50% of (3x17 + 3x21.25) 57.375
( Odisha Share 30%, Purchase upto 20% extra)
Sub-Total 2084.875

State Sector (THERMAL)


1 TTPS Stage - I (NTPC) 4x60 240
2 TTPS Satge - II (NTPC) 2x110 220
3 IB TPS (OPGC) 2x210 420
Sub-Total 880

Central Sector Odisha Share (MW)

1 Chukha (Bhutan) 4x84 41


2 Tala (Bhutan) 6x170 43
3 Farakka (West Bengal) 3x500 + 3x200 301.2
4 Kahalgaon (Bihar) 3x500 + 4x210 159
5 TSTPP, Kaniha (Orissa) 6x500 518
6 Tista 3x170 105
Sub-Total 1167.2

TOTAL 4132.075

Appendix Page 1
LIST OF IPPs / CPPs CONNECTED IN OPTCL SYSTEM

SL. NO. NAME OF IPP / CPP INSTALLED CAPACITY (MW) TYPE

IPP
1 Meenakshi Power Ltd. 3x4 + 2x12.5 37 HYDRO
2 Orissa Power Consortium Ltd., Samal 4x5 20 HYDRO
3 Aarati Steel ,Ghantikhal 1 x 50 50 THERMAL
4 Sterlite Energy Ltd., Jharsuguda 4 x 600 2400 THERMAL
Sub-Total 2507

CPP
1 Arati Steel Ghantikhal, Cuttack 1 x 40 40 THERMAL
2 ACC, Bargarh 1 x 30 30 THERMAL
3 Action Ispat & Power Pvt. Ltd. 1 x 12 + 1 x 25 37 THERMAL
4 Aryan Ispat & Power Pvt. Ltd. 1 x 18 18 THERMAL
5 Bhusan Steel Ltd.,Meramundali 1 x 33+1 x 77+ 2 x 150 410 THERMAL
6 Bhusan Power & Steel , Jharsuguda 1x60 + 1x40 + 2x130 + 2 x 8 376 THERMAL
7 Emami Paper Mills Ltd. 1 x 15 + 1 x 5 20 THERMAL
8 FACOR 1 x 45 45 THERMAL
9 HPCL (Hindalco), Hirakud 1 x 67.5 + 3 x 100 367.5 THERMAL
10 ICCL, Choudwar 2 x 54 + 1 x 30 138 THERMAL
11 IFFCO, Paradeep 2 x 55 110 THERMAL
12 Jindal Stainless Ltd., Duburi 2 x 125 250 THERMAL
13 Jindal Steel & Power Ltd., Angul 2 x 135 270 THERMAL
14 NINL, Duburi 2 x 19.25 + 1 x 24 62.5 THERMAL
15 Mahavir Ferro Alloys Pvt. Ltd. 1 x 12 12 THERMAL
16 Maheswari Ispat Pvt. Ltd. 2 x 12 24 THERMAL
17 Maithan Ispat Nigam Ltd., Jajpur Road 1 x 30 30 THERMAL
18 MSP Metalics Ltd. 1 x 25 25 THERMAL
19 NALCO, Angul 10 x 120 1200 THERMAL
20 Narbheram Power & Steel Pvt. Ltd. 1x8 8 THERMAL
21 NBVL, Meramundali 1 x 30 + 1x 65 95 THERMAL
22 Orissa Sponge Iron & Steel Ltd. 1 x 24 24 THERMAL
23 Pattanaik Steel, Keonjhar 1 x 15 15 THERMAL
24 Rathi Steel & Power Ltd., Katapali 1 x 20 20 THERMAL
25 RSP, Rourkela 2 x 60 + 4 x 25 220 THERMAL
26 Shyam DRI, Pandoli, Sambalpur 1 x 30 30 THERMAL
27 SMC Power Generation Ltd. 1 x 8 + 1 x 25 33 THERMAL
28 Sree Ganesh 1 x 32 32 THERMAL
29 Tata Sponge Iron, Joda 1 x 18.5 + 1 x 7.5 26 THERMAL
30 Vedanta, Jharsuguda 9 x 135 1215 THERMAL
31 Vedanta, Lanjigarh 3 x 30 90 THERMAL
32 Visa Steel Ltd., New Duburi 3 x 25 75 THERMAL
33 Yazdani Steel & Power Ltd. 1 x 10 10 THERMAL
Sub-Total 5358

Contd…

Appendix Page 2
LIST OF IPPs / CPPs CONNECTED IN OPTCL SYSTEM

SL. NO. NAME OF IPP / CPP INSTALLED CAPACITY (MW) TYPE

RENEWABLE PROJECTS
1 Abacus Holdings Pvt. Ltd 1x1 1 SOLAR
2 Aftaab Solar Pvt. Ltd. 1x5 5 SOLAR
3 Jay Iron & Steel 1x1 1 SOLAR
4 M.G.M. Minerals Ltd. 1x1 1 SOLAR
5 Molisati Vinimay Pvt. Ltd. 1x1 1 SOLAR
6 Pantime Finance Company Pvt. Ltd. 1x1 1 SOLAR
7 Raajratna Energy Pvt. Ltd. 1x1 1 SOLAR
8 S. N. Mohanty 1x1 1 SOLAR
9 Shalivahan Green Energy Ltd. 1x20 20 BIOMASS
10 Shri Mahavir Ferro Alloys Pvt. Ltd. 1x1 1 SOLAR
Sub-Total 33

TOTAL 7898

Appendix Page 3
INDUSTRIES WITH CONTRACT DEMANDS
Sl. Connected Grid Voltage Mode of Contract
Name of the Industry
No. Substation / Line Level (kV) Connectivity Demand
CENTRAL ZONE
1 MCL (NANDIRA) Angul 132 DC 31 MVA
2 FCI, Talcher Chainpal 132 SC 0.63 MVA
3 GMR Kamalanga Ltd Chainpal 33 SC 3 MVA
4 Lanco Babandha Power Ltd Chainpal 33 SC 4.444 MVA
5 IPI Steel Dhenkanal 33 SC 5.556 MVA
6 Narbheram Power & Steel (P) Ltd Dhenkanal 33 SC 5 MVA
7 Orrissa Poly Fibres Dhenkanal 33 SC 0.5 MVA
8 Maheswari Ispat Ltd Dhenkanal – ICCL 132 LILO 12 MVA
9 OCL India Ltd, Tangi ICCL – Salipur 132 LILO 12 MVA
10 IMFA, Choudwar ICCL Sw. Station 132 SC Bilateral
11 OMC, Kaliapani Kalarangi 33 SC 2 MVA
12 TISCO Kalarangi 33 SC 5 MVA
13 Sobha Metalics Kamakhyanagar 33 SC 6 MVA
14 Hind Metals & Industries (P) Ltd Kharagprasad 132 SC 15 MVA
15 Nav Bharat Ventures Ltd Kharagprasad 132 DC 3 MVA
16 Samal Metalics (P) Ltd Kharagprasad 132 SC 9 MVA
17 Shalivahana Green Energy Limited Kharagprasad 132 SC 2.2 MVA
18 Jindal Steel & Power Ltd Meramundali 400 DC 20 MW
19 Bhushan Steel & Power Ltd Meramundali 220 DC 112 MVA
20 BRG Iron & Steel Co. (P) Ltd Meramundali 132 SC 38 MVA
21 Mangilall Rungta Meramundali 132 SC 23 MVA
22 Arati Steel & Power Ltd Meramundali - Choudwar 132 LILO 10 MW
23 Rawmet Ferrous Industries Ltd Meramundali - Choudwar 132 LILO 33 MVA
24 Essar Steel India Ltd Paradeep 220 DC 15 MVA
25 IFFCO Paredeep 132 DC 11 MVA
26 Paradeep Phosphates Ltd Paredeep 132 DC 14 MVA
27 Paradeep Port Paredeep 132 DC 14 MW
28 HPCL Paradeep 33 SC 3 MVA
29 IOCL Paradeep 33 SC 10 MVA

