Ritecase column formwork is a lightweight, durable, and customizable formwork solution for concrete columns. It can be manufactured in any required length or diameter. It is easy to handle, strip after use, and does not have any sharp edges. Ritecase formwork provides a robust and smooth finish to concrete columns at a competitive price. It reduces labor costs and project timelines through faster installation and stripping compared to traditional formwork.
Ritecase column formwork is a lightweight, durable, and customizable formwork solution for concrete columns. It can be manufactured in any required length or diameter. It is easy to handle, strip after use, and does not have any sharp edges. Ritecase formwork provides a robust and smooth finish to concrete columns at a competitive price. It reduces labor costs and project timelines through faster installation and stripping compared to traditional formwork.
Ritecase column formwork is a lightweight, durable, and customizable formwork solution for concrete columns. It can be manufactured in any required length or diameter. It is easy to handle, strip after use, and does not have any sharp edges. Ritecase formwork provides a robust and smooth finish to concrete columns at a competitive price. It reduces labor costs and project timelines through faster installation and stripping compared to traditional formwork.
SA 5013 SA 5012 ABN: 75 061 708 073 PRODUCTS www.ritecase.com.au PROUDLY SOUTH AUSTRALIAN
RITECASE column formwork is versatile and efficient: the
lightweight, strong and economical column form that can be manufactured in any length or diameter required Lightweight and easy to handle Easy to strip after column is formed Safe, with no razor sharp edges exposed when stripping Robust construction: durable against wet weather, knocks, on-site conditions etc Exact sizes for your required diameter and length. No wastage with incremental sizing Architectural grade smooth finish columns available - request a lined column when ordering Ready to go on site next day Available in 3 stiffnesses for in-situ, above ground and heavy duty Competitively priced Can be left in place to protect columns from corrosion and impact Reduced labour costs due to faster placing and stripping Quicker project completion time and lower installed cost LIGHT WEIGHT AND EASY TO cutting off in slabs or by one size’ to accommodate a HANDLE: unwinding from the column. designer’s request. There are no razor sharp edges The product is so light and easy when cut, making it easy to READY TO GO ON SITE NEXT to use that it is preferred by the dispose of, and no dangerous DAY: people who handle it. Crane scrap left on site. and excessive labour are Exact lengths allow for a very seldom required to place ROBUST CONSTRUCTION: short lead time, no cutting is RITECASE formwork. required on site and RITECASE RITECASE formwork stands up formwork is produced quickly TWO FINISHES AVAILABLE: to onsite conditions. It will resist to your specific requirements. knocking and denting from Next day delivery to most Structural: this will show a falling objects, is not affected by metropolitan areas is available spiral line on the finished rain and can be manhandled depending on order size. column. about the site very easily. Architectural: column forms REDUCES THE ‘CRITICAL lined with a rigid plastic sheet, MADE TO MEASURE: PATH’ TIMELINE: providing a smooth finish to the concrete column RITECASE formwork can be Due to the ease of stripping, ordered in 3 stiffnesses for use in RITECASE formwork can be in-situ, above ground and left on until the last moment. EASE OF STRIPPING AFTER heavy duty applications. The use of RITECASE COLUMN IS FORMED: RITECASE formwork is formwork reduces floor cycle produced in the diameter and time and cuts down the ‘Critical The inherent waxiness on length you require, meaning no Path’ timeline on the project RITECASE formwork ensures wastage and incremental chart. RITECASE formwork no form of oil application is sizing. RITECASE formwork is allows pouring of floor slabs required. RITECASE formwork also produced in any diameter and support columns to the is very easy to strip, as simple as between 250mm to 2000mm, slab at the same time. using a Stanley knife or saw. It thus eliminating the time is the quickest disposable honoured system of ‘going up Reduced labour costs equal formwork to strip, either by reduced overall building costs.
The rate of pour affects the load on the formwork. This chart is for the safe height of column that can be poured in an hour (in extreme conditions this time may vary).