S.N Description No.

length Breadth height area Quantity


1 Rafts
Left 1 12 10.9 2 130.8 261.6
Right 1 12 10.9 2 130.8 261.6
R1 1 10.5 9.5 2 99.75 199.5
R2 1 2 0 0
R3 1 2 0 0
R4 1 2 0 0
R5 1 2 0 0
2 Piers 0 0
Left 1 10.9 1.8 11.645 19.62 228.4749
Right 1 10.9 1.8 11.645 19.62 228.4749
P1 1 0 0
P2 1 0 0
P3 1 0 0
P4 1 0 0
P5 11 0 0
3 cap 0 0
Left 1 10.9 2.4 0.9 26.16 23.544
Right 1 0 0
R1 1 0 0
R2 1 0 0
R3 1 0 0
R4 1 0 0
R5 1 0 0
5 longitu Girder 15 43 0.3 2.7 12.9 522.45
6 cross girder 3 0 0
7 Slab 5 43 11 0.3 473 709.5
4 piles 80 21 0.8 1 0.502857 844.8
dry quantity

402.864
402.864
307.23
0
0
0
0
0
351.851346
351.851346 s
0
0
0
0
0
0
36.25776
0
0
0
0
0
0
804.573
0
1092.63
1300.992
5051.113452 m3
D X 0 480 2080 3480 5480 5730 7730
Y 2000 1953 1839 1730 1575 1556 1401
Z 0 0 0 0 0 0 0

1 X 0 480 2080 3480 5480 5730 7730


Y 1670 1637 1527 1430 1292 1275 1137
Z 0 0 0 0 0 0 0

2 X 0 480 2080 3480 5480 5730 7730


Y 1340 1311 1214 1130 1009 994 873
Z 0 0 0 0 0 0 0

3 X 0 480 2080 3480 5480 5730 7730


Y 1010 986 907 837 738 726 626
2 ND
Z 0 0 0 0 0 0 0CABEL
1600
4 X 0 480 2080 3480 5480 5730 7730
Y 680 662 602 549 474 465 315
Z 1400 0 0 0 0 0 0 0
1340
1311
5 X 0 480 2080 3480 5480 5730 7730
1214
Y 1200 350 341 311 285 135 135 135
Z -162.5 -162.5 1130
-162.5 -162.5 -162.5 -162.5 -162.5

1009
6 X 1000 0 480 2080 3480 994
1800 5480 5730 7730
Y 350 341 311 285 135 135 135
1670 873
Z 162.5 162.5 162.5 162.5 162.5
1637 162.5 162.5
800 1600 798
1527
677
1430
1400
600
557
1292
1275 526
1200
400
DUMMY
25000
1000
CABEL
2500 200

800
20000
0 0 0 0 0 00 0 0 0 0 0
0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 11000 12000 13000 140
2000 2000 600
1953
Y Z
1839
1730 15000
400
1575
1556
1500
1401
200
1304
10000
1149
1000 0 0 0 0 0 0 0
994 955
0 1000 2000 3000 4000 5000 6000 700

5000

500
1401
200
1304
10000
1149
1000 0 0 0 0 0 0 0
994 955
0 1000 2000 3000 4000 5000 6000 700

5000

500

0
0 5000
0
0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 11000 12000 13000 14000 15000

Y Z

6 TH CABEL

400
6 TH CABEL

400

350 350
341

311
300
285

250

200

162.5162.5 162.5 162.5 162.5


162.5 162.5 162.5 162.5 162.5162.5
150
135
135 135 135 135 135 135

100

50

0
0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 11000Y 12000 Z 13000 14000 15
8980 10980 12980 13480 15480 17480 19480 21480
1304 1149 994 955 800 645 495 495
0 0 0 0 0 0 0

8980 10980 12980 13480 15480 17480 19480 21480


1051 913 775 741 603 465 315 315
0 0 0 0 0 0 0 0

8980 10980 12980 13480 15480 17480 19480 21480


798 677 557 526 406 285 135 135
0 0 0 0 0 0 0

8980 10980 12980 13480 15480 17480 19480 21480


2 ND 564 465 315 315 315 315 315 315
CABEL 0 0 0 -180 -180 -180 -180 -180

8980 10980 12980 13480 15480 17480 19480 21480


315 315 315 315 315 315 315 315
0 180 180 180 180 180 180 180

8980 10980 12980 13480 15480 17480 19480 21480


135 135 135 135 135 135 135 135
1ST
-162.5 -162.5 -162.5 -162.5 -162.5 -162.5 -162.5 -162.5
CABEL
8980 10980 12980 13480 15480 17480 19480 21480
135 135 135 135 135 135 135 135
162.5 162.5 162.5 162.5 162.5 162.5 162.5 162.5

677
1430

557
1292
1275 526 5 TH CABEL
400 406
1137 4 TH
UMMY
ABEL 1051 CABEL
350 285
341
913
311
300 Y Z
285135 135
775
1200 741
0 0 0 0 0 0
10000 11000 12000 1010
13000
986 14000 15000 16000 17000 18000 19000 20000 21000 22000 23000
1000 603
907 200
Y Z
837
465
800 738
726
135
135 135 135 135
626 315
100 564
600
3465RD
1149 400 315315 315 315 315 315
0 0 0
994 955 0 0 0 0 0 0 0 0 0
0

