10 TBK
CALIFORNIA BEARING RATIO TEST
PROJECT : PRAKTIKUM MEKANIKA TANAH
LOCATION : LABORATORIUM MEKANIKA TANAH UNHAS
DATE : 4 Oktober 2004
TESTED BY : KELOMPOK II
Time Penetration Dial reading Load Load (lbs) Diagram of load vs penetration
(min) (mm) (inchi) (Dev) (lbs)
0.25 0.318 0.01272 3 12
150
0.5 0.625 0.025 9 32.6
1 1.27 0.0508 12 47.5 85,4
100
1.5 1.905 0.0762 28 56.2
56,2
2 2.54 0.1016 32 60.3
3 3.81 0.1524 40 73.9 50
4 5.08 0.2032 45 85.4
6 7.62 0.3048 52 97.8 0
8 10.1 0.404 61 135.6 0 0.1 0.2 0.3 0.4 0.5 0.6
10 12.7 0.508 62 140 Penetration (inch)
25 TBK
CALIFORNIA BEARING RATIO TEST
PROJECT : PRAKTIKUM MEKANIKA TANAH
LOCATION : LABORATORIUM MEKANIKA TANAH UNHAS
DATE : 4 Oktober 2004
TESTED BY : KELOMPOK II
Time Penetration Dial reading Load Load (lbs) Diagram of load vs penetration
(min) (mm) (inchi) (Dev) (lbs)
0.25 0.318 0.01272 2 15
200
0.5 0.625 0.025 5 28.6
1 1.27 0.0508 7 40.1 150
1.5 1.905 0.0762 15 59.7 100
100
2 2.54 0.1016 23 67.5 59,7
3 3.81 0.1524 31 64.7 50
4 5.08 0.2032 39 88.6
6 7.62 0.3048 47 129.3 0
8 10.1 0.404 50 156.8 0 0.1 0.2 0.3 0.4 0.5 0.6
10 12.7 0.508 25 160 Penetration (inch)
60 TBK
CALIFORNIA BEARING RATIO TEST
PROJECT : PRAKTIKUM MEKANIKA TANAH
LOCATION : LABORATORIUM MEKANIKA TANAH UNHAS
DATE : 4 Oktober 2004
TESTED BY : KELOMPOK II
Time Penetration Dial reading Load Load (lbs) Diagram of load vs penetration
(min) (mm) (inchi) (Dev) (lbs)
0.25 0.318 0.01272 5 60 400
0.5 0.625 0.025 11 78.4
1 1.27 0.0508 19 86.5 300
244,3
1.5 1.905 0.0762 26 99.3
2 2.54 0.1016 35 156.2 200 156,2
3 3.81 0.1524 45 178.9
100
4 5.08 0.2032 50 244.3
6 7.62 0.3048 59 264.6 0
8 10.1 0.404 64 297.9 0 0.1 0.2 0.3 0.4 0.5 0.6
10 12.7 0.508 68 312 Penetration (inch)
PEMERIKSAAN PERMEABILITY
PROJECT : PRAKTIKUM MEKANIKA TANAH
LOCATION : LABORATORIUM MEKANIKA TANAH UNHAS
DATE : 30 September 2004
TESTED BY : KELOMPOK II
SAND CONE
Proyek : Praktikum Mekanika Tanah
Lokasi : Lapangan Teknik UNHAS
Tanggal Percobaan : 30 September 2004
Kelompok : II
No Sampel :
Kedalaman Sampel : 0 - 20 cm
γ dry field
Relative Compaction =
( γ dry lab )
× 100 % =
(01 ..01757677814 ) × 100 % = 75.01761 %
KOMPAKSI
Proyek : Praktikum Mekanika Tanah
Lokasi : Laboratorium Mekanika Tanah
Tanggal Percobaan : 1 Oktober 2004
Kelompok : II
W wet
W dry =
1318.61 1390.08 1415.31 1399.58 1370.83
1+ (W 100 )
Volume mould (cm3) 1400.00 1400.00 1400.00 1400.00 1400.00
W dry
γ dry=
V mould ( gr cm )3
0.94 0.99 1.01 1.00 0.98
gw
1.74 1.65 1.58 1.51 1.45
Berat isi kering (gd)
1.4
Jadi kadar air optimum dicapai pada saat 28,73 % dan berat isi