NORTH ZONE
1 Balasore Alloys Balasore 132 SC 44 MVA
2 Birla Tyres Balasore 132 SC 6 MVA
3 Dhamara Port Company Ltd (Port) Bhadrak 132 SC 10 MVA
4 Dhamara Port Company Ltd (Railway) Bhadrak 132 SC 10 MVA
5 Facor Charge Chrome Plant Bhadrak 132 SC 34 MVA
6 Nilachal Ispat Nigam Ltd Duburi 220 SC 20 MVA
7 Misrilal Mines (P) Ltd Duburi 132 SC 5 MVA
8 TISCO, Baminipal Duburi 132 SC 30 MW
9 Brahmani River Pellets Ltd (BRPL) Duburi - MESCO 132 LILO 20 MW
10 MESCO Duburi & BRPL 132 DC 6 MVA
11 Dinabandhu Steel & Power Ltd Jajpur Road 33 SC 5 MVA
12 IDCOL Ferrochrome & Alloys Ltd Jajpur Road 33 DC 12 MW
13 Sarada Mines Pvt. Ltd. (SMPL) Joda 220/33 SC 14 MVA

Contd…

Appendix Page 4
INDUSTRIES WITH CONTRACT DEMANDS
Sl. Connected Grid Voltage Mode of Contract
Name of the Industry
No. Substation / Line Level (kV) Connectivity Demand
14 Tata Sponge Iron Ltd Joda 220 SC 7 MW
15 FMP, Joda Joda 132 SC 19.5 MVA
16 TISCO Joda 33 DC 5.5 MVA
17 Arya Iron & Steel Co. (P) Ltd Joda - Rourkela 132 LILO 10 MVA
18 Beekay Steels and Power Ltd Joda - Rourkela 132 LILO 7.7 MVA
19 Jindal Steel & Power Ltd, Barbil Joda - Jamshedpur 220 LILO 50 MW
20 SAIL, Bolani Joda - Rourkela 132 LILO 5.5 MW
21 Jindal Steel Ltd New Duburi 220 DC 50 MW
22 Maithan Ispat Ltd New Duburi 220 SC 15 MVA
23 Rohit Ferro Tech Ltd New Duburi 220 SC 56 MVA
24 Visa Steel Ltd New Duburi 220 SC 36 MVA
25 Orisa Sponge & Iron Ltd (OSIL) Palasponga 33 SC 2.5 MVA
26 Patnaik Steel and Alloys Ltd Palasponga 33 SC 1.5 MW
27 Emami Paper Mills Ltd Somanathpur 132 SC 14 MVA
28 Stork Ferro Mineral Industry (P) Ltd Somanathpur 132 SC 16.667 MVA
29 Jabamayee Ferrro Alloy Ltd TTPS-Duburi Ckt-II 132 LILO 8 MVA

SOUTH ZONE
1 IRE Chhatrapur 132 DC 6.5 MVA
2 Jayashree Chemicals Ltd Ganjam 132 SC 16 MW
3 NALCO, Damanjodi Jayanagar 132 SC Bilateral
4 Seva Paper Jayanagar 33 DC 5.1 MVA
5 HAL Sunabeda 132 SC 13.445 MVA
6 Toshali Cement, Sunki Sunabeda 33 SC 4 MVA
7 IMFA Therubali 132 SC Bilateral
8 JK Paper Therubali 132 SC 10 MW

WESTERN ZONE
1 Aryan Ispat & Power (P) Ltd Aryan-Viraj Sw. Stn 132 SC 5 MVA
2 Viraj Steel & Energy Ltd Aryan-Viraj Sw. Stn 132 SC 3 MVA
3 ACC Bargarh 132 DC 8 MVA
4 Ordnance Factory, Saintala Bolangir - Kesinga 132 LILO 4.5 MVA
5 Bhusan Power & Steel Ltd Budhipadar 220 DC 100 MW
6 SPS Steel & Power Ltd Budhipadar 220 SC 29 MVA
7 Vedanta Aluminium Ltd, Jharsuguda Budhipadar 220 DC 66.66 MVA
8 MCL Budhipadar 132 DC 22.25 MVA
9 MSP Metallics Ltd Budhipadar 132 SC 10 MVA
10 HINDALCO, Hirakud Burla PH & FRP 132 DC 20 MVA
FRP (Hirakud) Aluminium Rolling
11 Burla PH - Hindalco 132 LILO 7 MVA
Complex
12 Shree Ganesh Metaliks Ltd Chhend - Adhunik 132 LILO 1.7 MVA
13 Action Ispat & Power (P) Ltd Jharsuguda 132 SC 6 MVA
14 L&T Cement Jharsuguda 132 SC 6.8 MVA
15 Rathi Steel & Power Ltd Katapali 33 SC 4.95 MVA
16 POWMEX, Titilagarh Kesinga 132 SC 5 MVA

Contd…

Appendix Page 5
INDUSTRIES WITH CONTRACT DEMANDS
Sl. Connected Grid Voltage Mode of Contract
Name of the Industry
No. Substation / Line Level (kV) Connectivity Demand
17 OCL India Ltd Rajgangpur 132 SC 43 MVA
Intake Water Pump of M/s VAL,
18 Sambalpur 33 SC 6 MVA
Jharsuguda at Sambalpur
19 Shyam DRI Power Ltd Sambalpur - Rajgangpur 132 LILO 6 MVA
Shree Ganesh Metaliks
20 Adhunik Metaliks Ltd 132 SC 43.33 MVA
Sw. Stn.
21 RSP, Rourkela Tarkera 132 TC 100 MVA
22 Vedanta Aluminium Ltd, Lanjigarh Theruvali - Kesinga 132 LILO 15 MVA

Appendix Page 6
TRACTION SUB-STATIONS WITH CONTRACT DEMANDS
Sl. No. Traction Sub-station Connected Grid / EHT Line CD (MVA)

EAST COAST RAILWAY


1 Jagannathpur Narendrapur 14.00
2 Rambha Chhatrapur 12.00
3 Solari Balugaon 12.00
4 Kaipadar Road Khurda 15.00
5 Kendrapara Road Choudwar 13.00
6 Gorakhnath Jagatsinghpur (To be charged) 5.00
7 Joranda Dhenkanal 9.00
8 Meramundali Meramundali 8.00
9 Jakhapura Duburi 20.00
10 Bhadrak Bhadrak 13.00
11 Keonjhargarh Palasponga 20.00
12 Machhkund Rd 5.20
13 Padwa 4.50
14 Manbar 12.00
132kV Machhkund - Jayanagar Fdr
15 Maliguda 11.00
16 Jeypore Trac. 5.00
17 Ch. Kusumi 6.00

SOUTH EASTERN RAILWAY


1 Jharsuguda Jharsuguda 17.00
2 Bamra 132kV Sambalpur - RKL Ckt-III 14.50
3 Rajgangpur Rajgangpur 15.00
4 Chandiposh 220kV Rengali - Tarkera Fdr 13.00
5 Rourkela Rourkela 10.50
6 Bhalulata 132kV Joda - RKL Fdr 14.00
7 Nuagaon Chhend 9.50
8 Nalda 132kV Joda - RKL Fdr 19.50
9 Bansapani Joda 17.00
10 Balasore Balasore 14.50
11 Jaleswar Jaleswar 14.50

Appendix Page 7
EHV SUBSTATIONS WITH MVA CAPACITIES (AS ON SEP'2012)
Year of
Sl. No. Name of Substation District Installed Capacity (MVA)
Commissioning

400/220kV
2x315 MVA, 400/220 kV
2005 (400 kV)
1 Meramundali Angul 2x100 MVA, 220/132 kV
2002 (220 kV)
1x12.5 MVA, 132/33 kV
2010 (400 kV)
2 Mendhasal Khurda 2x315 MVA, 400/220 kV
2008 (220 kV)
3 New Duburi Jajpur Presently Charged at 220kV 2005

220/132/33kV
2x160 MVA, 220/132 kV 1996 (220 kV)
1 Balasore Balasore
3x40 MVA, 132/33 kV 1981 (132 kV)
2x100 MVA, 220/132 kV 2008 (220kV)
2 Bhadrak Bhadrak
3x40 MVA, 132/33 kV 1983 (132kV)
1x160+1x100 MVA, 220/132 kV
3 Bhanjanagar Ganjam 1984
1x40+1x16 MVA, 132/33 kV
2x100 MVA, 220/132 kV 2004 (220 kV)
4 Bidanasi Cuttack
3x40 MVA, 132/33 kV 1993 (132 kV)
2x160 MVA, 220/132 kV
5 Budhipadar Jharsuguda 1995
1x20+1x12.5 MVA, 132/33 kV
1x160+3x100 MVA, 220/132 kV
6 Chandaka Khurda 1989
3x40 MVA, 132/33 kV
3x100 MVA, 220/132 kV
7 Duburi Jajpur 1x40 MVA, 220/33 kV 1989
1x5 MVA, 132/33 kV
2x100 MVA, 220/132 kV
8 Jayanagar Koraput 1980
2x20+1x12.5 MVA, 132/33 kV
2x100 MVA, 220/132 kV
9 Joda Keonjhar 1959
1x40+3x20 MVA,132/33 kV
2x100 MVA, 220/132 kV 2007 (220 kV)
10 Katapali Sambalpur
1x40+2x20 MVA, 132/33 kV 2004 (132 kV)
2x160 MVA, 220/132 kV
11 Narendrapur Ganjam 1999
1x40+1x20 MVA, 132/33 kV
2x100 MVA, 220/132 kV
12 New Bolangir Bolangir 2010
1x12.5 MVA, 132/33 kV
1x160+1x100+1x50 MVA, 220/132 kV 2009 (220 kV)
13 Paradeep Jagatsinghpur
2x20+1x12.5 MVA, 132/33 kV 1981 (132 kV)

