WORK FOR CUSTOMER


S.NO. WORK
1 D
CIVIL WORK
2 ELECTRICITY ARRANGEMENT
3 CHANGEOVER NEAR CONTROL ROOM
6250
4 WATER TANK WITH A FEEDING PUMP (3/5
H.P)
5 DG SET AS RECOMMENDED
6 SUPPLY UPTO CHANGEOVER FROM D.G
SET
7 PLUMBING FROM WATER TANK TO
CHEMICAL SYSTEM
12500 8 PLUMBING FROM CHEMICAL SYSTEM TO
PLANT
9 CRANE/HYDRA AS PER REQUIREMENT C

LIKE UNLOADING & ERECTION

10 EARTHING AS GUIDE BY TECHNICIAN

11 PRINTER IF REQUIRED

6250

1250
2500
B B

1000

12500

BOM OF PARTITION WALLS


MATERIAL
S.NO. SIZE QTY.
DESCRIPTION
1 S-SHEET 2500X1250X3MM 45 NOS.

2 S-SHEET 2500X1250X4MM 30 NOS.

3 I-SECTION 200X100 48MTR LENGTH

4 I-SECTION 150X75X12 72 MTR LENGTH

5 I-SECTION 200X100 67MTR LENGTH

A 6 ANGLE 65X65X8,L=2500MM 30 NOS.

7 CHANNEL 75X40, L=2800MM 30 NOS.

8 ANGLE 50x50x6,L=2500MM 45 NOS.

9 ANGLE 50X50X6,L=2800MM 45 NOS.