1.3 kering 1,05 gram/cm³
1.2
1.1 1,05
1
f(x) = − 0.0015488597575 x² + 0.0862146581204 x
28,73
0.9 − 0.1888546162238
0.8
Kadar air (%)
10.00 15.00 20.00 25.00 30.00 35.00 40.00
3. HASIL PERHITUNGAN DAN INTERPRETASI PERCOBAAN
3. 1. HASIL PERHITUNGAN
0.25
0.2
f(x) = 0.14625 x + 0.059457611777903ø = 8,3065°
0.15
0.1
0.05 c = 0,0595
0
0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 1.1
Normal Stress, (kg/cm^2)
3. HASIL PERHITUNGAN DAN INTERPRETASI PERCOBAAN
3. 1. HASIL PERHITUNGAN
Corected Area
Disp Reading
Dial Reading
Axial Strain
Axial Force
Stress
Δh ε=Δh/h P=kol 3*LRC A=Ao/(1-Δh/h) σ=P/A
(mm) (%) (div) (kg) (cm²) (kg/cm)
0 0 5 0.925 9.6163 0.0961908426318
0.5 0.0071428571429 9 1.665 9.6854820143885 0.1719067773319
1 0.0142857142857 10 1.85 9.7556666666667 0.1896333754741
1.5 0.0214285714286 12 2.22 9.8268759124088 0.2259110646952
2 0.0285714285714 14 2.59 9.8991323529412 0.2616390919584
2.5 0.0357142857143 15 2.775 9.9724592592593 0.2782663661848
3 0.0428571428571 16 2.96 10.046880597015 0.2946188094322
3.5 0.05 17 3.145 10.122421052632 0.3106964217007
4 0.0571428571429 18.5 3.4225 10.199106060606 0.3355686252954
4.5 0.0642857142857 20 3.7 10.276961832061 0.3600285824218
5 0.0714285714286 21 3.885 10.356015384615 0.3751442862639
5.5 0.0785714285714 22 4.07 10.436294573643 0.3899851591271
6 0.0857142857143 23 4.255 10.517828125 0.4045512010114
6.5 0.0928571428571 24 4.44 10.600645669291 0.4188424119167
7 0.1 25 4.625 10.684777777778 0.432858791843
7.5 0.1071428571429 24 4.44 10.770256 0.4122464684219
8 0.1142857142857 23.5 4.3475 10.857112903226 0.4004287363272
Tegangan (kg/cm^2)
0.49
0,42
f(x) = − 24.3877537244419 x² + 5.41473788640626 x + 0.115289326682253
0.39
0.29
0.19
0.09
0 0.02 0.04 0.06 0.08 0.1 0.12
Regangan (%)
Hubungan antara konsisitensi tanah dengan kekuatan tanah lempung
dari Test Unconfined Compression
qu
Konsistensi
ton /ft2
Sangat Lunak 0 - 0.25
7,5 cm
Lunak 0.25 - 0.5 3,5 cm
Menengah 0.5 - 1.48
Kaku 1-2
Sangat Kaku 2-4 Gambar Retakan
Keras >4
Nomor Percobaan 1 2 3 4
100
90
80
70
50
1 10
Jumlah Tumbukan (Blows) 100
Nomor Percobaan 1 2
Nomor container
Berat Container, w1 (gr) 9.5 10
Berat Container + tanah basah, w2 (gr) 24 27
Berat Container + tanah kering, w3 (gr) 20 22.7
Berat air, ww = w2 - w3 (gr) 4 4.3
Berat tanah kering, ws = w3 - w1 (gr) 10.5 12.7
Kadar air, w = ww / ws x 100 % 38.10 33.8582677
Rata - rata 35.9768
No.test 1 2
W 4 −W
W=
13 , 6× ( W 3 −W
×100 0.4865917 0.17934
1 )
SL 20.836938 17.706839
Batas Susut (SL) = ### + ### 2 = 19.271888