14 Tarkera Sundargarh 4x100 MVA, 220/132 kV 1981

2x100 MVA, 220/132 kV


15 Therubali Rayagada 1974
2x12.5 MVA, 132/33 kV

220/33kV
1 Balimela Malkangiri 2x20 MVA, 220/33 kV 2007
2 Barkote Deogarh 1x40+1x20 MVA, 220/33 kV 2001
3 Nayagarh Nayagarh 1x40+2x20 MVA, 220/33 kV 1993
4 Rengali Angul 1x20 MVA, 220/33 kV 1997

Contd...

Appendix Page 8
EHV SUBSTATIONS WITH MVA CAPACITIES (AS ON SEP'2012)
Year of
Sl. No. Name of Substation District Installed Capacity (MVA)
Commissioning

132/33kV
1 Akhusingh Rayagada 2x12.5 MVA, 132/33 kV 2001
2 Anandpur Keonjhar 2x12.5 MVA, 132/33 kV 2010
3 Angul Angul 1x40+1x20 MVA, 132/33 kV 1996
4 Aska Ganjam 2x40+1x20 MVA, 132/33 kV 1975
5 Balugaon Khurda 1x40+1x20+1x12.5 MVA, 132/33 kV 1991
6 Bargarh Bargarh 3x40 MVA, 132/33 kV 1979
7 Baripada Mayurbhanj 1x40+2x31.5 MVA, 132/33 kV 1984
8 Barpali Bargarh 2x12.5 MVA, 132/33 kV 2010
9 Basta Balasore 2x12.5 MVA, 132/33 kV 2010
10 Berhampur Ganjam 2x40+1x20 MVA, 132/33 kV 1964
11 Bhubaneswar Khurda 3x40 MVA, 132/33 kV 1979
12 Boinda Angul 2x12.5 MVA, 132/33 kV 2003
13 Bolangir Bolangir 2x40 MVA, 132/33 kV 1981
14 Chainpal Angul 1x40+2x20 MVA, 132/33 kV 1972
15 Chandikhole Jajpur 2x20 MVA, 132/33 kV 2003
16 Chhatrapur Ganjam 3x20 MVA, 132/33 kV 1982
17 Chhend Sundargarh 3x40 MVA, 132/33 kV 1999
18 Choudwar Cuttack 2x40+1x20 MVA, 132/33 kV 1956
19 Cuttack Cuttack 2x40 MVA, 132/33 kV 1984
20 Dhenkanal Dhenkanal 2x40 MVA, 132/33 kV 1982
21 Digapahandi Ganjam 2x20+1x12.5 MVA, 132/33 kV 2004
22 Ganjam Ganjam 2x12.5 MVA, 132/33 kV 1967
23 Jagatsinghpur Jagatsinghpur 3x20 MVA, 132/33 kV 1996
24 Jajpur Road Jajpur 1x40+2x20 MVA, 132/33 kV 1969
25 Jajpur Town Jajpur 2x40+1x20 MVA, 132/33 kV 1998
26 Jaleswar Balasore 2x20+1x12.5 MVA, 132/33 kV 1991
27 Junagarh Kalahandi 2x20 MVA, 132/33 kV 2001
28 Kalarangi Jajpur 2x12.5 MVA, 132/33 kV 1998
29 Kamakhyanagar Dhenkanal 1x20+1x12.5 MVA, 132/33 kV 1999
30 Karanjia Mayurbhanj 2x12.5 MVA, 132/33 kV 2009
31 Kendrapara Kendrapara 2x40+1x12.5 MVA, 132/33 kV 1979
32 Kesinga Kalahandi 1x40+2x20 MVA, 132/33 kV 1982
33 Kesura Khurda 1x40+1x20 MVA, 132/33 kV 2010
34 Khariar Nuapara 1x40+1x20 MVA, 132/33 kV 1995
35 Khurda Khurda 3x40 MVA, 132/33 kV 1969
36 Mohana Gajapati 1x12.5 MVA, 132/33 kV 1973
37 Nimapara Puri 1x40+2x12.5 MVA, 132/33 kV 1996
38 Nuapatna Cuttack 1x40+1x20+1x12.5 MVA, 132/33 kV 1994
39 Paralakhemundi Gajapati 2x12.5 MVA, 132/33 kV 2001
40 Patnagarh Bolangir 1x20+2x12.5 MVA, 132/33 kV 2001
41 Pattamundai Kendrapara 2x20+1x12.5 MVA, 132/33 kV 1997
42 Phulbani Kandhamala 1x40+2x12.5 MVA, 132/33 kV 1986
43 Phulnakhara Cuttack 1x20 MVA, 132/33 kV 2009
44 Palasponga Keonjhar 1x40+2x20 MVA, 132/33 kV 1981
45 Puri Puri 1x40+2x31.5 MVA, 132/33 kV 1984

Contd…

Appendix Page 9
EHV SUBSTATIONS WITH MVA CAPACITIES (AS ON SEP'2012)
Year of
Sl. No. Name of Substation District Installed Capacity (MVA)
Commissioning
46 Rairakhole Sambalpur 2x12.5 MVA, 132/33 kV 2001
47 Rairangpur Mayurbhanj 1x20+1x12.5 MVA, 132/33 kV 1981
48 Rajgangpur Sundargarh 2x40 MVA, 132/33 kV 1973
49 Ranasinghpur Khurda 3x40 MVA, 132/33 kV 1997
50 Rayagada Rayagada 2x12.5 MVA, 132/33 kV 1962
51 Saintala Bolangir 1x12.5+1x10 MVA, 132/33 kV 1989
52 Salipur Cuttack 2x20+1x12.5 MVA, 132/33 kV 2006
53 Sambalpur Sambalpur 1x40+2x31.5 MVA, 132/33 kV 1988
54 Sonepur Sonepur 1x20+2x12.5 MVA, 132/33 kV 2001
55 Soro Balasore 1x40+2x20 MVA, 132/33 kV 1997
56 Sunabeda Koraput 3x12.5 MVA, 132/33 kV 1964
57 Sundargarh Sundargarh 1x40+1x20 MVA, 132/33 kV 2003
58 Tentulikhunti Nabarangpur 3x12.5 MVA, 132/33 kV 1986

132/33/25kV
4x35 MVA, 132/33 kV
1 Rourkela Sundargarh 1958
1x12.5 MVA, 132/25 kV

132/33/11kV
3x20 MVA, 132/33 kV
1 Brajarajnagar Jharsuguda 1969
1x12.5 MVA, 132/11 kV

132/11kV
1 Bolani Keonjhar 2x10 MVA, 132/11 kV 1995
2 Jharsuguda Jharsuguda 1x20+1x12.5 MVA, 132/11 kV 1958

132kV Switching Stations


1 Arati Steels Cuttack 2005
2 Arya Iron Keonjhar 2008
3 Aryan-Viraj Sambalpur 2009
4 Bee Kay Steel Keonjhar 2010
5 Brahmani River Pellets Jajpur 2011
6 ICCL Cuttack 1988
7 Jabamayee Ferro Alloys Jajpur 2008
8 Kharagprasad Dhenkanal 2007
9 Maheswari Ispat Cuttack 2006
10 OCL Cuttack 2008
11 OPCL Angul 2009
12 Rawmet Ferrous Cuttack 2006
13 Shree Ganesh Metaliks Sundargarh 2011
14 Shyam DRI Sambalpur 2006
15 Somanathpur Balasore 2011
16 Vedant Alumina Kalahandi 2006

TOTAL SUB-STATIONS
100 10,642.50

Appendix Page 10
CENSUS OF EHV TRANSFORMERS IN OPTCL SYSTEM (AS ON SEP'12)

