2.4 RFQ Submission Details

Table 2.1 (below) details the RFQ information that the bidder shall submit with their quotation.

Proposal Headings Description

Health, Safety and a) Provide the bidder's HSE policy and proposed process for integrating
Environment HSE aspects into this Feasibility phase scope of work.

Strategy a) Describe project management


the and engineering design strategy the
bidder to provide successful
will use project delivery of the
'Feasibility' phase of the project, and the strategy that would be
deployed for the total project.

Personnel a) List the bidder's personnel that will be deployed to complete the
Feasibility phase and each person's proposed role in the project
team. (including % full time deployment)

b) Include the proposed utilisation of each person assigned to the project.

c) Provide CVs for all persons, including all project team members and
'subject matter experts'

Past Experience a) Provide details of past relevant projects completed by the bidder.

b) Provide a reference person (name I company I position/ contact


details) for these projects.

Cost a) Provide an itemised schedule of 'person hours' (and any other costs) to
complete the Phase II Feasibility work
scope. Use the format as per
Appendix 8 Cost - table {To be returned as Excel spreadsheet).

b) Provide a schedule of rates for all personnel proposed for this project.

Schedule a) Provide a detailed schedule of the key 'Feasibility' phase activities.


The duration of the 'Feasibility' phase shall not exceed 16 weeks.
AnticiQated commencement date is Monda:l£July 151h,2019

b) Provide a preliminary high-level schedule of the total Full HV&L V


Switchboard Replacement project (i.e. project phases three through
to five) based on experience from projects of similar complexity. The
schedule should include durations and sequence of the high-level
activities in each phase.
Include Long Lead Items (LLl's) in the schedule, and assume
wherever possible, equipment is installed prior to the turnaround.

Table 2. 1: RFQ Submission Requirements