3. HASIL PERHITUNGAN DAN INTERPRETASI PERCOBAAN
3. 1. HASIL PERHITUNGAN
Time of Elapsed Temp Actual Hyd. Correct Hyd. Hyd. Correction only L (from K ( from
Date % Finer L/t D, mm
Reading time, min o
C Reading (Ra) Reading (Rc) for meniscus ( R ) table) table)
10/5/2004 0.25 27° 29.0 34.0 67.456 30.0 11.5 46.0000 0.012318 0.0835
0.5 29.0 34.0 67.456 30.0 11.5 23.0000 0.012318 0.0591
1 28.0 33.0 65.472 29.0 11.7 11.7000 0.012318 0.0421
2 26.0 31.0 61.504 27.0 12.0 6.0000 0.012318 0.0302
4 24.0 29.0 57.536 25.0 12.4 3.1000 0.012318 0.0217
8 22.0 27.0 53.568 23.0 12.7 1.5875 0.012318 0.0155
15 18.0 23.0 45.632 19.0 13.3 0.8867 0.012318 0.0116
30 15.0 20.0 39.68 16.0 13.8 0.4600 0.012318 0.0084
60 12.0 17.0 33.728 13.0 14.3 0.2383 0.012318 0.0060
90 9.0 14.0 27.776 10.0 14.8 0.1644 0.012318 0.0050
120 7.0 12.0 23.808 8.0 15.2 0.1267 0.012318 0.0044
240 6.0 11.0 21.824 7.0 15.3 0.0638 0.012318 0.0031
10/6/2004 1440 6.0 11.0 21.824 7.0 15.3 0.0106 0.012318 0.0013
Rc = R actual-zero correction+CT
% finer = Rc.a/ws
D = K(L/t)0.5
Grafik Pembagian Butir Analisa Hidrometer
100
90
80
70
% Lolos
60
50
40
30
21,8
20
10
0 0,02 0,002
0.1000 0.0100 0.0010
Ukuran Butir (mm)
Recovery %
Number of Blows (Blow/cm)
Undisturbed Sample
R.O.D. %
Elevation in Meter
Relative Density
Depth in Meter
Consistency
Depth in Meter
Casing
Colour
Scale
Log
Log Description
N - Value (Blows/30 cm)
______
04
04
04
04
0
.0
.0
.0
0
20
40
60
0.
Coklat Lanau Berpasir
0,2
0,6
1 Coklat Lempung Berpasir
1.1
2
0,5
2.2
Coklat Lempung Berpasir
3,0 abu-abu
3
0,8
Coklat
4 Lempung Berpasir
kehita-
man
1,5
5
10
100
80
60
40
20
0
0.010 0.100 1.000 10.000 100.000
Diameter, mm
3. HASIL PERHITUNGAN DAN INTERPRETASI PERCOBAAN
3. 1. HASIL PERHITUNGAN
0 5 10152025
0 50 100 150 200 250 0
0 Total Ham batan P elek at, Tf(k g/c m ')
1
1
2 2
3 3
4 4
5
5
6
0 150 300 450 600 750 6
Legend :
Hambatan Konis, qc (kg/cm2)
Total Hambatan Pelekat, Tf (kg/cm')
3. HASIL PERHITUNGAN DAN INTERPRETASI PERCOBAAN
3. 1. HASIL PERHITUNGAN
CONSOLIDATION TEST DATA
PROJECT : PRAKTIKUM MEKTAN
BORING NUMBER : DH-2
BORING DEPTH : 1.0 - 1.55 METER
TESTING METHOD : ASTM D 2435-96, AASHTO T216-66 TESTED BY : KELOMPOK II
: DATE : 28/09-4/10-2004
Sample No. : DH-2 Sample : Height, Ho : 2.0 cm Specific Grafity, Gs : 2.69
Sample Dep. : 1.0 - 1.55 Diameter, D : 6.3 cm
WATER CONTENT DETERMINATION Test (1) test (2) UNIT WEIGHT DETERMINATION Before Test After Test
Weight of Wet Soil + Can, W1 (gram) 127.2 Weight of Ring, W1 (gram) 64.2 64.2
Weight of Dry Soil + Can, W2 (gram) 98.4 Weight of Wet Soil + Ring, W2 (gram) 174.5 158