No. of
Voltage Ratio Rating Total Installed
Transformers
(kV) (MVA) Capacity (MVA)
installed
400/220 kV
315 4 1,260
(ICT)
160 9 1,440
220/132 kV 100 28 2,800
(AUTO) 50 1 50
Sub-Total 38 4,290
40 3 120
220/33 KV 20 6 120
Sub-Total 9 240
40 65 2,600
35 4 140
31.5 6 189
20 57 1,140
16 1 16
132/33 kV
12.5 54 675
10 1 10
7.5 0 0
5 1 5
Sub-Total 189 4,775
132/25 kV
12.5 1 12.5
(Traction Trf.)
20 1 20
12.5 2 25
132/11 kV
10 2 20
Sub-Total 5 65.0
TOTAL 246 10,642.5

Appendix Page 11
EHT LINES WITH CIRCUIT KMS. (AS ON SEP'2012)
Year of
Sl. No. Name of EHT Line Zone Route kms. Ckt. kms.
Comm.
400kV

400 kV Meramundali - Mendhasala DC (Ckt-II charged at


1 Central 100.451 200.902 2003
220kV for P/S to Bidanasi & Chandaka)
2 400 kV Meramundali - JSPL DC Central 37.916 75.832 2010
400 kV Rengali - Kolaghat SC (Orissa Portion)
3 North 241.500 241.500 1995
(Loc. No. 1 to 663)
Sub-Total 379.867 518.234

220kV

220 kV Bhanjanagar - Meramundali DC


1 Central 58.675 117.350 1967
(Loc. No. 196 up to Meramundali)
2 220 kV Bidanasi LILO DC (Godi Sahi - Bidanasi) Central 10.991 21.982 2003
3 220 kV Duburi New - Paradeep DC Central 113.433 226.866 2009
4 220 kV Kaniha - Meramundali DC Central 42.520 85.040 1995
220 kV Link DC (From Meramundali S/S to 400 kV
5 Central 1.500 3.000 2003
Meramundali - Mendhasala Line)
6 220 kV Mendhasala - Chandaka DC (Ckt - I & II) Central 7.260 14.520 2003
220 kV Mendhasala LILO DC
7 Central 5.958 11.916 2008
(Bhanjanagr - Nayagarh - Mendhasala)
220 kV Mendhasala LILO DC
8 Central 6.040 12.080 2008
(Mendhasala - Chandaka Ckt - III & IV)
2006 (Ckt-I)
9 220 kV Meramundali – Bhusan Steel DC Central 2.400 4.800
2011 (Ckt-II)
10 220 kV Meramundali - Duburi DC Central 95.556 191.112 1995
11 220 kV NALCO - Meramundali DC Central 11.465 22.930 2004
12 220 kV NALCO - Rengali PH SC Central 62.700 62.700 1984
13 220 kV NALCO - TTPS SC Central 8.637 8.637 1984
220 kV Narendrapur - Mendhasala DC (Balugaon to
14 Central 90.000 180.000 2010
Mendhasala)
15 220 kV Nayagarh - Chandaka DC Central 80.500 161.000 1989
16 220 kV Paradeep - Essar Steel DC Central 8.868 17.736 2012
17 220 kV Rengali - Rengali PGCIL DC Central 1.000 2.000 1997
18 220 kV Rengali - Tarkera DC (Loc. 188 to 306) Central 34.680 69.360 1979
19 220 kV Rengali PH - Kaniha SC Central 29.500 29.500 1984
20 220 kV Rengali PH - Rengali DC Central 5.000 10.000 1997
220 kV TTPS - Joda DC
21 Central 70.000 140.000 1967
(Loc. No. 1 to 234)
22 220 kV TTPS - Kaniha SC Central 34.500 34.500 1984
220 kV TTPS - Meramundali DC
23 Central 11.155 22.310 1967
(Loc. No. 1 to 45)
24 220 kV Bhadrak LILO DC North 1.432 2.864 2008
25 220 kV Duburi - Duburi New DC North 6.384 12.768 1996
26 220 kV Duburi - NINL SC North 5.580 5.580 2000
27 220 kV Duburi New – Balasore DC North 137.894 275.788 1996
220 kV Joda - Jamshedpur SC
28 North 32.000 32.000 1985
(Loc. No. 316 to 435)

Contd…

Appendix Page 12
EHT LINES WITH CIRCUIT KMS. (AS ON SEP'2012)
Year of
Sl. No. Name of EHT Line Zone Route kms. Ckt. kms.
Comm.
29 220 kV Joda - Ramchandrapur SC North 15.500 15.500 1985
30 220 kV Joda - TSIL SC North 7.300 7.300 2007
31 220kV JSPL LILO DC (Joda - Jamshedpur Line) North 4.800 9.600 2010
32 220 kV Kuchei - Balasore DC North 76.859 153.718 2007
220 kV TTPS - Joda DC
33 North 84.000 168.000 1967
(Loc. No. 235 to 503)
34 220 kV Balimela PH - Balimela SC South 0.200 0.200 2008
220 kV Bhanjanagar - Meramundali DC
35 South 80.500 161.000 1974
(Loc. No. 197 to 470)
220 kV Bhanjanagar - Nayagarh DC
36 South 68.590 137.180 1989
(Loc. No. 1 to 230)
37 220 kV Jayanagar - Balimela - III SC South 93.460 93.460 1982
38 220 kV Jayanagar - Balimela DC South 92.072 184.144 1974
39 220 kV Jayanagar - PGCIL DC South 7.730 15.460 1990
40 220 kV Jayanagar - Therubali - III SC South 123.000 123.000 1984
41 220 kV Jayanagar - Therubali DC South 123.200 246.400 1974
42 220 kV Jayanagar - Upper Kolab DC South 6.000 12.000 1987
220 kV Narendrapur - Mendhasala DC (Upto Balugaon)
43 South 84.000 168.000 2004
(One Ckt charged at 132kV for P/S to Khurda Grid S/S)
220 kV Therubali - Bhanjanagar DC
44 South 104.800 209.600 1974
(Loc. No. 471 to 827)
220 kV Therubali - Bhanjanagar DC
45 South 66.660 133.320 1974
(Loc. No. 828 to 1049)
46 220 kV Therubali - Indravati DC (I & II) South 86.148 172.296 2001
47 220 kV Therubali - Indravati DC (III & IV) South 91.000 182.000 2007
220 kV Therubali - Narendrapur DC
48 South 88.270 176.540 1999
(Loc. No. 1 to 293)
220 kV Therubali - Narendrapur DC
49 South 107.800 215.600 1999
(Loc. No. 293 to 656)
50 220 kV Barkote LILO DC West 0.896 1.792 2001
51 220 kV Budhipadar - Basundhara SC West 35.293 35.293 2012
52 220 kV Budhipadar - Bhusan DC West 14.920 29.840 2005
53 220 kV Budhipadar - IB DC (Ckt - I & II) West 26.000 52.000 1995
54 220 kV Budhipadar - IB DC (Ckt - III & IV) West 25.280 50.560 2008
55 220 kV Budhipadar – Katapali DC West 61.716 123.432 2007
56 220 kV Budhipadar – Korba DC West 60.000 120.000 1997
57 220 kV Budhipadar - SPS DC West 7.100 14.200 2007
220 kV Budhipadar - Tarkera DC
58 West 66.452 132.904 1995
(Bamra to Tarkera, Loc. No. 121 to 328)
220 kV Budhipadar - Tarkera DC
59 West 43.386 86.772 1995
(Upto Bamra + Loc. No. 1 to 120)
60 220 kV Chandiposh Traction DC West 5.200 10.400 2000
2010 (Ckt-I)
61 220 kV Katapali – New Bolangir DC West 117.847 235.694
2011 (Ckt-II)

Contd…

Appendix Page 13
EHT LINES WITH CIRCUIT KMS. (AS ON SEP'2012)
Year of
Sl. No. Name of EHT Line Zone Route kms. Ckt. kms.
Comm.
62 220 kV Tarkera - Bisra (PGCIL) DC West 15.335 30.670 1993
220 kV Tarkera - Rengali DC
63 West 117.000 234.000 1979
(Loc. No. 307 to 645)
Sub-Total 2,983.942 5,520.214