1000

3000

4000

5000

6000

7000

8000

9000

10000

12000
2000

11000

0 4000 5000 6000 7000 8000 9000 10000 11000 12000 13000 14000 15000 16000 17000 18000 19000 2000
200
800
0 0 0 0 00 0 0Y 0Z 0
0 645
0 -100 5 0 0 0 10000 15000 20000
495 495 -180 -180 -180 -180 -180
564
600
3465RD
1149 400 315315 315 315 315 315
0 0 0
994 955 0 0 0 0 0 0 0 0 0

1000

3000

4000

5000

6000

7000

8000

9000

10000

12000
2000

11000
0 4000 5000 6000 7000 8000 9000 10000 11000 12000 13000 14000 15000 16000 17000 18000 19000 2000
200
800
0 0 0 0 00 0 0Y 0Z 0
0 645
0 -100 5 0 0 0 10000 15000 20000
495 495 -180 -180 -180 -180 -180
-200
-162.5
-162.5 -162.5 -162.5 -162.5
-162.5 -162.5 -162.5 -162.5

-400
5000 -200 10000 15000 20000
Row 25 X
000 12000 13000 14000 15000 16000 17000 18000 19000 20000 21000 22000 23000
Y Z

Y Z

6 TH CABEL
6 TH CABEL

162.5 162.5162.5 162.5 162.5 162.5 162.5

135 135 135 135 135 135 135

11000Y 12000 Z 13000 14000 15000 16000 17000 18000 19000 20000 21000 22000 23000
5 TH CABEL

465
135 135 135 135 135 135 135 135
315 315

15 315 315
0 0 0
9000

10000

12000

13000

14000

15000

16000

18000

19000

21000

22000
11000

17000

20000

23000

0 17000 18000 19000 20000 21000 22000 23000

20000 25000
80 -180 -180
15 315 315
0 0 0
9000

10000

12000

13000

14000

15000

16000

18000

19000

21000

22000
11000

17000

20000

23000
0 17000 18000 19000 20000 21000 22000 23000

20000 25000
80 -180 -180

2.5 -162.5 -162.5 -162.5


-162.5 -162.5 -162.5 -162.5 -162.5

20000 25000

Y Z
Government of Nepal
Ministry of Physical Infrastructure & Transport
Department of Roads
Bridge Branch
Project Coordination Unit
Lalitpur
Name of the project: Design and Build of Seti Nadi Bridge Contract No : BBPCU-DB-3371574-072/73-019
Location: Phoolbari connecting ward no.1 &11, Pokhara Budget Head : 337157-4
Proposed Bridge Length: 108 m
ESTIMATE
Item Departmental Estimate
Item Description Unit Quantity
No.
Rate (NRs) Amount (NRs)

Detailed Engineering Survey, Soil


Investigation, Detailed Design of bridge,
Approached Roads, Rivertraning and
Bridge Protection and preparation of
1
working Drawings and other necessary
Job 1 1,796,860.60 1,796,860.60
documents includings Environmental
Consideration (EIA or IEE) as stipulated
by the Respective acts and regulations

Construction of bridge as per approved


design and specification including
2
foundations, sub structures,superstructures
Job 1 235,357,388.20 235,357,388.20
and other ancillary works all complete
Construction of River Training Works U/S
3 and D/S of the river bank as per the Rm 300 33,388.30 10,016,490.00
approved design

Construction of Blacktopped approach road


as per the approved Design and
Specification with ancillary works all
4
complete (sub base-50mm, Base-25cm and
Rm 200 11,856.00 2,371,200.00
Ashpalt Concrete-50mm with prime coat
all complete.)

Providing and maintaining Engineer's


facilities (type A) as specied in the special
5
provisions of the contract with all
Months 30 20,000.00 600,000.00
necessary commodities etc.

Provide and erecting "W" metal beam


crashbarrier comprising of 3.43mm thick
corrugated sheet metal beam rail, 70cm
above road / ground level fixed on ISMC
series chanel vertical post 150*75*5mm
spaced 2m c/c 1.8m high, 1.1m below
ground/road level, all steel plates and
6
filament to be galvanised by hot deep
Rm 80 6,375.00 510,000.00
process all fitting to IS 1367 and IS 1364
metail beam rail to be fixed on the vertical
post with a spacer of chanel section
150*75*5mm, 330mm long all complete as
per specification and as directed by the
Engineer
Conduct all the test required on the
foundation, sub structures and
7 superstructure for final acceptance as per job 1 706,072.16 706,072.16
section VI, Employerss' requirements and
specification.

Insurance of personnel ( employees of


contractor, client and third party) plants,
8
equipments, material and vehicle as per
LS 1 948,617.00 948,617.00
conditions of contract
Mobilization and demobilization and
9
provision of performance securities.
LS 1 735,491.84 735,491.84

Sub-Total(A) 253,042,119.80
Provisional Sum for Relocation of Utilities
Social and Environmental mitigation
10
measures Bridge safety and Other
Ps 1 3,300,000.00 3,300,000.00
Unforseable Items
Total 256,342,119.80
Add 4% [of A] contigencies 10,121,684.79

Add 13% [of A] for VAT 429,000.00

Add 10% [of A] for physical contigencies


25,634,211.98
Add 10% [of A] for price adjustment
Contigencies
1,012,168.48
Grand Total 293,539,185.05