Weght of Can, W3 (gram) 17.5 Weight of Dray Soil + Ring, W3 (gram) 123 123
Weight of Water, Ww=W1-W2 (gram) 28.8 Volume of Ring, V (cm )
3
62.31 62.31
Wet of Dray Soil, Ws (gram) 80.9 Water Content, ω=(W2-W3)/(W3-W1). 100% 87.59 59.52
Water Content,ω=Ww/Ws (%) 35.60 Wet Density of Soil, γwet=(W2-W1)/V (gram/cm3) 1.77 1.51
Average Water Content, ω (%) 35.60 Dry Density of Soil, γdry=γwet/(1+ω) (gram/cm )
3
0.944 0.944
CONSOLIDATION TIME DIAL READING
Load Applied (kg) 0.825 1.65 3.3 6.6 13.2 26.4 6.8 0.825 REMARKS
Consolidation Stresses (kg/cm2) 0.25 0.5 1 2 4 8 2 0.25
0 Second 0.000 Second 0.000 0.033 0.140 0.401 0.636 0.988 1.286 1.187
6 Second 2.449 Second 0.006 0.036 0.182 0.418 0.660 1.028 1.202 1.108
15 Second 3.873 Second 0.008 0.039 0.204 0.438 0.684 1.038 1.200 1.102
30 Second 5.477 Second 0.010 0.042 0.230 0.448 0.700 1.052 1.198 1.100
1 Minute 1.000 Minute 0.014 0.046 0.246 0.468 0.722 1.070 1.198 1.096
2 Minute 1.414 Minute 0.017 0.054 0.262 0.488 0.748 1.098 1.198 1.092
4 Minute 2.000 Minute 0.020 0.060 0.278 0.512 0.778 1.130 1.196 1.090
8 Minute 2.828 Minute 0.022 0.068 0.296 0.534 0.820 1.170 1.194 1.084
15 Minute 3.873 Minute 0.024 0.076 0.318 0.548 0.856 1.200 1.192 1.080
30 Minute 5.477 Minute 0.026 0.086 0.336 0.568 0.892 1.220 1.190 1.075
1 Hour 1.000 Hour 0.028 0.102 0.352 0.584 0.928 1.240 1.188 1.065
2 Hour 1.414 Hour 0.029 0.120 0.372 0.600 0.952 1.252 1.187 1.060
4 Hour 2.000 Hour 0.030 0.132 0.384 0.618 0.962 1.266
8 Hour 2.828 Hour 0.031 0.138 0.392 0.626 0.974 1.270
24 Hour 4.899 Hour 0.033 0.140 0.401 0.636 0.988 1.286
CONSOLIDATION TIME DETERMINATION
PROJECT : 0
LOCATION : PRAKTIKUM MEKTAN
BORING NUMBER : DH-2
BORING DEPTH : 1.0 - 1.55 METER
TESTING METHOD : ASTM D 2435-96, AASHTO T216-66 TESTED BY : KELOMPOK II
LABORATORY : 0 DATE : 28/09-4/10-2004
Sample No. : DH-2 Consolidation Pressure : 0.25 kg/cm2 Square Root Cons. Time 90%, Vt90 : 2.20 Minute
Sample Dep. : 1.0 - 1.55 Logaritmic Cons. Time 50%, t50 : 1.30 Minute
SQUARE ROOT OF TIME LOGARITHM OF TIME
(0.01)
0.01
x
0.01
0.02
d50
0.02
0.03
0.03
d100
0.03
Vt90
0.05 0.04
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 t1 t2 t5010
1 100 1000 10000
Vt90 (Minute) Logarithm of Time, t (Minute)
0.16 0.16
0.17
0.18
Vt90
0.19
0.20 0.20
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 1 t1 t2 10
t50100 1000 10000
Vt90, (Minute) Logarithm of Time, t (Minute)
Vt90 = 6 t50 = 25
t90 = 36
CONSOLIDATION TIME DETERMINATION
PROJECT : 0
LOCATION : PRAKTIKUM MEKTAN
BORING NUMBER : DH-2
BORING DEPTH : 1.0 - 1.55 METER