132kV

1 132 kV Angul - Boinda SC Central 38.500 38.500 1963


2 132 kV Angul - Chainpal SC Central 14.931 14.931 2001
3 132 kV Angul - MCL DC Central 10.826 21.652 1994
4 132 kV Angul - TTPS SC Central 16.000 16.000 1963
5 132 kV Arati Steels LILO DC Central 11.011 22.022 2005
132 kV Badagada 'T' SC
6 Central 21.090 21.090 2010
(Chandaka – Nimapara Line)
7 132 kV Balugaon – Solari TSS SC Central 14.500 14.500 2001
8 132 kV Balugaon LILO DC Central 9.135 18.270 1991
132 kV Bhubaneswar - Cuttack SC
9 Central 19.800 19.800 1984
(Loc. 1 - 71)
132 kV Bidanasi - Chandaka SC
10 Central 12.814 12.814 1969
(Loc. No. 52 to 90 - 24 - 22)
11 132 kV Bidanasi - Chandaka SC (Loc. 1 - 51) Central 14.621 14.621 1969
12 132 kV Bidanasi LILO DC (Loc. 1 - 22) Central 6.800 13.600 1993
132 kV Chainpal - Choudwar Ckt - I SC
13 Central 42.700 42.700 1958
(Loc. No. 148 to 285)
132 kV Chainpal - Choudwar Ckt - I SC
14 Central 43.200 43.200 1958
(Loc. No. 1 to 147)
132 kV Chainpal - Choudwar Ckt - II SC
15 Central 47.300 47.300 1972
(Loc. No. 152 to 314 via ICCL)
132 kV Chainpal - Choudwar Ckt - II SC
16 Central 43.780 43.780 1972
(Loc. No. 1 to 151)
17 132 kV Chainpal - FCI DC Central 7.000 14.000 1975
18 132 kV Chandaka - Bhubaneswar Ckt-I SC Central 5.500 5.500 1979
19 132 kV Chandaka - Bhubaneswar Ckt-II SC Central 5.400 5.400 1979
20 132 kV Chandaka - Khurda SC Central 36.500 36.500 1969
21 132 kV Chandaka – Nimapara SC (in DC tower) Central 62.000 62.000 1996
22 132 kV Chandaka – Ransinghpur SC (in DC tower) Central 24.310 24.310 1997
23 132 kV Chandikhole LILO DC Central 1.630 3.260 2003
132 kV Choudwar - Bidanasi SC
24 Central 8.614 8.614 1969
(Loc. No. 22 - 23 - 91 to 118)
25 132 kV Choudwar – Kendrapara Road Traction SC Central 4.600 4.600 2008
26 132 kV Cuttack - Jagatsinghpur SC Central 35.112 35.112 1996
27 132 kV Dhenkanal - Joranda Traction SC Central 19.345 19.345 2005
28 132 kV Dhenkanal - Nuapatna SC Central 37.116 37.116 1994
29 132 kV Kharagprasad - NBVL DC Central 0.577 1.154 2005
30 132 kV Kharagprasad - Meramundali Traction SC Central 1.170 1.170 2003
31 132 kV Kharagprasad - Samal Metalic SC Central 1.030 1.030 2010

Contd…

Appendix Page 14
EHT LINES WITH CIRCUIT KMS. (AS ON SEP'2012)
Year of
Sl. No. Name of EHT Line Zone Route kms. Ckt. kms.
Comm.
32 132 kV ICCL – Salipur SC (in DC Towers) Central 25.815 25.815 2006
132 kV Jagatsinghpur - Gorakhnath Traction SC (in DC
33 Central 16.530 16.530 2011
Towers)
132 kV Jajpur Road - Kendrapara DC
34 Central 63.110 126.220 1979
(Loc. 1 - 208)
35 132 kV Kamakhya Nagar LILO DC Central 1.000 2.000 1999
132 kV Kendrapara - Paradeep DC
36 Central 34.774 69.548 1981
(Loc. 209 - 326)
37 132 kV Kendrapara - Pattamundai SC (in DC Towers) Central 19.500 19.500 1997
38 132 kV Khurda - Balugaon SC Central 68.566 68.566 1978
39 132 kV Khurda - Kaipadar Traction SC Central 11.259 11.259 2002
40 132 kV Khurda – Puri SC Central 57.570 57.570 1984
41 132 kV Maheswari Ispat LILO DC Central 4.888 9.776 2006
42 132 kV Meramundali - BRG Steel SC Central 3.550 3.550 2007
43 132 kV Meramundali - Kharagprasad DC Central 5.517 11.034 2005
44 132 kV Meramundali - ML Rungta SC Central 7.468 7.468 2007
132 kV Meramundali LILO DC
45 Central 1.735 3.470 2007
(Chainpal - Meramundali)
132 kV Meramundali LILO DC
46 Central 1.735 3.470 2007
(Meramundali - Choudwar)
47 132 kV Nimapara - Puri DC Central 30.000 60.000 1998
48 132 kV OCL LILO DC Central 15.869 31.738 2008
49 132 kV OPCL LILO DC Central 23.000 46.000 2009
50 132 kV Paradeep - IFFCO DC Central 7.171 14.342 1999
51 132 kV Paradeep - PPL DC Central 6.205 12.410 2000
52 132 kV Paradeep - PPT DC Central 7.659 15.318 2001
132 kV Phulnakhara LILO DC (Bhubaneswar - Cuttack
53 Central 11.798 23.596 2009
Line)
132 kV Ranasinghpur 'T' SC
54 Central 1.330 1.330 2000
(Chandaka – Nimapara Line)
55 132 kV Rawmet Ferrous LILO DC Central 8.780 17.560 2007
56 132 kV TTPS - Chainpal - I SC Central 3.000 3.000 1968
57 132 kV TTPS - Chainpal - II & III DC Central 3.000 6.000 1980
58 132 kV Arya Iron LILO DC North 0.470 0.940 2008
59 132 kV Balasore - Baripada SC North 57.300 57.300 1984
60 132 kV Balasore - Bhadrak SC North 74.195 74.195 1980
61 132 kV Balasore – Birla Tyres SC North 2.598 2.598 1991
62 132 kV Balasore - EMAMI Paper SC North 8.571 8.571 2008
63 132 kV Balasore - Balasore Alloys SC North 6.450 6.450 1986
64 132 kV Balasore - Jaleswar SC North 55.772 55.772 1991
65 132 kV Balasore - Traction SC North 3.565 3.565 2005
66 132 kV Baripada - Rairangpur SC North 76.386 76.386 1984
67 132 kV Basta LILO DC North 0.536 1.072 2010

Contd…

Appendix Page 15
EHT LINES WITH CIRCUIT KMS. (AS ON SEP'2012)
Year of
Sl. No. Name of EHT Line Zone Route kms. Ckt. kms.
Comm.
68 132 kV Bee Kay Steel LILO DC North 2.400 4.800 2010
69 132 KV Bhadrak – Dhamara Port SC (in DC Towers) North 64.700 64.700 2010
70 132 kV Bhadrak - Dhamra Traction SC (in DC Towers) North 35.700 35.700 2011
71 132 kV Bhadrak - FACOR SC North 4.564 4.564 1983
72 132 kV Bhadrak - Traction SC North 8.086 8.086 2003
132 kV Bolani DC ('T' between Loc. No. 270 & 271 of Joda
73 North 7.880 15.760 1995
– Nalda Line)
74 132 kV Brahamani River Pellets LILO DC North 2.780 5.560 2011
75 132 kV Duburi - Baminipal SC North 20.974 20.974 1985
76 132 kV Duburi - Jajpur Road DC North 13.200 26.400 1969
77 132 kV Duburi - Jakhapura Traction SC North 12.851 12.851 2005
78 132 kV Duburi - MESCO DC North 6.650 13.300 2000
79 132 kV Jabamayee Ferro Alloys LILO DC North 0.738 1.476 2008
80 132 kV Jajpur Road - Anandpur SC (in DC Towers) North 30.000 30.000 2010
81 132 kV Jaipur Road - Bhadrak SC North 44.932 44.932 1979
82 132 kV Jajpur Town LILO DC North 10.519 21.038 1998
83 132 kV Jaleswar - Traction SC North 2.340 2.340 2002
84 132 kV Joda - Bansapani Traction SC North 2.990 2.990 2012
85 132 kV Joda - FAP SC North 0.060 0.060 2003
86 132 kV Joda - Kenduposi SC North 49.900 49.900 1985
132 kV Joda - Nalda - Bhalulata SC
87 North 59.000 59.000 1959
(Loc. No. 78 to 298)
132 kV Joda - Palasponga - Rairangpur SC
88 North 37.000 37.000 1981
(Loc. No. 1 to 111)
89 132 kV Kalarangi LILO DC North 13.020 26.040 1998
90 132 kV Karanjia LILO DC North 23.514 47.028 2009
132 kV Kuchei LILO DC
91 North 1.100 2.200 2005
(Baripada - Rairangpur Line)
92 132 kV Polasponga - Keonjhargarh Traction SC North 19.433 19.433 2011
93 132 kV Polasponga LILO DC (Loc. No. 73/1 to 73/6) North 18.000 36.000 1981
132 kV Polasponga - Rairangpur SC
94 North 79.100 79.100 1980
(Loc. No. 111 to 336)
95 132 kV Soro LILO DC North 1.010 2.020 1997
96 132 kV TTPS - Duburi DC North 86.800 173.600 1969
97 132 kV Akhusingh - Parlakhemundi SC South 76.900 76.900 2001
98 132 kV Aska - Berhampur SC South 33.960 33.960 1980
99 132 kV Aska - Chhatrapur DC South 43.825 87.650 1982
100 132 kV Berhampur - Mohana SC South 58.000 58.000 1962
101 132 kV Bhanjanagar - Aska DC South 33.720 67.440 1980
102 132 kV Bhanjanagar – Phulbani SC South 86.500 86.500 1986
103 132 kV Chhatrapur - Balugaon SC South 54.190 54.190 1982
104 132 kV Chhatrapur - Ganjam SC South 12.600 12.600 1968