TESTING METHOD : ASTM D 2435-96, AASHTO T216-66 TESTED BY : KELOMPOK II
LABORATORY : HASANUDDIN UNIVERSITY DATE : 28/09-4/10-2004
Sample No. : DH-2 Consolidation Pressure : 1 kg/cm2 Square Root Cons. Time 90%, Vt90 : 2.00 Minute
Sample Dep. : 1.0 - 1.55 Logaritmic Cons. Time 50%, t50 : 2.8 Minute
SQUARE ROOT OF TIME LOGARITHM OF TIME
0.30 0.30
0.35 0.35D100
0.40 0.40
0.45 0.45
Vt90
0.50 0.50
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40
t1 t2 t50
1 10 100 1000 10000
Vt90 = 2
t90 = 4 t50 = 2.8
CONSOLIDATION TIME DETERMINATION
PROJECT : 0
LOCATION : PRAKTIKUM MEKTAN
BORING NUMBER : DH-2
BORING DEPTH : 1.0 - 1.55 METER
TESTING METHOD : ASTM D 2435-96, AASHTO T216-66 TESTED BY : KELOMPOK II
LABORATORY : HASANUDDIN UNIVERSITY DATE : 28/09-4/10-2004
Sample No. : DH-2 Consolidation Pressure : 2 kg/cm2 Square Root Cons. Time 90%, Vt90 : 3.20 Minute
Sample Dep. : 1.0 - 1.55 Logaritmic Cons. Time 50%, t50 : 4.40 Minute
SQUARE ROOT OF TIME LOGARITHM OF TIME
0.40
D0
0.40
x
0.45 0.45 x
0.55 0.55
0.65 0.65
Vt90
0.70 0.70
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 1
t1 t2 10
t50 100 1000 10000
0.50
0.70 0.70 x
0.75 0.75
D50
0.80 0.80
0.85 0.85
0.90 0.90
D100
0.95 0.95
Vt90
1.00 1.00
t1 t2 t50
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 1 10 100 1000 10000
D0
1.00 1.00
x
x
1.20 1.20
D10
0
1.30 1.30
1.40 1.40
Vt90
1.50 1.50
t1 t2 t50
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 1 10 100 1000 10000
Cv = ( 0.197 x d 2 )/t50
Cv = ( 0.848 x d 2 )/t90
Koefisien Konsolidasi
Koefisien Konsolidasi
Angka Pori, e=e0-de
t50 (menit)
t90 (menit)
dH (cm)
d (cm)
0 0 2 0 0 6.2132 - -
0.25 0.033 1.9967 0.0033 0.0119 6.2013 0.00165 1.9984 1.3 4.84 0.1513 0.1749
0.50 0.140 1.9860 0.0140 0.0505 6.1627 0.00865 1.9914 25 36.00 0.0078 0.0234
1.00 0.401 1.9599 0.0401 0.1446 6.0686 0.02705 1.9730 2.8 4.00 0.0685 0.2063
2.00 0.636 1.9364 0.0636 0.2294 5.9839 0.05185 1.9482 4.4 10.24 0.0425 0.0786
4.00 0.988 1.9012 0.0988 0.3563 5.8569 0.0812 1.9188 5.2 10.24 0.0349 0.0762
8.00 1.286 1.8714 0.1286 0.4638 5.7494 0.1137 1.8863 3.5 4.00 0.0501 0.1886
2.00 1.187 1.8813 0.1187 0.4281 5.7851 0.12365 1.8764
0.25 1.060 1.8940 0.1060 0.3823 5.8309 0.11235 1.8877
P1 (kg/cm2) = 0.25
P2 (kg/cm2) = 2
e1 = 5.83
e2 = 5.79
Cs = (e1-e2)/log(p2/p1)
Cs = 0.044
Koefisien Konsolidasi
Grafik Hubungan Antara Tekanan & Koefisien Konsolidasi
0.2500
0.2000
t90
t50
0.1500
0.1000
0.0500
0.0000
0.10 1.00 10.00
Tekanan Konsolidasi (kg/cm2)
6.30
Angka Pori (e)
6.20
6.10
6.00
5.90
5.80
5.70
5.60
5.50
0.10 1.00 10.00
Tekanan (kg/cm2)