Contd…

Appendix Page 16
EHT LINES WITH CIRCUIT KMS. (AS ON SEP'2012)
Year of
Sl. No. Name of EHT Line Zone Route kms. Ckt. kms.
Comm.
105 132 kV Chhatrapur - Rambha TSS SC South 28.904 28.904 2003
106 132 kV Chhatrapur- IRE DC South 5.800 11.600 1981
107 132 kV Digapahandi LILO DC South 1.882 3.764 2003
108 132 kV Jayanagar - Damanjodi SC South 45.272 45.272 1986
109 132 kV Jayanagar - Meenakshi Power SC South 53.200 53.200 2009
110 132 kV Jayanagar - Rayagada SC South 110.000 110.000 1956
111 132 kV Jayanagar - Sunabeda SC South 40.000 40.000 1970
112 132 kV Jayanagar - Tentulikhunti SC South 56.400 56.400 1985
113 132 kV Machkund PH - Jayanagar (RE Line) SC South 148.000 148.000 1982
114 132 kV Machkund PH - Jayanagar SC South 43.000 43.000 1956
132 kV Manbar - Jayangar Diversion SC
115 South 7.106 7.106 2007
(Loc. No. 258 to 278)
116 132 kV Narendrapur - Berhampur DC South 10.910 21.820 2004
117 132 kV Narendrapur - Chatrapur DC South 13.282 26.564 2004
118 132 kV Narendrapur - Jagannathpur TSS SC South 0.540 0.540 2000
119 132 kV Rayagada - Akhusingh – Mohana SC South 120.000 120.000 1962
120 132 kV Rayagada - VBC Ferro SC South 0.300 0.300 2005
121 132 kV Sunabeda - Damanjodi SC South 13.000 13.000 1985
122 132 kV Sunabeda - HAL SC South 0.700 0.700 2005
123 132 kV Therubali - IMFA SC South 2.000 2.000 1992
124 132 kV Therubali - JK Paper SC South 9.680 9.680 1998
125 132 kV Therubali - Rayagada SC South 20.000 20.000 1967
132 kV Aryan - Viraj LILO DC
126 West 0.470 0.940 2009
(Burla PH - Rajgangpur - Rourkela Ckt)
127 132 kV Bamra Traction DC West 5.000 10.000 1998
128 132 kV Bargarh - ACC DC West 2.870 5.740 1993
129 132 kV Bargarh - Bolangir SC West 79.700 79.700 1981
130 132 kV Barpali LILO DC West 3.357 6.714 2009
131 132 kV Bhalulata Traction SC 'T' off West 2.710 2.710 1999
132 132 kV Bolangir - Patnagarh SC West 39.805 39.805 2001
133 132 kV Bolangir - Saintala SC West 39.980 39.980 1980
134 132 kV Bolangir - Sonepur SC West 53.845 53.845 2001
135 132 kV Budhipadar - Brajrajnagar SC West 11.745 11.745 1995
136 132 kV Budhipadar - Jharsuguda SC West 7.000 7.000 1995
137 132 kV Budhipadar - MCL DC West 23.000 46.000 2000
138 132 kV Budhipadar - MSP Metallics SC West 0.592 0.592 2008
139 132 kV Budhipadar - Sundargarh DC West 29.920 59.840 2003
132 kV Budhipadar - Tarkera Ckt - I SC
140 West 29.000 29.000 1995
(Rajgangpur to Tarkera, Loc. No. 1 to 88)
132 kV Budhipadar - Tarkera Ckt - II SC
141 West 29.000 29.000 1995
(Rajgangpur to Tarkera, Loc. No. 1 to 89)

Contd…

Appendix Page 17
EHT LINES WITH CIRCUIT KMS. (AS ON SEP'2012)
Year of
Sl. No. Name of EHT Line Zone Route kms. Ckt. kms.
Comm.
132 kV Budhipadar - Tarkera DC
142 West 37.000 74.000 1995
(Bamra to Rajgangpur, Loc. No. 283 to 410)
132 kV Budhipadar - Tarkera DC
143 West 44.000 88.000 1995
(Up to Bamra, Loc. No. 164 to 283)
144 132 kV Burla PH - Boinda SC West 129.700 129.700 1963
145 132 kV Burla PH - Budhipadar DC West 57.331 114.662 1958
146 132 kV Burla PH - Chiplima PH DC West 20.000 40.000 1979
147 132 kV Burla PH - HINDALCO DC West 9.000 18.000 1958
132 kV Burla PH - Rajgangpur - Rourkela Ckt
148 West 18.730 18.730 1958
(Loc. J1 - J65)
132 kV Burla PH - Rajgangpur - Rourkela Ckt
149 West 32.000 32.000 1958
(Loc. J65 – 171)
132 kV Burla PH - Rajgangpur - Rourkela Ckt
150 West 42.000 42.000 1958
(Loc. 171 - 294)
132 kV Burla PH - Rajgangpur - Rourkela Ckt
151 West 66.000 66.000 1958
(Loc. 294 - 430 - 526, Bamra to Rourkela)
152 132 kV Chhend - Adhunik Metalics SC West 21.000 21.000 2005
153 132 kV Chhend - Nuagaon TSS SC West 35.000 35.000 2004
154 132 kV Chiplima PH - Bargarh SC West 29.600 29.600 1979
155 132 kV Jharsuguda - Action Ispat SC West 1.600 1.600 2012
156 132 kV Jharsuguda - L&T DC West 15.700 31.400 1995
157 132 kV Jharsuguda - Traction SC West 0.150 0.150 1995
132 kV Katapali LILO DC
158 West 12.660 25.320 2007
(Chiplima PH - Bargarh Line)
132 KV Katapali LILO DC
159 West 8.471 16.942 2010
(Burla PH – Sambalpur – Boinda Line)
160 132 kV Kesinga – Junagarh SC West 52.548 52.548 2001
161 132 kV Kesinga – Khariar SC West 58.500 58.500 1995
162 132 kV Kesinga – Powmax (Turla) SC West 14.532 14.532 1982
163 132 kV Kesinga - Saintala SC West 33.200 33.200 1980
132 kV New Bolangir LILO DC
164 West 0.492 0.984 2010
(Bolangir - Patnagarh Ckt)
165 132 kV Rajgangpur - OCL SC West 0.500 0.500 1973
166 132 kV Rajgangpur - Traction DC West 2.100 4.200 1973
132 kV Rajgangpur LILO DC
167 West 1.200 2.400 2006
(Budhipadar - Tarkera Ckt-II)
132 kV Rairakhole LILO DC
168 West 0.500 1.000 2001
(Burla PH - Sambalpur - Boinda Line)
132 kV Rourkela - Nalda SC
169 West 24.290 24.290 1959
(Up to Bhalulata, Loc. No. 1 to 78)
132 kV Sambalpur LILO DC
170 West 6.930 13.860 1988
(Burla PH - Rajgangpur - Rourkela Ckt)
132 kV Sambalpur 'T' SC
171 West 0.386 0.386 2005
(Burla PH - Rairakhole - Boinda Line)
132 kV Shyam DRI LILO DC
172 West 1.900 3.800 2006
(Burla PH - Rajgangpur - Rourkela Ckt)
132 kV Shree Ganesh Metaliks LILO DC
173 West 1.720 3.440 2011
(Chhend - Adhunik Metalics Ckt)

Contd…

Appendix Page 18
EHT LINES WITH CIRCUIT KMS. (AS ON SEP'2012)
Year of
Sl. No. Name of EHT Line Zone Route kms. Ckt. kms.
Comm.
174 132 kV Tarkera - Chend DC West 6.165 12.330 1999
175 132 kV Tarkera - Rourkela Ckt - I SC West 3.000 3.000 1958
176 132 kV Tarkera - Rourkela Ckt - II SC West 3.000 3.000 1958
177 132 kV Tarkera - RSP DC West 11.040 22.080 1981
178 132 kV Tarkera - RSP III SC West 10.000 10.000 2008
179 132 kV Therubali - Kesinga SC West 106.425 106.425 1982
180 132 kV Vedant Alumina LILO DC West 12.403 24.806 2006
Sub-Total 4,421.263 5,305.748

S U M M A R Y
Voltage Category Route kms. Ckt. kms.
400kV 379.867 518.234
220kV 2,983.942 5,520.214
132kV 4,421.263 5,305.748
Total 7,785.072 11,344.196

Appendix Page 19
INTER-REGIONAL LINES IN OPTCL SYSTEM
Maintenance
Sl. No. Line Circuits Route kms Ckt kms.
Jurisdiction
1 220kV Jayanagar-Jayanagar PGCIL 2 7.730 15.460 OPTCL
2 400kV Jayanagar PGCIL-Meramundali 1 PGCIL
3 400kV Indravati PH-Indravati PGCIL 1 3.701 3.701 OPTCL
4 220kV Budhipadar-Korba DC 2 60.000 120.000 OPTCL
5 220kV Budhipadar-Korba SC 1 PGCIL
6 220kV Tarkera-Bisra 2 15.335 30.670 OPTCL
7 220kV Joda-RCPur (JSEB) 1 15.500 15.500 OPTCL
8 220kV Joda-JSPL-Jamshedpur (DVC) 1 32.000 32.000 OPTCL
9 132kV Joda-Kenduposi (JSEB) 1 49.900 49.900 OPTCL
10 220kV Kaniha-Meramundali 2 42.520 85.040 OPTCL
11 400kV Kaniha-Meramundali 2 PGCIL
12 400kV Kuchei-Mendhasala 2 PGCIL
13 220kV Rengali PH-Kaniha 1 29.500 29.500 OPTCL
14 220kV Kaniha-TTPS 1 34.500 34.500 OPTCL
15 220kV Rengali OPTCL-Rengali PGCIL 2 1.000 2.000 OPTCL
16 220 kV Kuchei - Balasore 2 76.859 153.718 OPTCL
17 132kV Kuchei-Rairangpur 1 65.180 65.180 OPTCL
18 132kV Kuchei-Baripada 1 11.653 11.653 OPTCL
Total 26

Appendix Page 20
SINGLE LINE DIAGRAM OF OPTCL NETWORK KUCHEI KOLAGHAT
(BARIPADA)
BUDHIPADAR JAMSHEDPUR(PG)
1x160/
SPS
KORBA (MP) 2x315 119 MW
(WR System) 38 /60 BEEKAY PALASPONGA
26 2x315 5.5 .Tr 12 50/80
RAIPUR PG STEEL ARYA 4.5/ 20 OSISL KARANJIA BARIPADA
BARKOTE PATNAIK
420 MW ITPS (WR system)
NALDA (TR)
1 9 BALANI 24MW/ 71/ 103
14/ 34.1 STEEL 17/ 25 RAIRANGPUR
22 5
BISRA PG BISRA BANSAPANI Tr. BALASORE 72/120
TRACTION 15 DUBURI(N) Somanathpur
JAMSHEDPUR(DVC) 2x25VISA17 20/ 32.5
BHUSAN CPP 3 FMP SF Alloys
B.NAGAR MSP 105/ 140 33.5 18 43 BALASORE
37 BHALULATA
JSPL 9 MAITHAN EMAMI
ROURKELA 9 JINDAL STEEL
60/ 72.5
GOELKERA (TR.)
SARADA KENDUPOSI ROHIT 25 2x160 / 3 /11
11 SUNDARGARH
(40+60+130+2x8)MW VEDANTA MCL 18.5+7.5 MW (BSEB) DUBURI 2 x 125 240 MW
40/60
20 220 MW R.S.P. 119 2x19.25MW NINL charged at 132kV TRACTION
135 x 9 MW 58/100
C 15
0.04 TSIL 2x100 / JODA Bal. Alloys
600 x 4 41
144MW 20MW
13 R.C.PUR 4.3 DUBURI BIRLA TYRES
2 x 160 / GMR
20/ 32.5 TARKERA 4x100 / PG 25/40 MESCO FACOR 6
268 MW 9 BSL 410 MW JALESWAR
300MW JODA 4.5 31 45/52.5
VEDANTA BUDHIPADAR TRACTION Traction
JHARSUGUDA 104 15
SORO TRACTION
3000 MW 2x100/

C
6 22/32.5 2x315
L&T BASTA ESSAR
KESINGA /490 146 MW 3x100/ 90 52/100
16 BURLA 4 JPUR 2x100/ 48/80 22/25 3
45/ 80 TRACTION MW
JUNAGARH 0.02 CHANIPOSH JSPL 140 MW 13
26/ 40 ACTION Adhunik TARKERA R0.4 BRG 15
TOWN BDR.Tr PARADEEP
ISPAT 25+12 MW 40 STPS G 3x135 33/ 52.5IFFCO
2x315 2x55MW/ 8
POWMEX HINDALCO Sri Ganesh HM SW
1.5 BHADRAK DHAMRA
3 20 NBVL 0.14 82/120 5
BOLANGIR(O) R.GANGPUR JAJPUR RD 310 /
CHHEND M.MUNDALI CHANDIKHOL 13 PPL
52/80 275.5 MW 50/ 80 148 MW
KHARIAR SONEPUR 65/ 80 74/120 30+65 HIND 5
38/ 60 3x100+1x67.5 MW 33/40
30/45 8/20 STPS TTPS-II 220MW
OCL STPS METALS
PPT
CHIPLIMA 72 MW SHYAM DRI 33 250MW TRACTION ANANDAPUR
SAINTALA BARPALI 24/ 32.5 5 14
4.5 / 22.5 21/25
21/25 SAMBALPUR 15 JFAL PATAMUNDAI
BARGARH 71/103 TRACTION 5.5 J.PURA Tr
72/ 120 240MW 18 30/52.5
1x30 MW 15 K.NAGAR 45/ 92.5
BOLANGIR(N) 2.1 C 16/ 25 B.PAL
2x100 / ACC RENGALI - PH 22 KENDRAPAD A
KATAPALI
8 2x315 ARATI STEEL

charged at 220kV
162 MW 30/45 BAMRA (TR) 4x5
41/80 OPCL 18/ 25 5 RAWMET CHOUDWAR
5.6 16/20
1.5 KALRANGI

C
2x15 MW 2x160 25 50/100
PATNAGARH RENGALI (PG) RENGALI S/Y
54/ 80 DHENKANAL NUAPATNASALIPUR
1200 MW NALCO
ANGUL 45/72.5 26/52.5 ICCL
1x18 MW 3 JORONDA Tr
12 VEDANTA (LANJIGARH) 2x100 / ARYAN ISPAT 28 31/60 CHAINPAL
KATAPALI NANDIRA MAHESWARI 9
3x30 MW 112 MW 52/ 80 13 OCL 108MW
INDRAVATI 0.54/8
11/25
5\8
RAIRAKHOL 20/25 TTPS-I NARBHERAM BIDANASI
BOINDA 2X100 / 87/ 120
INDRAVATI PG MENDHASAL FCI
0.9 172 MW
2X315 19
2x315 CHOUDWAR(T)
4x150 /490 BIDANASI
THERUVALI B.NAGAR CHANDAKA CUTTACK JAGATSINGPUR
JAYANAGAR 70/120
GAJUWAKA BHUBANESWAR P.NAKHARA
18/20 42/80 40/60
2x315 NAYAGARH 51/80
(A.P) JEYPORE IMFA
JEYPORE 4X100 /
(PG) 29 B.NAGAR PHULBANI
(PG) 2X100/ 100+160/ 29/65 370 MW
6x60+2x75 MW JK PUR 38/56
160 MW 194MW ASKA CHATRAPUR
BALIMELA 320MW 64/ 100 40 / 60 72/ 120
U.KOLAB 12 35/60 KESURA
P.H JAYANAGAR NARENDRAPUR 38/60 NIMAPARA
RAYAGADA Jagannathpur 44/65
U.SILERU 14/25 Traction 70/ 120
13 VBC 13 BALUGAON RS.PUR
2X100/ HAL 12/25
F. Alloys BERHAMPUR 40/ 72.5
120MW THERUVALI P.KHEMUNDI 54/100 2X160/
29/37.5 0 19/25 D.PAHANDI 240 MW Rambha
17/40 SUNABEDA CHANDAKA
3 MEENAKSHI 80 10 Traction
BALIMELA S/S DAMANJODI KAIPADAR Tr
28/ 37.5 10/25 7/12.5 37/52.5 IRE 16
114 MW MACHHKUND SOLARI Tr
(2 x12.5+3x4)MW C T.KHUNTI MOHANA 5 GANJAM PURI
A.SINGH 12/ 25 12.5
KHURDA 58/103
29 / 52.5
VIZAG 70/120
MACHKUND Rd(TR) 28 (TR) JCL 16
JAIPUR.TR S/S MALIGUDA (TR)
CH.KUSUMI(TR) Charged at 132 kV LEGEND
MANBAR(TR)
400kV LINE
PADWA(TR)
220kV LINE
132kV LINE
MAJOR GENERATING STATIONS WITH INTER-STATE TIE LINES

KORBA
(CHHATIS GARH)
OPGC
BHUSHAN VAL
KATAPALI IB TPS STERLITE
STEEL 2X210 MW 9x135 MW RAIPUR
BOLANGIR N 1x40+1x60+1x130 4 x 600 MW
+2x8=246 MW
OHPC
HIRAKUD
SAMBALPUR 2X49.5 MW
2X32.8 MW JAMSEDPUR
RAIRAKHOL BUDHIPADAR
SHYAM DRI 3X37.5 MW
ANGUL TSIL
1x 30 MW TARKERA BISRA 18.5+7.5 MW
CHAINPAL JAMSEDPUR
INDAL BOINDA DVC
JSP
ARYAN ISPAT 1X67.5 MW JODA
OHPC L
1x 18 MW 3X100 MW NALCO NTPC RC PUR
CHIPILIMA
3X24 MW 10X120 MW TTPS I OSISL PALASPONGA
OHPC 4X60 MW 1 X 24 MW
U. INDRAVATI KUCHEI RAIRANGAPUR KENDUPOSI
KESINGA
4 X 150 MW (KALBDIA) x
JSPL BARIPADA
3 X 135 MW
VAL OPCL x
OHPC OHPC
3x30 MW INDRAVATI PG 4 X 5 MW
U. KOLAB RENGALI
4 X 80 MW 5X50 MW BALASORE
NTPC DUBURI
RENGALI PG TTPS II BHADRAK
FACOR
2X110 MW DUBURI (N) 1 X 45 MW
MKD THERUVALI
OHPC
MERAMUNDALI PARADEEP
BALIMELA BHANJANAGAR VISA
6 X 60+ KOLAGHAT
RTFL 3 X 25 MW
2 X 75 MW JINDAL
NAYAGARH IFFCO ESSAR STAINLESS
JAYANAGAR PG NTPC 2 X 55 MW 2 X 125 MW
JAYANAGAR STPS
MENDHASAL GMR
CH BIDANASI 6X500 MW
AN
MEENAKSHI DA BSSL
3X4 + 2X12.5 K A (1x33+1x77+
NARENDRAPUR 2x150=410 MW
MACHAKUND CHOUDWAR
AARATI MERAMUNDALI
57.3 MW
[50 % Share] AARATI (IPP) 1X40 MW SHALIVAHANA
U. SILERU 1X50 MW ICCL 1X20MW
2X54 MW NBVL
1X30+1x65 MW
GAJUWAKA

KOLAR HVDC
INTER-STATE POWER EXCHANGE POINTS
MERAMUNDELI KANIHA

INDRAVATI PG INDRAVATI PH O MERAMUNDELI KANIHA


KUCHEI I
II
MENDHASAL
P MERAMUNDELI JEYAPORE PG

T
BISHRA
I TARKERA
C JODA JAMSEDPUR

KANIHA
II

RENGALI PH
L JODA RCPUR

JAYANAGAR JAYAPORE PG
S I
II
RENGALI PG I RENGALI S/Y
II Y MERAMUNDELI I KANIHA
KORBA I BUDHIPADAR II
II
III
S
TTPS KANIHA
KUCHEI I
II
BALASORE
T
KUCHEI BARIPADA
E JODA KENDUPOSI

KUCHEI RAIRANGAPUR M
LEGEND:
400 kV -
220 kV
132 kV
TRACTION POINTS IN OPTCL SYSTEM
Kenduposhi
Bhalulata
(JHARKHAND)
14MVA

Nuagaon Rourkela
9.5MVA 10.5MVA
CHHEND
Nalda
19.5MVA
JODA
ROURKELA

S.E. RLY TARKERA


Bansapani
17MVA

Chandiposh
13MVA PALASPONGA
RAJGANGPUR Rajgangpur
15MVA

Keonjhar Garh
Bamra 20MVA Hijli
14.5MVA (W.BENGAL)

Jharsuguda Jaleswar
RENGALI JALESWAR
17MVA 14.5MVA
JHARSUGUDA ARYAN-VIRAJ
EcoR
BALASORE
HIND METALS Balasore
SAMBALPUR 14.5MVA

Bhadrak BHADRAK
13MVA
Meramundali
8MVA

DHENKANAL
Joranda DUBURI
9MVA Jakhapura
NARENDRAPUR 20MVA
CHHATRAPUR
BALUGAON CHOUDWAR
Kendrapara Rd
KHURDA 13MVA
Rambha
Jagannathpur 12MVA
Solari
14MVA
12MVA
J.S.PUR
Gorakhnath
J.Pur Trac 5MVA
Kaipadar Road
5MVA Maliguda
15MVA
11MVA
Padwa
4.5MVA
J.NAGAR LEGEND
220kV
132kV
Ch. Kusumi Manbar MACHKUND 25kV
6MVA 12MVA M.Kund Rd
5.2MVA
GORKHAPUR
LACKNOW BALIA ER-NR MUZAFARPUR (PG) ER TRANSMISSION SYSTEM (220 kV & ABOVE) TALA
ER-NR 2x170 MW
PURNIA BONGAIGAON
2x210 MW
SARNATH KHAGAUL BINAGUDI
BIRAPARA SALAKATI
ARRAH PATNA MALDA DALKHOLA
CHUKHA
ALLAHABAD KAHALGAON
FATUA
B SHARIFF FARAKKA
NJP 4x84 MW

SASARAM 4x210 MW LALMATIA


3x200 +2X500 MW
S.GAON
SAHUPURI 2x210 MW
NJP (WB)
DEHRI
GOKARNA
BODHAGAYA TENUGHAT MAITHON PURULIA PG
B KSWAR
MUCHIPARA
2x210 MW
KALYANASWER
MEJIA B NAGAR

PATRATU

2x100 MW BOKARO CHANDRAPURA 4x210 MW


DPL SATGACHIA
4x110 MW DTPS
JAMSEDPUR
3x210 MW 1x110 MW
2x120 MW
1x210 MW SANTALDIHI
CHANDLI JAMSEDPUR DVC
RAMCHANDRAPUR ARAMBAG JEERAT
4x120 MW

BARIPADA DHARMA
JODA

BISRA
ER-WR
RENGALI PG DUBURI BHADRAK BALASORE DAMPURA
TTPS
BARKOT RENGALI PH KASBA
RENGALI S/W
5x 50 MW
RAYAGARH 2x 110 MW BIDANASI
HOWRAH
NALCO
E TARKERA TSTPS 8x 120 MW
R BHANJANAGAR
- LKANTAPUR
W
KORBA R CHANDAKA
4x 500 MW 2x 500 MW
MERAMUNADLI KOLAGHAT
BUDHIPADAR (SR) THERUVALI
INDRAVATI NAYAGARH
RAIPUR
IB TPS JEYPORE
4x 80 MW
2x210 MW NARENDRAPUR
4x 150 MW UPPER KOLAB
KOLAR INDRAVATI PG 6x 60 MW
LEGEND
400kV LINE JEYANAGAR
220kV LINE GAZUWAKA U SILURU
BALIMELA